Building record · BIN 1000057

200 Liberty Street

200 Liberty Street, Manhattan, NY 10281

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 30 independently sourced records, including 29 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 1000057

200 Liberty Street

Financial District-Battery Park City, Manhattan

A consolidated public-record view · updated Sep 11, 2026

DOB filings
30
Active-status
29
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings30
Open or active-status records29
First included filingAug 5, 2025
Latest recorded changeSep 11, 2026

The lot

What is already here?

The lot holds a 40-story office building built in 1986, on a 94,530 sq ft lot.

Built
1986
Last altered
2015
Floors
40
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
BPC
Lot area
94,530 sq ft
Building area
1,501,878 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 13, 2026. They describe the tax lot, not any single filing.

Violation record

Are there open violations here?

No open violations are recorded for this building. 154 notices are on file, all with a recorded resolution.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 13, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1000057. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 30 alteration filing. Its latest status categories are 25 approved, 4 under review, 1 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Aug 5, 2025
Latest recorded change
Sep 11, 2026
Highest proposed story count
39 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 200 Liberty Street.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 30 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Mechanical work as shown on plans filed herewith. No change to use, egress or occupancy. Filing M01229559-S2.

    01
  2. Alteration approved

    Filing M01229559-S2 reached an approved status.

    02
  3. Permit recorded for alteration

    DOB lists a first permit date for M01229559-S2. That is not by itself confirmation of activity on site.

    03
  4. Alteration filed

    General construction as shown on plans filed herewith. No change in use, egress, and occupancy. Filing M01406176-I1.

    04
  5. Alteration filed

    General construction as shown on plans filed herewith. No change in use, egress, and occupancy. Filing M01406211-I1.

    05
  6. Alteration filed

    General construction as shown on plans filed herewith. No change in use, egress, and occupancy. Filing M01406302-I1.

    06
  7. Alteration filed

    Structural work as shown on plans filed herewith. No change in use, egress, or occupancy. Filing M01406204-I1.

    07
  8. Alteration approved

    Filing M01406204-I1 reached an approved status.

    08
  9. Alteration filed

    Install temporary construction fence/barricade with roof, framing, bracing, anchorage and access doors at 1st floor west street storefront. no change in use, egress or occupancy. Filing M01333788-S5.

    09
  10. Permit recorded for alteration

    DOB lists a first permit date for M01333788-S5. That is not by itself confirmation of activity on site.

    010
  11. Alteration now approved

    The latest status recorded for M01333788-S5 is “Permit Entire.”

    011
  12. Alteration now under review

    The latest status recorded for M01406302-I1 is “Chief Plan Examiner/ Assistant Chief Plan Examiner Review.”

    012
  13. Permit recorded for alteration

    DOB lists a first permit date for M01406204-I1. That is not by itself confirmation of activity on site.

    013
  14. Alteration now approved

    The latest status recorded for M01406204-I1 is “Permit Entire.”

    014
  15. Alteration approved

    Filing M01406211-I1 reached an approved status.

    015
  16. Alteration filed

    Removal of existing plumbing fixtures and associated piping as indicated on plans. no change to use, egress, or occupancy. Filing M01448375-S1.

    016
  17. Alteration approved

    Filing M01448375-S1 reached an approved status.

    017
  18. Alteration filed

    Removal of existing bathroom fixtures and finishes only on the 6th and 7th floors. removal of non-structural operable partition steel. no change to use, egress, or occupancy. Filing M01448375-I1.

    018
  19. Alteration approved

    Filing M01448375-I1 reached an approved status.

    019
  20. Permit recorded for alteration

    DOB lists a first permit date for M01406211-I1. That is not by itself confirmation of activity on site.

    020
  21. Alteration now approved

    The latest status recorded for M01406211-I1 is “Permit Entire.”

    021
  22. Permit recorded for alteration

    DOB lists a first permit date for M01448375-I1. That is not by itself confirmation of activity on site.

    022
  23. Alteration now approved

    The latest status recorded for M01448375-I1 is “Permit Entire.”

    023
  24. Alteration signed off

    DOB recorded a sign-off for M01229559-S2.

    024
  25. Alteration now completed

    The latest status recorded for M01229559-S2 is “LOC Issued.”

    025
  26. Alteration now under review

    The latest status recorded for M01406176-I1 is “Plan Examiner Review.”

    026
  27. Alteration filed

    Sprinkler/Standpipe work as shown on plans filed herewith. Filing M01405103-S3.

    027
  28. Alteration filed

    Plumbing work as shown on plans filed herewith. Filing M01409833-S1.

