DOB filing M01408051-P4
Alteration filing at 398 Broome Street
Building record · BIN 1007193
398 Broome Street, Manhattan, NY 10013
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 8 independently sourced records, including 8 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1007193
398 Broome Street
Soho-Little Italy-Hudson Square, Manhattan
A consolidated public-record view · updated Sep 14, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 11-story hotel built in 1913, with 117 homes, on a 16,438 sq ft lot.
The apartments
100 condominium apartments are assessed on this block, and the typical one is 1,735 sq ft (161 m²). They run from 87 to 469 m².
The city values the typical one at $615,969. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.
What it sold for
3 apartments on this tax block changed hands in the year the city last published, at a median of $2,735,000, from 2,600,000 to 3,650,000.
Recorded sale prices from the Department of Finance’s rolling file, covering the year to Aug 31, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.
Owner of record
NYC TRANSIT
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 17, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 5 open notices on record for this building, out of 84 notices on file; the most recent was issued Sep 23, 2024.
Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
Issued Jul 1, 1997
Issued Jan 13, 1997
2 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 16, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1007193. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 8 alteration filing. Its latest status categories are 8 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 398 Broome Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 8 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
This alteration is being filed for the replacement of the boiler equipment. There are no change in use, egress or occupancy under this application. Filing M01408051-I1.
Mechanical application filed in conjunction with boiler replacement application. No change in use, egress or occupancy. Filing M01418230-I1.
Plumbing application filed for the related plumbing portion (gas & water connections) of the boiler replacement work on the 11th Floor as filed under boiler application M0410805-I1 & S1. no change in use or egress. Filing M01418239-I1.
Filing M01408051-I1 reached an approved status.
This alteration is being filed for the replacement of the boiler equipment. There are no change in use, egress or occupancy under this application. Filing M01408051-S1.
Filing M01408051-S1 reached an approved status.
Filing M01418230-I1 reached an approved status.
Filing M01418239-I1 reached an approved status.
DOB lists a first permit date for M01408051-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01418230-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01418239-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01408051-S1. That is not by itself confirmation of activity on site.
Mechanical application filed in conjunction with boiler replacement application. No change in use, egress or occupancy. Filing M01418230-P1.
Plumbing application filed for the related plumbing portion (gas & water connections) of the boiler replacement work on the 11th Floor as filed under boiler application M0410805-I1 & S1. no change in use or egress. Filing M01418239-P1.
The latest status recorded for M01418239-I1 is “Permit Entire.”
Filing M01418239-P1 reached an approved status.
The latest status recorded for M01418239-P1 is “Approved.”
This alteration is being filed for the replacement of the boiler equipment. There are no change in use, egress or occupancy under this application. Filing M01408051-P4.
This alteration is being filed for the replacement of the boiler equipment. There are no change in use, egress or occupancy under this application. Filing M01408051-P3.
Filing M01408051-P4 reached an approved status.
The latest status recorded for M01408051-P4 is “Approved.”
Filing M01408051-P3 reached an approved status.
The latest status recorded for M01408051-P3 is “Approved.”
Filing M01418230-P1 reached an approved status.
The latest status recorded for M01418230-P1 is “Approved.”
The latest status recorded for M01408051-I1 is “Permit Entire.”
The latest status recorded for M01408051-S1 is “Permit Entire.”
The latest status recorded for M01418230-I1 is “Permit Entire.”