Building record · BIN 1001030

115 Broadway

115 Broadway, Manhattan, NY 10006

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 8 independently sourced records, including 6 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 1001030

115 Broadway

Financial District-Battery Park City, Manhattan

A consolidated public-record view · updated Oct 1, 2026

DOB filings
8
Active-status
6
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings8
Open or active-status records6
First included filingNov 25, 2025
Latest recorded changeOct 1, 2026

The lot

What is already here?

The lot holds a 21-story office building built in 1907, on a 16,620 sq ft lot.

  1. Floors 2–21Nothing on record
  2. Floor 1Street levelStreet level. The lot is recorded as commercial and office, so this floor is where the commercial space is.
  • Street levelCommercial and office
  • Above the southern skylineFrom about floor 56 — the tallest thing within 60 m to the south is 165.8 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 91.3 m over 21 floors, as the city counts them. 1 run of floors has something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1907
Last altered
1989
Floors
21
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C5-5
Lot area
16,620 sq ft
Building area
396,607 sq ft

Owner of record

TRINITY CENTRE, LLC

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 3, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 19 open notices on record for this building, out of 205 notices on file; the most recent was issued Nov 14, 2025.

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION

  • Failure to post energy

    Issued Dec 1, 2023 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

  • 16 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 3, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1001030. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 8 alteration filing. Its latest status categories are 6 approved, 2 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Nov 25, 2025
Latest recorded change
Oct 1, 2026
Highest proposed story count
21 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 115 Broadway.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 8 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Sprinkler modifications taking place on the 15th floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M01301204-I1.

    01
  2. Alteration filed

    Mechanical modifications taking place on 15th floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M01301197-I1.

    02
  3. Alteration approved

    Filing M01301204-I1 reached an approved status.

    03
  4. Alteration approved

    Filing M01301197-I1 reached an approved status.

    04
  5. Permit recorded for alteration

    DOB lists a first permit date for M01301197-I1. That is not by itself confirmation of activity on site.

    05
  6. Permit recorded for alteration

    DOB lists a first permit date for M01301204-I1. That is not by itself confirmation of activity on site.

    06
  7. Alteration filed

    Plumbing modifications taking place on 17th floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M01420869-I1.

    07
  8. Alteration approved

    Filing M01420869-I1 reached an approved status.

    08
  9. Alteration filed

    IRA to assist with Condition Assessment. Filing M01448645-I1.

    09
  10. Alteration signed off

    DOB recorded a sign-off for M01301197-I1.

    010
  11. Alteration now completed

    The latest status recorded for M01301197-I1 is “LOC Issued.”

    011
  12. Permit recorded for alteration

    DOB lists a first permit date for M01420869-I1. That is not by itself confirmation of activity on site.

    012
  13. Alteration now approved

    The latest status recorded for M01420869-I1 is “Permit Entire.”

    013
  14. Alteration approved

    Filing M01448645-I1 reached an approved status.

    014
  15. Alteration now approved

    The latest status recorded for M01448645-I1 is “Approved.”

    015
  16. Alteration signed off

    DOB recorded a sign-off for M01301204-I1.

    016
  17. Alteration now completed

    The latest status recorded for M01301204-I1 is “LOC Issued.”

    017
  18. Alteration filed

    General construction taking place on 9th floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M01447469-I1.

    018
  19. Alteration filed

    Mechanical modifications taking place on 9th floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M01447477-I1.

    019
  20. Alteration filed

    Plumbing modifications taking place on 9th floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M01447534-I1.

    020
  21. Alteration approved

    Filing M01447534-I1 reached an approved status.

    021
  22. Alteration filed

    Sprinkler modifications taking place on the 9th floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M01447540-I1.

    022
  23. Alteration approved

    Filing M01447540-I1 reached an approved status.

    023
  24. Alteration approved

    Filing M01447469-I1 reached an approved status.

    024
  25. Permit recorded for alteration

    DOB lists a first permit date for M01447469-I1. That is not by itself confirmation of activity on site.

    025
  26. Alteration now approved

    The latest status recorded for M01447469-I1 is “Permit Entire.”

    026
  27. Alteration approved

    Filing M01447477-I1 reached an approved status.

    027
  28. Permit recorded for alteration

    DOB lists a first permit date for M01447534-I1. That is not by itself confirmation of activity on site.

    028
  29. Alteration now approved

    The latest status recorded for M01447534-I1 is “Permit Entire.”

    029
  30. Permit recorded for alteration

    DOB lists a first permit date for M01447540-I1. That is not by itself confirmation of activity on site.

    030
  31. Alteration now approved

    The latest status recorded for M01447540-I1 is “Permit Entire.”

    031
  32. Permit recorded for alteration

    DOB lists a first permit date for M01447477-I1. That is not by itself confirmation of activity on site.

    032
  33. Alteration now approved

    The latest status recorded for M01447477-I1 is “Permit Entire.”

    033