DOB filing M00722206-I1
Alteration filing at 495 Broome Street
Building record · BIN 1007065
495 Broome Street, Manhattan, NY 10013
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 3 independently sourced records, including 3 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1007065
495 Broome Street
Soho-Little Italy-Hudson Square, Manhattan
A consolidated public-record view · updated Sep 8, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 7-story mainly residential with some commercial built in 1896, with 6 homes, on a 2,675 sq ft lot.
What it sold for
10 apartments on this tax block changed hands in the year the city last published, at a median of $5,046,823, from 23,930 to 6,950,000.
Recorded sale prices from the Department of Finance’s rolling file, covering the year to Aug 31, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 12, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 6 open notices on record for this building, out of 31 notices on file; the most recent was issued Jan 12, 2026.
Issued Jan 12, 2026 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. AT THE TIME OF INSPECTION, I OBSERVED CRACKING/SPALLING CONCRETE STUCCO AT MULTI LOCATIONS AT EXPOSURE 3 SOUTH ELEVATIONS. OBSERVED CRACKING/SPALLING MASONRY BRICKS AT EXPOSURE 4 WEST ELEVATIONS. REMEDY: REPAIR OR REPLACE
Issued Feb 18, 2022 — CYCLE 9A FAILURE TO CORRECT SWARMP CONDITIONS
Issued Feb 18, 2022 — CYCLE 9A UNSAFE REPORT FILED
3 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 10, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1007065. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 3 alteration filing. Its latest status categories are 3 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 495 Broome Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 3 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Installation of sidewalk shed as indication the attached drawings. There are no changes in use, egress or occupancy. Filing M00722206-I1.
DOB lists a first permit date for M00722206-I1. That is not by itself confirmation of activity on site.
New Amendment For facade work and inspections. Filing M00991718-I1.
Filing M00991718-I1 reached an approved status.
DOB lists a first permit date for M00991718-I1. That is not by itself confirmation of activity on site.
New Amendment For facade work and inspections. Filing M00991718-P3.
Filing M00991718-P3 reached an approved status.
The latest status recorded for M00991718-P3 is “Approved.”
The latest status recorded for M00991718-I1 is “Permit Entire.”
The latest status recorded for M00722206-I1 is “Permit Entire.”