DOB filing M01332100-P1
Alteration filing at 1 Liberty Plaza
Building record · BIN 1001068
1 Liberty Plaza, Manhattan, NY 10006
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 34 independently sourced records, including 33 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1001068
1 Liberty Plaza
Financial District-Battery Park City, Manhattan
A consolidated public-record view · updated Nov 9, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 54-story condominium built in 1973, on a 95,348 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 11, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 8 open notices on record for this building, out of 248 notices on file; the most recent was issued May 1, 2014.
Issued May 1, 2014
Issued May 1, 2014
Issued Aug 5, 2009
5 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 11, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1001068. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 34 alteration filing. Its latest status categories are 4 under review, 29 approved, 1 closed or withdrawn. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 1 Liberty Plaza.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 34 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
General construction filed for removal and replacement of existing window glazing and sash within existing window openings on floors 44-53, as shown on plans herewith. No change in use, egress or occupancy. Filing M01332100-I1.
Filing M01332100-I1 reached an approved status.
Sprinkler work as shown on plans filed herewith. No change to use egress or occupancy. Filing M01381045-S1.
Filing M01381045-S1 reached an approved status.
Sprinkler work as shown on plans filed herewith. No change to use, egress or occupancy. Filing M01390451-S3.
Filing M01390451-S3 reached an approved status.
DOB lists a first permit date for M01390451-S3. That is not by itself confirmation of activity on site.
Sprinkler work as shown on plans filed herewith. Filing M01397263-S3.
Filing M01397263-S3 reached an approved status.
General construction as shown on plans filed herewith. No change in use, egress, or occupancy. Filing M01433921-I1.
General construction as shown on plans filed herewith. No change in use, egress, or occupancy. Filing M01433907-I1.
Filing M01433921-I1 reached an approved status.
Filing M01433907-I1 reached an approved status.
Structural work as shown on plans filed herewith. Filing M01433907-S5.
Structural work as shown on plans filed herewith. Filing M01433921-S4.
DOB lists a first permit date for M01433921-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01433907-I1. That is not by itself confirmation of activity on site.
Filing M01433907-S5 reached an approved status.
Filing M01433921-S4 reached an approved status.
DOB lists a first permit date for M01397263-S3. That is not by itself confirmation of activity on site.
The latest status recorded for M01397263-S3 is “Permit Entire.”
Plumbing work as shown on plans filed herewith. Filing M01433921-S2.
Plumbing work as shown on plans filed herewith. Filing M01433907-S2.
Filing M01433907-S2 reached an approved status.
Sprinkler work as shown on plans filed herewith. Filing M01433907-S3.
Filing M01433907-S3 reached an approved status.
Standpipe work as shown on plans filed herewith. Filing M01433907-S4.
Filing M01433907-S4 reached an approved status.
Sprinkler work as shown on plans filed herewith. Filing M01433921-S3.
Filing M01433921-S3 reached an approved status.
Mechanical work as shown on plans filed herewith. Filing M01433907-S1.
Filing M01433907-S1 reached an approved status.
Mechanical work as shown on plans filed herewith. Filing M01433921-S1.
Filing M01433921-S2 reached an approved status.
Filing M01433921-S1 reached an approved status.
The latest status recorded for M01433921-S1 is “Approved.”
Heavy duty sidewalk shed during exterior repairs filed under application # m01332100. sidewalk shed shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M01450576-S1.
DOB lists a first permit date for M01433907-S1. That is not by itself confirmation of activity on site.
The latest status recorded for M01433907-S1 is “Permit Entire.”
Construction fence as per drawings. construction fence shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M01450576-I1.
DOB lists a first permit date for M01450576-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01450576-I1 is “Permit Entire.”
DOB lists a first permit date for M01450576-S1. That is not by itself confirmation of activity on site.
The latest status recorded for M01450576-S1 is “Permit Entire.”
General Construction as shown on plans filed herewith. no change to use, egress or occupancy. Filing M01453482-I1.
Plumbing work as shown on plans filed herewith. Ni change to use, egress or occupancy. Filing M01453482-S2.
Mechanical work as shown on plans filed herewith. No change to use, egress or occupancy. Filing M01453482-S1.
Sprinkler work as shown on plans filed herewith. No change to use, egress or occupancy. Filing M01453482-S3.
Filing M01453482-I1 reached an approved status.
Filing M01453482-S2 reached an approved status.
Filing M01453482-S3 reached an approved status.
The latest status recorded for M01453482-I1 is “Approved.”
Filing M01453482-S1 reached an approved status.
DOB lists a first permit date for M01453482-S3. That is not by itself confirmation of activity on site.
The latest status recorded for M01453482-S3 is “Permit Entire.”
The latest status recorded for M01453482-S1 is “Approved.”
