DOB filing M01411338-I1
Alteration filing at 199 Water Street
Building record · BIN 1001162
199 Water Street, Manhattan, NY 10038
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 22 independently sourced records, including 17 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1001162
199 Water Street
Financial District-Battery Park City, Manhattan
A consolidated public-record view · updated Oct 21, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 35-story condominium built in 1993, on a 41,656 sq ft lot.
Owner of record
NYC PARKS
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 23, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 3 open notices on record for this building, out of 154 notices on file; the most recent was issued Feb 11, 2010.
Issued Feb 11, 2010
Issued Aug 5, 2003
Issued Dec 21, 1990
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 23, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1001162. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 22 alteration filing. Its latest status categories are 15 approved, 5 recorded as completed, 2 under review. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 199 Water Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 22 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Modifications to the existing Sprinkler System on the 13th Floor(14th Floor Leasing) as per plans submitted herewith. No Change to Use, Occupancy Group, or egress. Filing M00237365-I1.
Filing M00237365-I1 reached an approved status.
DOB lists a first permit date for M00237365-I1. That is not by itself confirmation of activity on site.
Interior tenant fit-out of the 34th Construction/35th Marketing floor to align architectural changes. Water line added to serve new coffee maker. Filing M01255905-S2.
Interior tenant fit-out of the 34th Construction/35th Marketing floor to align architectural changes. Removal of existing Sprinkler heads and addition of new sprinkler heads to provide code-compliant coverage to new layout. Filing M01255905-S3.
Filing M01255905-S2 reached an approved status.
Filing M01255905-S3 reached an approved status.
DOB lists a first permit date for M01255905-S2. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01255905-S3. That is not by itself confirmation of activity on site.
Sprinkler work for ARCH on marketing floors 30 & 31 (construction floors 29 & 30). Filing M01351193-I1.
Filing M01351193-I1 reached an approved status.
DOB lists a first permit date for M01351193-I1. That is not by itself confirmation of activity on site.
Plumbing work for office renovation for Cohen Milstein Toll on 21st marketing level (20th construction). Filing M01371926-I1.
Mechanical work for office renovation for Cohen Milstein Toll on 21st marketing level (20th construction). Filing M01371919-I1.
Filing M01371926-I1 reached an approved status.
Filing M01371919-I1 reached an approved status.
DOB lists a first permit date for M01371919-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01371926-I1. That is not by itself confirmation of activity on site.
Mechanical work for ADM Law on 9th floor. Filing M01411338-I1.
Filing M01411338-I1 reached an approved status.
DOB lists a first permit date for M01411338-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for M01255905-S3.
The latest status recorded for M01255905-S3 is “LOC Issued.”
DOB recorded a sign-off for M00237365-I1.
The latest status recorded for M00237365-I1 is “LOC Issued.”
Sprinkler work for ARCH on marketing floors 30 & 31 (construction floors 29 & 30). Filing M01351193-P1.
Filing M01351193-P1 reached an approved status.
The latest status recorded for M01351193-P1 is “Approved.”
The latest status recorded for M01351193-I1 is “Permit Entire.”
Sprinkler work for amenity space on 4th floor. Filing M01451067-I1.
Plumbing work for amenity space on 4th floor. Filing M01451059-I1.
General construction for Amenity Space on 4th floor. Filing M01451032-I1.
Mechanical work for amenity space on 4th floor. Filing M01451046-I1.
Filing M01451046-I1 reached an approved status.
The latest status recorded for M01451046-I1 is “Approved.”
Installation of new commercial cooking equipment and new plumbing fixtures. Filing M01235405-P3.
Filing M01451032-I1 reached an approved status.
The latest status recorded for M01451032-I1 is “Approved.”
Filing M01451067-I1 reached an approved status.
The latest status recorded for M01451067-I1 is “Approved.”
Filing M01451059-I1 reached an approved status.
The latest status recorded for M01451059-I1 is “Approved.”
Structural work for Amenity Space on 4th floor. Filing M01451106-I1.
Filing M01451106-I1 reached an approved status.
The latest status recorded for M01451106-I1 is “Approved.”
Sprinkler work for AFL-CIO on 5th floor. Filing M01460952-I1.
Plumbing work for AFL-CIO on 5th floor. Filing M01460946-I1.
General construction for AFL-CIO on 5th floor. Filing M01460921-I1.
Mechanical work for AFL-CIO on 5th floor. Filing M01460933-I1.
DOB recorded a sign-off for M01255905-S2.
The latest status recorded for M01255905-S2 is “LOC Issued.”
Filing M01460921-I1 reached an approved status.
The latest status recorded for M01460921-I1 is “Approved.”
Filing M01460933-I1 reached an approved status.
The latest status recorded for M01460933-I1 is “Approved.”
Filing M01460952-I1 reached an approved status.
The latest status recorded for M01460952-I1 is “Approved.”
Filing M01460946-I1 reached an approved status.
The latest status recorded for M01460946-I1 is “Approved.”
Proposed interior partitions work on 10th floor as per plan. no change in egress, use or occupancy. Filing M01363861-P1.
The latest status recorded for M01363861-P1 is “Plan Examiner Review.”
Mechanical work including removal of existing AC units during interior demolition on 18th marketing floor (17th construction). Filing M01469862-I1.
Interior demolition on 18th marketing floor (17th construction floor). Filing M01469856-I1.
DOB recorded a sign-off for M01371919-I1.
The latest status recorded for M01371919-I1 is “LOC Issued.”
Sprinkler work including installation of temp loop during interior demolition on 18th marketing floor (17th construction floor). Filing M01469868-I1.
Filing M01469868-I1 reached an approved status.
The latest status recorded for M01469868-I1 is “Approved.”
Filing M01469856-I1 reached an approved status.
The latest status recorded for M01469856-I1 is “Approved.”
Filing M01469862-I1 reached an approved status.
The latest status recorded for M01469862-I1 is “Approved.”
The latest status recorded for M01235405-P3 is “Objections.”
DOB recorded a sign-off for M01371926-I1.
The latest status recorded for M01371926-I1 is “LOC Issued.”
The latest status recorded for M01411338-I1 is “Permit Entire.”