Cross-section
What is actually being done to the building?
A filing records the kind of job — a new building, an alteration, a demolition — but it also records what the work physically involves. That second layer cuts across the first, and it is the only way to ask a question like “where is solar going in” without reading every alteration in the city.
One filing can carry several of these at once: excavation, foundation and structural work often travel together on the same job. Counts therefore overlap by design.
Plumbing work
What plumbing work is filed in New York City?
The commonest kind of work there is: 217,350 filings across the city carry a plumbing flag, from a replaced riser to a whole new system.
General construction
What general construction is filed in New York City?
The broadest category on a filing: interior and envelope work that is not separately flagged.
Sidewalk sheds
Who filed for the sidewalk shed outside?
The scaffold tunnel over the pavement — the most visible building work in New York, and the one New Yorkers ask about most.
Mechanical systems
What mechanical work is filed in New York City?
Heating, ventilation and cooling — the plant that makes a building habitable, and the work most often filed alongside a conversion.
Structural work
What structural work is filed in New York City?
Work that touches the frame a building stands on — the filings most likely to change what a building can carry.
Scaffolding
Where is scaffolding filed in New York City?
Work platforms up the side of a building, filed separately from the shed at its foot.
Fences and hoardings
What fence work is filed in New York City?
The boarding that goes up around a site before anything else does, and the fences that stay when it comes down.
Sprinkler work
Where are sprinklers being filed in New York City?
Automatic fire suppression, filed on its own track because the city inspects it on its own track.
Signs
What signs are filed in New York City?
Illuminated and structural signage, which the city permits as building work rather than as advertising.
Earthwork and excavation
Where is excavation filed in New York City?
Excavation and site work — usually the first visible sign that something is coming.
Foundation work
What foundation work is filed in New York City?
Footings, underpinning and the work that happens before a building goes up.
Curb cuts
Where are curb cuts filed in New York City?
A driveway across the pavement. Small work, and the permission a garage or loading bay depends on.
Standpipe work
What standpipe work is filed in New York City?
The dry and wet pipes a fire department connects its hoses to, required in most buildings above a certain height.
Solar installations
Where is solar being installed in New York City?
Filings that record photovoltaic work on a roof or facade, anywhere in the five boroughs.
Antennas
Where are antennas being filed in New York City?
Rooftop telecommunications equipment, filed as structural work on the building that carries it.
The other layer
By the kind of job filed.
Built from DOB NOW: Build – Job Application Filings (w9ak-ipjd), accessed Oct 2, 2026.