DOB lists a first permit date for M01433921-S4. That is not by itself confirmation of activity on site.
The latest status recorded for M01433921-S4 is “Permit Entire.”
DOB lists a first permit date for M01433907-S5. That is not by itself confirmation of activity on site.
The latest status recorded for M01433907-S5 is “Permit Entire.”
DOB lists a first permit date for M01433907-S3. That is not by itself confirmation of activity on site.
The latest status recorded for M01433907-S3 is “Permit Entire.”
DOB lists a first permit date for M01433907-S4. That is not by itself confirmation of activity on site.
The latest status recorded for M01433907-S4 is “Permit Entire.”
DOB lists a first permit date for M01433921-S3. That is not by itself confirmation of activity on site.
The latest status recorded for M01433921-S3 is “Permit Entire.”
DOB lists a first permit date for M01332100-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01332100-I1 is “Permit Entire.”
Plumbing work as shown on plans filed herewith. Filing M01381045-S3.
Mechanical work as shown on plans filed herewith. Filing M01381045-S2.
Filing M01381045-S3 reached an approved status.
The latest status recorded for M01381045-S3 is “Approved.”
The latest status recorded for M01381045-S2 is “QA Failed.”
DOB lists a first permit date for M01453482-S2. That is not by itself confirmation of activity on site.
The latest status recorded for M01453482-S2 is “Permit Entire.”
The latest status recorded for M01390451-S3 is “Permit Entire.”
The latest status recorded for M01433921-I1 is “Permit Entire.”
The latest status recorded for M01433907-I1 is “Permit Entire.”
Use of Knuckleboom for installing sidewalk structures. Filing M01442969-I1.
DOB lists a first permit date for M01433921-S2. That is not by itself confirmation of activity on site.
The latest status recorded for M01433921-S2 is “Permit Entire.”
DOB lists a first permit date for M01433907-S2. That is not by itself confirmation of activity on site.
The latest status recorded for M01433907-S2 is “Permit Entire.”
DOB lists a first permit date for M01442969-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01442969-I1 is “Permit Entire.”
Interior demo of partitions, ceilings and doors for existing office space. No change in use, egress or occupancy. Filing M01460472-I1.
Filing M01460472-I1 reached an approved status.
Demo of existing SP heads and installation of temp sprinkler loop. No change in use, egress or occupancy. Filing M01460472-S3.
Interior demo of existing plumbing fixtures & piping for existing office space. No change in use, egress or occupancy. Filing M01460472-S2.
Interior demo of existing HVAC units and related piping for existing office space. No change in use, egress or occupancy. Filing M01460472-S1.
The latest status recorded for M01460472-S2 is “Prof Cert QA Review.”
The latest status recorded for M01460472-S1 is “Prof Cert QA Review.”
Filing herewith structural plans showing new stair and assciated reinforcement. new slab opening at 30th floor and associated reinforcement. there will be no change of use, occupancy or egress under this application. Filing M01457121-S3.
Filing herewith for non-structural interior demolition and interior renovation as shown on plans. no change to use, egress, or occupancy under this application. Filing M01457121-I1.
Filing M01460472-S3 reached an approved status.
Filing herewith for the addition/modification to an existing sprinkler system as shown on plans. there will be no change of use, occupancy or egress under this application. Filing M01457180-I1.
Application filed herewith to include plumbing work as shown on plans. there will be no change os use, occupancy or egress under this application. Filing M01457121-S2.
Filing M01457121-S3 reached an approved status.
Filing M01457121-I1 reached an approved status.
DOB lists a first permit date for M01460472-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01460472-I1 is “Permit Entire.”
The latest status recorded for M01381045-S1 is “Approved.”
Application filed herewith for mechanical ductwork as shown on plans. there will be no change of use occupancy or egress under this application. Filing M01457121-S1.
DOB lists a first permit date for M01457121-S1. That is not by itself confirmation of activity on site.
The latest status recorded for M01457121-S1 is “Permit Entire.”
The latest status recorded for M01457121-S2 is “Prof Cert QA Review.”
DOB lists a first permit date for M01460472-S3. That is not by itself confirmation of activity on site.
The latest status recorded for M01460472-S3 is “Permit Entire.”
Filing M01457180-I1 reached an approved status.
The latest status recorded for M01457180-I1 is “Approved.”
Mechanical work as shown on plans filed herewith. Filing M01332100-P1.
DOB lists a first permit date for M01457121-S3. That is not by itself confirmation of activity on site.
The latest status recorded for M01457121-S3 is “Permit Entire.”
DOB lists a first permit date for M01457121-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01457121-I1 is “Permit Entire.”
The latest status recorded for M01332100-P1 is “Prof Cert QA Review.”