Building record · BIN 1000876

88 Pine Street

88 Pine Street, Manhattan, NY 10005

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 11 independently sourced records, including 2 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 1000876

88 Pine Street

Financial District-Battery Park City, Manhattan

A consolidated public-record view · updated Nov 20, 2026

DOB filings
11
Active-status
2
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings11
Open or active-status records2
First included filingOct 2, 2023
Latest recorded changeNov 20, 2026

The lot

What is already here?

The lot holds a 32-story office building built in 1973, on a 27,600 sq ft lot.

  1. Floors 2–32Nothing on record
  2. Floor 1Street levelStreet level. The lot is recorded as commercial and office, so this floor is where the commercial space is.
  • Street levelCommercial and office
  • Above the southern skylineFrom about floor 61 — the tallest thing within 60 m to the south is 181.8 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 127.9 m over 32 floors, as the city counts them. 1 run of floors has something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1973
Last altered
2007
Floors
32
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C6-9
Lot area
27,600 sq ft
Building area
664,990 sq ft

Owner of record

100 WALL REALTY LLC

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 22, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 183 notices on file; the most recent was issued Feb 22, 2023.

  • No report and / or late filing (facade)

    Issued Feb 22, 2023 — FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023

  • Plumbing

    Issued Jan 13, 2022 — FAILURE TO PROVIDE APPROVED / ACCEPTED PLANS AT JOB SITE AT TIME OF INSPECTION I OBSERVED AT TIME OF SPOT CHECK INSPECTION FOR WASTE, WATER VENT AND SEWER ROUGHING FOR 31 FLOOR NO PLANS ON SITE JOB NUMBER M00614807I1PL

  • Elevator

    Issued Feb 19, 2009

  • 1 further open notice is on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 22, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1000876. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 11 alteration filing. Its latest status categories are 9 recorded as completed, 2 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Oct 2, 2023
Latest recorded change
Nov 20, 2026
Highest proposed story count
32 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 88 Pine Street.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 11 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Modify existing entry including removal of revolving doors and construction of new entry vestibules and a new canopy above the entry. Construct new flood wall barrier; Renovate lobby including removal and replacement of lobby security turnstiles as plans. Filing M00935528-I1.

    01
  2. Alteration approved

    Filing M00935528-I1 reached an approved status.

    02
  3. Alteration filed

    Ductwork modifications on partial 17th floor in the existing office building to accommodate tenant fit out; No change to zoning, use, egress, occupancy. Filing M01277273-S1.

    03
  4. Alteration approved

    Filing M01277273-S1 reached an approved status.

    04
  5. Permit recorded for alteration

    DOB lists a first permit date for M01277273-S1. That is not by itself confirmation of activity on site.

    05
  6. Permit recorded for alteration

    DOB lists a first permit date for M00935528-I1. That is not by itself confirmation of activity on site.

    06
  7. Alteration filed

    Alteration to partial 28th floor in the existing office building including Installation of walls, doors, floor finishes and ceilings per plans filed herewith only. Filing M01314868-I1.

    07
  8. Alteration filed

    Plumbing piping and new fixtures, and modifications to sprinkler piping and installation of sprinkler heads on partial 28th floor in the existing office building. Filing M01314868-S2.

    08
  9. Alteration approved

    Filing M01314868-S2 reached an approved status.

    09
  10. Alteration filed

    HVAC modifications on partial 28th floor as required to acccommodate partitions revisions for new tenant. Filing M01314868-S1.

    010
  11. Alteration approved

    Filing M01314868-S1 reached an approved status.

    011
  12. Permit recorded for alteration

    DOB lists a first permit date for M01314868-S1. That is not by itself confirmation of activity on site.

    012
  13. Alteration approved

    Filing M01314868-I1 reached an approved status.

    013
  14. Permit recorded for alteration

    DOB lists a first permit date for M01314868-I1. That is not by itself confirmation of activity on site.

    014
  15. Permit recorded for alteration

    DOB lists a first permit date for M01314868-S2. That is not by itself confirmation of activity on site.

    015
  16. Alteration filed

    Modification of HVAC duct work on 14th floor to accommodate renovations in the existing office building as per plans. Filing M01345329-S1.

