DOB filing M01245592-I1
Alteration filing at 140 Broadway
Building record · BIN 1001027
140 Broadway, Manhattan, NY 10005
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 13 independently sourced records, including 5 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1001027
140 Broadway
Financial District-Battery Park City, Manhattan
A consolidated public-record view · updated Sep 28, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 50-story office building built in 1968, on a 52,636 sq ft lot.
Owner of record
140 BW LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 1, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 2 open notices on record for this building, out of 226 notices on file; the most recent was issued Jan 26, 2015.
Issued Jan 26, 2015
Issued Jan 31, 2013
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 15, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1001027. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 13 alteration filing. Its latest status categories are 5 approved, 8 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 140 Broadway.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 13 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Proposed modifications to the building lobby. Filing M01133608-I1.
1st floor lobby renovation with modified air outlets and provide transfer air ventilation to the fire command center. Filing M01133608-S1.
Filing M01133608-I1 reached an approved status.
Filing M01133608-S1 reached an approved status.
Build out of server and storage room as well as temporary corridor to stairwell and freight elevator. Filing M01186281-I1.
Filing M01186281-I1 reached an approved status.
DOB lists a first permit date for M01186281-I1. That is not by itself confirmation of activity on site.
Relocate and replace existing sprinkler heads for lobby renovation. Filing M01133608-S2.
DOB lists a first permit date for M01133608-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01133608-S1. That is not by itself confirmation of activity on site.
Filing M01133608-S2 reached an approved status.
DOB lists a first permit date for M01133608-S2. That is not by itself confirmation of activity on site.
Interior office fit out of 15th through 18th floors including open office, private offices, restroomrenovation, new unisex powder rooms, wellness rooms, conference rooms, non cooking break rooms, sound lab, conference rooms, waiting / reception areas. Filing M01245592-I1.
Modification to existing ductwork and installation of AC units as per plans filed herewith. 15,16,17,18 Construction vs 17,18,19 & 20 Marketing. Filing M01214491-I1.
Engineering new floor openings for new interfloor staircases, engineer interfloor staircases and engineer structural support for modernfold type Folding partition. Filing M01210141-I1.
Filing M01210141-I1 reached an approved status.
Filing M01245592-I1 reached an approved status.
Filing M01214491-I1 reached an approved status.
Structural framing for new stair between floors 28-30 (30 - 32 marketing designation). Filing M01252436-S2.
Filing M01252436-S2 reached an approved status.
Interior renovation including partitions, finishes internal structural stair spanning (3) floors). Filing M01252436-I1.
Modifications to plumbing, sprinkler & standpipe on floors 28-30 (construction designation) / 30-32 (marketing designation). Filing M01252436-S3.
Modifications to building HVAC system on floors 27-29 (Construction designation) / 30-32 (Marketing designation). Filing M01252436-S1.
Filing M01252436-I1 reached an approved status.
Filing M01252436-S3 reached an approved status.
Filing M01252436-S1 reached an approved status.
DOB lists a first permit date for M01252436-S2. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01252436-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01252436-S1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01252436-S3. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01245592-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01210141-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01214491-I1. That is not by itself confirmation of activity on site.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. live load 300psf. Filing M01408430-I1.
DOB lists a first permit date for M01408430-I1. That is not by itself confirmation of activity on site.
Minor construction work on the sub-cellar1 level (Crunch Fidi) as indicated on drawings. Filing M01435973-I1.
Filing M01435973-I1 reached an approved status.
DOB lists a first permit date for M01435973-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01435973-I1 is “Permit Entire.”
DOB recorded a sign-off for M01186281-I1.
The latest status recorded for M01186281-I1 is “LOC Issued.”
The latest status recorded for M01408430-I1 is “Permit Entire.”
DOB recorded a sign-off for M01252436-I1.
The latest status recorded for M01252436-I1 is “LOC Issued.”
DOB recorded a sign-off for M01252436-S3.
The latest status recorded for M01252436-S3 is “LOC Issued.”
DOB recorded a sign-off for M01252436-S1.
The latest status recorded for M01252436-S1 is “LOC Issued.”
DOB recorded a sign-off for M01252436-S2.
The latest status recorded for M01252436-S2 is “LOC Issued.”
DOB recorded a sign-off for M01133608-S2.
The latest status recorded for M01133608-S2 is “LOC Issued.”
DOB recorded a sign-off for M01133608-I1.
The latest status recorded for M01133608-I1 is “LOC Issued.”
DOB recorded a sign-off for M01133608-S1.
The latest status recorded for M01133608-S1 is “LOC Issued.”
The latest status recorded for M01245592-I1 is “Permit Entire.”
The latest status recorded for M01214491-I1 is “Permit Entire.”
The latest status recorded for M01210141-I1 is “Permit Entire.”