    028
  29. Alteration filed

    Plumbing work as shown on plans filed herewith. Filing M01409825-S1.

    029
  30. Alteration filed

    Sprinkler/Standpipe work as shown on plans filed herewith. Filing M01409843-S2.

    030
  31. Alteration filed

    Plumbing work as shown on plans filed herewith. Filing M01409843-S1.

    031
  32. Alteration filed

    Plumbing work as shown on plans filed herewith. Filing M01405103-S2.

    032
  33. Alteration filed

    Mechanical work as shown on plans filed herewith. Filing M01406285-S1.

    033
  34. Alteration filed

    Plumbing work as shown on plans filed herewith. Filing M01406285-S2.

    034
  35. Alteration filed

    Sprinkler/Standpipe work as shown on plans filed herewith. Filing M01406285-S3.

    035
  36. Alteration filed

    Mechanical work as shown on plans filed herewith. Filing M01406219-S1.

    036
  37. Alteration filed

    Plumbing work as shown on plans filed herewith. Filing M01406219-S2.

    037
  38. Alteration filed

    Sprinkler/Standpipe work as shown on plans filed herewith. Filing M01406219-S3.

    038
  39. Alteration filed

    Mechanical work as shown on plans filed herewith. No change in use, egress, or occupancy. Filing M01409833-I1.

    039
  40. Alteration filed

    Mechanical work as shown on plans filed herewith. No change in use, egress, or occupancy. Filing M01409825-I1.

    040
  41. Alteration filed

    Mechanical work as shown on plans filed herewith. No change in use, egress, or occupancy. Filing M01409819-I1.

    041
  42. Alteration filed

    Mechanical work as shown on plans filed herewith. No change in use, egress, or occupancy. Filing M01409843-I1.

    042
  43. Alteration filed

    Sprinkler/Standpipe work as shown on plans filed herewith. Filing M01409833-S2.

    043
  44. Alteration filed

    Sprinkler/Standpipe work as shown on plans filed herewith. Filing M01409819-S2.

    044
  45. Alteration filed

    Plumbing work as shown on plans filed herewith. Filing M01409819-S1.

    045
  46. Permit recorded for alteration

    DOB lists a first permit date for M01448375-S1. That is not by itself confirmation of activity on site.

    046
  47. Alteration now approved

    The latest status recorded for M01448375-S1 is “Permit Entire.”

    047
  48. Alteration approved

    Filing M01409843-S1 reached an approved status.

    048
  49. Alteration approved

    Filing M01405103-S2 reached an approved status.

    049
  50. Alteration filed

    Mechanical work as shown on plans filed herewith. Filing M01405103-S1.

    050
  51. Alteration approved

    Filing M01409843-I1 reached an approved status.

    051
  52. Alteration approved

    Filing M01405103-S3 reached an approved status.

    052
  53. Alteration approved

    Filing M01409833-S1 reached an approved status.

    053
  54. Alteration approved

    Filing M01409825-S1 reached an approved status.

    054
  55. Alteration approved

    Filing M01409843-S2 reached an approved status.

    055
  56. Alteration approved

    Filing M01406285-S1 reached an approved status.

    056
  57. Alteration approved

    Filing M01406285-S2 reached an approved status.

    057
  58. Alteration approved

    Filing M01406285-S3 reached an approved status.

    058
  59. Alteration approved

    Filing M01406219-S1 reached an approved status.

    059
  60. Alteration approved

    Filing M01406219-S2 reached an approved status.

    060
  61. Alteration approved

    Filing M01406219-S3 reached an approved status.

    061
  62. Alteration approved

    Filing M01409833-I1 reached an approved status.

    062
  63. Alteration approved

    Filing M01409825-I1 reached an approved status.

    063
  64. Alteration approved

    Filing M01409819-I1 reached an approved status.

    064
  65. Alteration approved

    Filing M01405103-S1 reached an approved status.

    065
  66. Alteration approved

    Filing M01409833-S2 reached an approved status.

    066
  67. Alteration now approved

    The latest status recorded for M01409833-S2 is “Approved.”

    067
  68. Alteration approved

    Filing M01409819-S2 reached an approved status.

    068
  69. Alteration now approved

    The latest status recorded for M01409819-S2 is “Approved.”

    069
  70. Alteration approved

    Filing M01409819-S1 reached an approved status.

    070
  71. Alteration now approved

    The latest status recorded for M01409819-S1 is “Approved.”

    071
  72. Permit recorded for alteration

    DOB lists a first permit date for M01405103-S3. That is not by itself confirmation of activity on site.

