41-60 74 Street
Elmhurst, Queens
Work type
1126 filings in the current snapshot are recorded as demolitions, across 5 boroughs. 78 changed status in the last 7 days.
The city sorts filings by the kind of work proposed. A filing records what was submitted, not what has been built: many are approved and never started, and some are withdrawn.
1,126 demolition filings are on record — 0.8% of every filing published here, and every one of them has moved in the last 90 days.
Queens holds 9% of everything on record but 29% of demolitions — more than 3 times the citywide rate.
29% here · 9% citywide · Open Queens
A demolition filing is permission sought, not a building already gone. Some are approved and never carried out, and the date on each record is when the filing last changed status, not when a wall fell. The catalog is a rolling window over recent Department of Buildings activity rather than the city’s whole history, which is why the figures above are given as shares — a share survives the window, a count does not. How the record is built.
How to read this page
Across the city the snapshot holds 335 in Brooklyn, 329 in Queens, 209 in Manhattan, 174 in Bronx, 79 in Staten Island. Counts follow the city's own classification, so a project that involves more than one kind of work appears under the type its filing was submitted as. Open an individual record for its exact status, scope and identifiers.
Built from DOB NOW: Build – Job Application Filings (w9ak-ipjd), accessed Nov 13, 2026.