DOB filing M01353735-I1
Alteration filing at 433 East 9 Street
Building record · BIN 1005916
433 East 9 Street, Manhattan, NY 10009
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 4 independently sourced records, including 3 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1005916
433 East 9 Street
East Village, Manhattan
A consolidated public-record view · updated Sep 14, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 5-story walk-up apartment building built in 1910, with 10 homes, on a 2,306 sq ft lot.
The apartments
10 condominium apartments are assessed on this block, and the typical one is 1,180 sq ft (110 m²). They run from 106 to 169 m².
The city values the typical one at $806,682. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.
Owner of record
TENTH JAM DEVELOPMENT LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 17, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
No open violations are recorded for this building. 1 notice is on file, all with a recorded resolution.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 16, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1005916. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 4 alteration filing. Its latest status categories are 3 approved, 1 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 433 East 9 Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 4 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. Filing M01157194-I1.
DOB lists a first permit date for M01157194-I1. That is not by itself confirmation of activity on site.
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. Filing M01353735-I1.
DOB lists a first permit date for M01353735-I1. That is not by itself confirmation of activity on site.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. Filing M01415663-I1.
DOB lists a first permit date for M01415663-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01415663-I1 is “Permit Entire.”
DOB recorded a sign-off for M01157194-I1.
The latest status recorded for M01157194-I1 is “LOC Issued.”
The latest status recorded for M01353735-I1 is “Permit Entire.”
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. Filing M01353735-P2.
Filing M01353735-P2 reached an approved status.
The latest status recorded for M01353735-P2 is “Approved.”