    072
  73. Permit recorded for alteration

    DOB lists a first permit date for M01406285-S1. That is not by itself confirmation of activity on site.

    073
  74. Alteration now approved

    The latest status recorded for M01406285-S1 is “Permit Entire.”

    074
  75. Permit recorded for alteration

    DOB lists a first permit date for M01406285-S2. That is not by itself confirmation of activity on site.

    075
  76. Alteration now approved

    The latest status recorded for M01406285-S2 is “Permit Entire.”

    076
  77. Permit recorded for alteration

    DOB lists a first permit date for M01406285-S3. That is not by itself confirmation of activity on site.

    077
  78. Alteration now approved

    The latest status recorded for M01406285-S3 is “Permit Entire.”

    078
  79. Permit recorded for alteration

    DOB lists a first permit date for M01406219-S1. That is not by itself confirmation of activity on site.

    079
  80. Alteration now approved

    The latest status recorded for M01406219-S1 is “Permit Entire.”

    080
  81. Permit recorded for alteration

    DOB lists a first permit date for M01406219-S2. That is not by itself confirmation of activity on site.

    081
  82. Alteration now approved

    The latest status recorded for M01406219-S2 is “Permit Entire.”

    082
  83. Permit recorded for alteration

    DOB lists a first permit date for M01406219-S3. That is not by itself confirmation of activity on site.

    083
  84. Alteration now approved

    The latest status recorded for M01406219-S3 is “Permit Entire.”

    084
  85. Permit recorded for alteration

    DOB lists a first permit date for M01409833-I1. That is not by itself confirmation of activity on site.

    085
  86. Alteration now approved

    The latest status recorded for M01409833-I1 is “Permit Entire.”

    086
  87. Permit recorded for alteration

    DOB lists a first permit date for M01409825-I1. That is not by itself confirmation of activity on site.

    087
  88. Alteration now approved

    The latest status recorded for M01409825-I1 is “Permit Entire.”

    088
  89. Permit recorded for alteration

    DOB lists a first permit date for M01409819-I1. That is not by itself confirmation of activity on site.

    089
  90. Alteration now approved

    The latest status recorded for M01409819-I1 is “Permit Entire.”

    090
  91. Permit recorded for alteration

    DOB lists a first permit date for M01405103-S1. That is not by itself confirmation of activity on site.

    091
  92. Alteration now approved

    The latest status recorded for M01405103-S1 is “Permit Entire.”

    092
  93. Permit recorded for alteration

    DOB lists a first permit date for M01409843-I1. That is not by itself confirmation of activity on site.

    093
  94. Alteration now approved

    The latest status recorded for M01409843-I1 is “Permit Entire.”

    094
  95. Alteration filed

    Sprinkler work as shown on plans filed herewith. No change to use, egress or occupancy. Filing M01229559-P2.

    095
  96. Permit recorded for alteration

    DOB lists a first permit date for M01409843-S2. That is not by itself confirmation of activity on site.

    096
  97. Alteration now approved

    The latest status recorded for M01409843-S2 is “Permit Entire.”

    097
  98. Permit recorded for alteration

    DOB lists a first permit date for M01409843-S1. That is not by itself confirmation of activity on site.

    098
  99. Alteration now approved

    The latest status recorded for M01409843-S1 is “Permit Entire.”

    099
  100. Permit recorded for alteration

    DOB lists a first permit date for M01405103-S2. That is not by itself confirmation of activity on site.

    0100
  101. Alteration now approved

    The latest status recorded for M01405103-S2 is “Permit Entire.”

    0101
  102. Alteration now approved

    The latest status recorded for M01405103-S3 is “Permit Entire.”

    0102
  103. Permit recorded for alteration

    DOB lists a first permit date for M01409833-S1. That is not by itself confirmation of activity on site.

    0103
  104. Alteration now approved

    The latest status recorded for M01409833-S1 is “Permit Entire.”

    0104
  105. Permit recorded for alteration

    DOB lists a first permit date for M01409825-S1. That is not by itself confirmation of activity on site.

    0105
  106. Alteration now approved

    The latest status recorded for M01409825-S1 is “Permit Entire.”

    0106
  107. Alteration filed

    Sprinkler/Standpipe work as shown on plans filed herewith. Filing M01409825-S2.

    0107
  108. Alteration now under review

    The latest status recorded for M01409825-S2 is “Prof Cert QA Review.”

    0108
  109. Alteration now under review

    The latest status recorded for M01229559-P2 is “Plan Examiner Review.”

    0109