DOB filing M01474816-I1
Alteration filing at 225 Liberty Street
Building record · BIN 1000058
225 Liberty Street, Manhattan, NY 10281
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 23 independently sourced records, including 10 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1000058
225 Liberty Street
Financial District-Battery Park City, Manhattan
A consolidated public-record view · updated Nov 16, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 44-story office building built in 1987, on a 199,346 sq ft lot.
The apartments
1920 condominium apartments are assessed on this block, and the typical one is 822 sq ft (76 m²). They run from 47 to 616 m².
The city values the typical one at $327,864. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.
What it sold for
155 apartments on this tax block changed hands in the year the city last published, at a median of $1,250,000, from 425,000 to 11,950,000.
Recorded sale prices from the Department of Finance’s rolling file, covering the year to Sep 30, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.
Owner of record
NYC DOT
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 18, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
No open violations are recorded for this building. 335 notices are on file, all with a recorded resolution.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 18, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1000058. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 23 alteration filing. Its latest status categories are 6 approved, 4 under review, 13 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 225 Liberty Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 23 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Interior office renovations to specified floor. No change to use, egress or occupancy. Filing M01121344-I1.
Filing M01121344-I1 reached an approved status.
Plumbing work as shown on plans filed herewith. Filing M01121344-S2.
Mechanical work as shown on plans filed herewith. Filing M01121344-S1.
Sprinkler work as shown on plans filed herewith. Filing M01120864-S3.
Filing M01121344-S2 reached an approved status.
Filing M01121344-S1 reached an approved status.
Filing M01120864-S3 reached an approved status.
Structural steel design for new office fit-out. Filing M01120864-S5.
Filing M01120864-S5 reached an approved status.
Relocation of house cabinets. Filing M01120864-S4.
DOB lists a first permit date for M01121344-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01121344-S1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01120864-S3. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01121344-S2. That is not by itself confirmation of activity on site.
Filing M01120864-S4 reached an approved status.
DOB lists a first permit date for M01120864-S4. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01120864-S5. That is not by itself confirmation of activity on site.
General construction in conjunction with interior renovation of Space 127 as shown on plans. No change in use, egress or occupancy. Filing M01292279-I1.
Filing M01292279-I1 reached an approved status.
Demolition of existing fire hose valve cabinet with installation of new fire hose valve cabinet and new supervised isolation valve. no change in use, egress or occupancy. Filing M01292279-S4.
Nstallation of first floor sprinkler main and sprinkler heads to support tenant programming layout. no change in use, egress or occupancy. Filing M01292279-S3.
Installation of new plumbing fixtures with associated cold water, hot water, hot water return, vent and sanitary piping. new installation of under-cabinet ejector pumps, hot water heater & hot water circulation pump. no change in use, egress or occupancy. Filing M01292279-S2.
Filing M01292279-S4 reached an approved status.
Filing M01292279-S3 reached an approved status.
Filing M01292279-S2 reached an approved status.
DOB lists a first permit date for M01292279-S4. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01292279-S3. That is not by itself confirmation of activity on site.
Structural alteration works on the first floor including adding new secondary steel framing for fixtures. no change in use, egress or occupancy. Filing M01292279-S5.
Filing M01292279-S5 reached an approved status.
DOB lists a first permit date for M01292279-S2. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01292279-S5. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01292279-I1. That is not by itself confirmation of activity on site.
General Construction as shown on plans filed herewith Suite 118 (Nike). No change to use, egress or occupancy. Filing M01318500-I1.
Filing M01318500-I1 reached an approved status.
DOB lists a first permit date for M01318500-I1. That is not by itself confirmation of activity on site.
Relocation of Fire Department valve cabinet. Filing M01337713-S4.
Sprinkler work as shown on plans filed herewith. No change to egress, use or occupancy. Filing M01337713-S3.
Mechanical work as shown on plans filed herewith. No change to use, egress or occupancy. Filing M01337713-S1.
Sprinkler modification in conjunction with renovation of an existing retail space. Filing M01324908-S3.
Filing M01337713-S4 reached an approved status.
Filing M01337713-S3 reached an approved status.
Filing M01337713-S1 reached an approved status.
DOB lists a first permit date for M01337713-S1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01337713-S3. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01337713-S4. That is not by itself confirmation of activity on site.
Filing M01324908-S3 reached an approved status.
DOB lists a first permit date for M01324908-S3. That is not by itself confirmation of activity on site.
Mechanical work as shown on plans filed herewith. Filing M01386691-S1.
Filing M01386691-S1 reached an approved status.
DOB lists a first permit date for M01386691-S1. That is not by itself confirmation of activity on site.
Mechanical work as shown on plans filed herewith. No change to use, egress or occupancy. Filing M01337713-P1.
The latest status recorded for M01337713-P1 is “Prof Cert QA Review.”
The latest status recorded for M01337713-S1 is “Permit Entire.”
DOB recorded a sign-off for M01337713-S4.
The latest status recorded for M01337713-S4 is “LOC Issued.”
DOB recorded a sign-off for M01337713-S3.
The latest status recorded for M01337713-S3 is “LOC Issued.”
DOB recorded a sign-off for M01120864-S4.
The latest status recorded for M01120864-S4 is “LOC Issued.”
DOB recorded a sign-off for M01120864-S3.
The latest status recorded for M01120864-S3 is “LOC Issued.”
The latest status recorded for M01120864-S5 is “Permit Entire.”
Removal and modification of mechanical system in a retail space. Filing M01324908-P3.
Removal of plumbing fixtures from a retail space. Filing M01324908-P2.
Sprinkler modification in conjunction with renovation of an existing retail space. Filing M01324908-P4.
Installation of industrial rope access for facade and local law inspection. Filing M01474816-I1.
DOB recorded a sign-off for M01386691-S1.
The latest status recorded for M01386691-S1 is “LOC Issued.”
DOB recorded a sign-off for M01292279-S4.
The latest status recorded for M01292279-S4 is “LOC Issued.”
DOB recorded a sign-off for M01292279-S3.
The latest status recorded for M01292279-S3 is “LOC Issued.”
DOB recorded a sign-off for M01292279-S2.
The latest status recorded for M01292279-S2 is “LOC Issued.”
DOB recorded a sign-off for M01318500-I1.
The latest status recorded for M01318500-I1 is “LOC Issued.”
The latest status recorded for M01121344-S1 is “Permit Entire.”
DOB recorded a sign-off for M01292279-I1.
The latest status recorded for M01292279-I1 is “LOC Issued.”
Filing M01324908-P4 reached an approved status.
The latest status recorded for M01324908-P4 is “Approved.”
DOB recorded a sign-off for M01292279-S5.
The latest status recorded for M01292279-S5 is “LOC Issued.”
The latest status recorded for M01324908-S3 is “Permit Entire.”
DOB recorded a sign-off for M01121344-S2.
The latest status recorded for M01121344-S2 is “LOC Issued.”
The latest status recorded for M01324908-P2 is “Chief Plan Examiner/ Assistant Chief Plan Examiner Review.”
DOB recorded a sign-off for M01121344-I1.
The latest status recorded for M01121344-I1 is “LOC Issued.”
Filing M01474816-I1 reached an approved status.
The latest status recorded for M01474816-I1 is “Approved.”
The latest status recorded for M01324908-P3 is “Chief Plan Examiner/ Assistant Chief Plan Examiner Review.”
Renovations to existing retail space. General construction, inclusive of demolition, carpentry/drywall. Filing M01324908-P1.
The latest status recorded for M01324908-P1 is “Pending Plan Examiner Assignment.”