Building record · BIN 1001026

120 Broadway

120 Broadway, Manhattan, NY 10271

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 4 independently sourced records, including 1 that are not recorded as completed, closed or withdrawn.

Open full map
120 Broadway building dossier graphic showing matched DOB filings and current record counts
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings4
Open or active-status records1
First included filingMay 27, 2026
Latest recorded changeSep 2, 2026

The lot

What is already here?

The lot holds a 41-story condominium built in 1915, on a 49,614 sq ft lot.

Built
1915
Floors
41
Residential units
0
Building type
Condominium
Land use
Commercial and office
Zoning district
C5-5
Lot area
49,614 sq ft
Building area
1,491,817 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 5, 2026. They describe the tax lot, not any single filing.

Violation record

Are there open violations here?

The Department of Buildings has 9 open notices on record for this building, out of 554 notices on file; the most recent was issued Feb 24, 2021.

  • Elevator

    Issued Feb 24, 2021

  • High pressure boiler

    Issued Jan 30, 2015

  • Elevator

    Issued Jul 16, 2014

  • 6 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 4, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1001026. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 4 alteration filing. Its latest status categories are 3 recorded as completed, 1 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
May 27, 2026
Latest recorded change
Sep 2, 2026
Highest proposed story count
41 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 120 Broadway.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 4 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Plumbing work on the 33rd floor (Alliance for Downtown) as indicated on drawings. Filing M01392391-I1.

    01
  2. Alteration filed

    Mechanical work on the 33rdf floor (Alliance for Downtown) as indicated on drawings. Filing M01392374-I1.

    02
  3. Alteration filed

    Construction work on the 33rd floor (Alliance for Downtown) as indicated on drawings. Filing M01392366-I1.

    03
  4. Alteration approved

    Filing M01392391-I1 reached an approved status.

    04
  5. Alteration approved

    Filing M01392374-I1 reached an approved status.

    05
  6. Alteration approved

    Filing M01392366-I1 reached an approved status.

    06
  7. Permit recorded for alteration

    DOB lists a first permit date for M01392374-I1. That is not by itself confirmation of activity on site.

    07
  8. Permit recorded for alteration

    DOB lists a first permit date for M01392366-I1. That is not by itself confirmation of activity on site.

    08
  9. Permit recorded for alteration

    DOB lists a first permit date for M01392391-I1. That is not by itself confirmation of activity on site.

    09
  10. Alteration filed

    Sprinkler work on the 4th floor to add 205 sprinkler heads. Filing M01448433-I1.

    010
  11. Alteration approved

    Filing M01448433-I1 reached an approved status.

    011
  12. Permit recorded for alteration

    DOB lists a first permit date for M01448433-I1. That is not by itself confirmation of activity on site.

    012
  13. Alteration now approved

    The latest status recorded for M01448433-I1 is “Permit Entire.”

    013
  14. Alteration signed off

    DOB recorded a sign-off for M01392366-I1.

    014
  15. Alteration now completed

    The latest status recorded for M01392366-I1 is “LOC Issued.”

    015
  16. Alteration signed off

    DOB recorded a sign-off for M01392391-I1.

    016
  17. Alteration now completed

    The latest status recorded for M01392391-I1 is “LOC Issued.”

    017
  18. Alteration signed off

    DOB recorded a sign-off for M01392374-I1.

    018
  19. Alteration now completed

    The latest status recorded for M01392374-I1 is “LOC Issued.”

    019