DOB filing M01398470-P1
Alteration filing at 80 Broad Street
Building record · BIN 1000038
80 Broad Street, Manhattan, NY 10004
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 10 independently sourced records, including 10 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1000038
80 Broad Street
Financial District-Battery Park City, Manhattan
A consolidated public-record view · updated Sep 18, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 37-story office building built in 1935, on a 13,135 sq ft lot.
Owner of record
16 BEAVER ST. R.E. HOLDINGS, LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 22, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 1 open notice on record for this building, out of 209 notices on file; the most recent was issued Sep 3, 2019.
Issued Sep 3, 2019 — FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 22, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1000038. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 10 alteration filing. Its latest status categories are 1 under review, 9 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 80 Broad Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 10 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Installation of sidewalk shed and construction fence as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application. Filing M01398037-I1.
DOB lists a first permit date for M01398037-I1. That is not by itself confirmation of activity on site.
Installation of 7,000 lb dual personnel hoist cars as per plans during construction. hoist shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application. Filing M01402028-I1.
DOB lists a first permit date for M01402028-I1. That is not by itself confirmation of activity on site.
Installation of suspended scaffold for facade inspection/repair. Filing M01385244-I1.
Filing M01385244-I1 reached an approved status.
DOB lists a first permit date for M01385244-I1. That is not by itself confirmation of activity on site.
Modification of the sprinkler system in association with interior removals, by others. there is no change to use, egress, or occupancy. Filing M01438080-I1.
Filing M01438080-I1 reached an approved status.
The latest status recorded for M01438080-I1 is “Approved.”
Installation of suspended scaffold for facade inspection/repair. Filing M01385244-P2.
Conversion of existing wet standpipe to dry air-pressurized alarm system per BC 3303.8. Filing M01363286-S1.
Removal of existing sprinklers. Filing M01363286-S2.
Filing M01385244-P2 reached an approved status.
The latest status recorded for M01385244-P2 is “Approved.”
The latest status recorded for M01385244-I1 is “Permit Entire.”
Filing M01363286-S1 reached an approved status.
Filing M01363286-S2 reached an approved status.
The latest status recorded for M01363286-S2 is “Approved.”
Installation of 7,000 lb dual personnel hoist cars as per plans during construction. hoist shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application. Filing M01402028-P1.
Installation of sidewalk shed and construction fence as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application. Filing M01398037-P1.
Filing M01402028-P1 reached an approved status.
The latest status recorded for M01402028-P1 is “Approved.”
The latest status recorded for M01402028-I1 is “Permit Entire.”
Filing M01398037-P1 reached an approved status.
The latest status recorded for M01398037-P1 is “Approved.”
The latest status recorded for M01398037-I1 is “Permit Entire.”
Installation of temporary roof protection as per plans. temporary protection shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application. Filing M01398470-P1.
The latest status recorded for M01398470-P1 is “Prof Cert QA Review.”
DOB lists a first permit date for M01363286-S1. That is not by itself confirmation of activity on site.
The latest status recorded for M01363286-S1 is “Permit Entire.”