    016
  17. Alteration approved

    Filing M01345329-S1 reached an approved status.

    017
  18. Alteration filed

    Modification of existing sprinkler system no change in use, egress or occupancy. Renovation of existing of partial commercial floor with new plumbing fixtures as per drawings herein. Filing M01361990-S2.

    018
  19. Alteration approved

    Filing M01361990-S2 reached an approved status.

    019
  20. Permit recorded for alteration

    DOB lists a first permit date for M01345329-S1. That is not by itself confirmation of activity on site.

    020
  21. Alteration filed

    Tbd. Filing M01362040-S1.

    021
  22. Alteration approved

    Filing M01362040-S1 reached an approved status.

    022
  23. Alteration filed

    Removal and installation of plumbing fixtures and related piping as per drawings herein. Renovation of existing of partial commercial floor sprinkler layout to reflect the new architectural program and RCP. Filing M01362040-S2.

    023
  24. Alteration approved

    Filing M01362040-S2 reached an approved status.

    024
  25. Permit recorded for alteration

    DOB lists a first permit date for M01362040-S1. That is not by itself confirmation of activity on site.

    025
  26. Permit recorded for alteration

    DOB lists a first permit date for M01361990-S2. That is not by itself confirmation of activity on site.

    026
  27. Alteration filed

    Install new partitions and finishes on partial 4th floor to accommodate office alterations as per plans filed herewith only. Filing M01400992-I1.

    027
  28. Alteration approved

    Filing M01400992-I1 reached an approved status.

    028
  29. Alteration filed

    Modify ductwork on partial 4th floor to accommodate office renovations as per plans filed herewith only. Filing M01401004-S1.

    029
  30. Alteration approved

    Filing M01401004-S1 reached an approved status.

    030
  31. Permit recorded for alteration

    DOB lists a first permit date for M01362040-S2. That is not by itself confirmation of activity on site.

    031
  32. Permit recorded for alteration

    DOB lists a first permit date for M01401004-S1. That is not by itself confirmation of activity on site.

    032
  33. Permit recorded for alteration

    DOB lists a first permit date for M01400992-I1. That is not by itself confirmation of activity on site.

    033
  34. Alteration signed off

    DOB recorded a sign-off for M01361990-S2.

    034
  35. Alteration now completed

    The latest status recorded for M01361990-S2 is “LOC Issued.”

    035
  36. Alteration signed off

    DOB recorded a sign-off for M01400992-I1.

    036
  37. Alteration now completed

    The latest status recorded for M01400992-I1 is “LOC Issued.”

    037
  38. Alteration signed off

    DOB recorded a sign-off for M01277273-S1.

    038
  39. Alteration now completed

    The latest status recorded for M01277273-S1 is “LOC Issued.”

    039
  40. Alteration now approved

    The latest status recorded for M01362040-S2 is “Permit Entire.”

    040
  41. Alteration signed off

    DOB recorded a sign-off for M01314868-S1.

    041
  42. Alteration now completed

    The latest status recorded for M01314868-S1 is “LOC Issued.”

    042
  43. Alteration now approved

    The latest status recorded for M00935528-I1 is “Permit Entire.”

    043
  44. Alteration signed off

    DOB recorded a sign-off for M01401004-S1.

    044
  45. Alteration now completed

    The latest status recorded for M01401004-S1 is “LOC Issued.”

    045
  46. Alteration signed off

    DOB recorded a sign-off for M01345329-S1.

    046
  47. Alteration now completed

    The latest status recorded for M01345329-S1 is “LOC Issued.”

    047
  48. Alteration signed off

    DOB recorded a sign-off for M01314868-S2.

    048
  49. Alteration now completed

    The latest status recorded for M01314868-S2 is “LOC Issued.”

    049
  50. Alteration signed off

    DOB recorded a sign-off for M01362040-S1.

    050
  51. Alteration now completed

    The latest status recorded for M01362040-S1 is “LOC Issued.”

    051
  52. Alteration signed off

    DOB recorded a sign-off for M01314868-I1.

    052
  53. Alteration now completed

    The latest status recorded for M01314868-I1 is “LOC Issued.”

    053