DOB filing M01447477-I1
Alteration filing at 115 Broadway
Building record · BIN 1001030
115 Broadway, Manhattan, NY 10006
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 8 independently sourced records, including 6 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1001030
115 Broadway
Financial District-Battery Park City, Manhattan
A consolidated public-record view · updated Oct 1, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 21-story office building built in 1907, on a 16,620 sq ft lot.
Owner of record
TRINITY CENTRE, LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 3, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 19 open notices on record for this building, out of 205 notices on file; the most recent was issued Nov 14, 2025.
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
Issued Dec 1, 2023 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
16 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 3, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1001030. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 8 alteration filing. Its latest status categories are 6 approved, 2 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 115 Broadway.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 8 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Sprinkler modifications taking place on the 15th floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M01301204-I1.
Mechanical modifications taking place on 15th floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M01301197-I1.
Filing M01301204-I1 reached an approved status.
Filing M01301197-I1 reached an approved status.
DOB lists a first permit date for M01301197-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01301204-I1. That is not by itself confirmation of activity on site.
Plumbing modifications taking place on 17th floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M01420869-I1.
Filing M01420869-I1 reached an approved status.
IRA to assist with Condition Assessment. Filing M01448645-I1.
DOB recorded a sign-off for M01301197-I1.
The latest status recorded for M01301197-I1 is “LOC Issued.”
DOB lists a first permit date for M01420869-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01420869-I1 is “Permit Entire.”
Filing M01448645-I1 reached an approved status.
The latest status recorded for M01448645-I1 is “Approved.”
DOB recorded a sign-off for M01301204-I1.
The latest status recorded for M01301204-I1 is “LOC Issued.”
General construction taking place on 9th floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M01447469-I1.
Mechanical modifications taking place on 9th floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M01447477-I1.
Plumbing modifications taking place on 9th floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M01447534-I1.
Filing M01447534-I1 reached an approved status.
Sprinkler modifications taking place on the 9th floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M01447540-I1.
Filing M01447540-I1 reached an approved status.
Filing M01447469-I1 reached an approved status.
DOB lists a first permit date for M01447469-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01447469-I1 is “Permit Entire.”
Filing M01447477-I1 reached an approved status.
DOB lists a first permit date for M01447534-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01447534-I1 is “Permit Entire.”
DOB lists a first permit date for M01447540-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01447540-I1 is “Permit Entire.”
DOB lists a first permit date for M01447477-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01447477-I1 is “Permit Entire.”