Building record · BIN 1010312

285 Hudson Street

285 Hudson Street, Manhattan, NY 10013

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 9 independently sourced records, including 5 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 1010312

285 Hudson Street

Soho-Little Italy-Hudson Square, Manhattan

A consolidated public-record view · updated Oct 30, 2026

DOB filings
9
Active-status
5
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings9
Open or active-status records5
First included filingAug 18, 2025
Latest recorded changeOct 30, 2026

The lot

What is already here?

The lot holds a 4-story office building built in 1970, on a 2,250 sq ft lot.

Built
1970
Floors
4
Residential units
1
Building type
Office building
Land use
Commercial and office
Zoning district
C6-2A
Lot area
2,250 sq ft
Building area
6,125 sq ft

Housing violations

1 violation is open against this address under the Housing Maintenance Code.

  • 0Immediately hazardous
  • 1Hazardous
  • 0Non-hazardous
  • 0Information order

Open means the Department of Housing Preservation and Development has not recorded it as corrected, which is not the same as nobody having fixed it. The city publishes the apartment each was written against; that is not carried here, because a count says a building has a problem and an apartment number says whose.

The apartments

646 condominium apartments are assessed on this block, and the typical one is 1,407 sq ft (131 m²). They run from 26 to 471 m².

The city values the typical one at $621,951. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.

What it sold for

27 apartments on this tax block changed hands in the year the city last published, at a median of $3,100,000, from 1,515,000 to 8,250,000.

Recorded sale prices from the Department of Finance’s rolling file, covering the year to Sep 30, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.

Owner of record

PONTE EQUITIES INC

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 5, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 1 open notice on record for this building, out of 1 notice on file; the most recent was issued Sep 23, 2024.

  • Low pressure boiler

    Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 4, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1010312. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 5 new building, 4 full demolition. Its latest status categories are 4 approved, 1 under review, 4 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Aug 18, 2025
Latest recorded change
Oct 30, 2026
Highest proposed story count
10 stories
Highest proposed unit count
12 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 285 Hudson Street.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 9 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Demolition filed

    Full demolition of four story structure using had held, and mechanical to load out on 1st floor. Filing M01174463-I1.

    01
  2. Demolition filed

    Installation of construction fence to protect site, during full demolition. Filing M01174463-S2.

    02
  3. Demolition filed

    Chute will be built out, to assist with loading out of debris from floor to floor. Bobcat will assist with loading out debris from 1st floor. Filing M01174463-S1.

    03
  4. Demolition approved

    Filing M01174463-S2 reached an approved status.

    04
  5. Demolition approved

    Filing M01174463-S1 reached an approved status.

    05
  6. New building filed

    Proposed foundation work for a new 10-story concrete building plus EMR and bulkhead structure serving to occupy residential space with amenities. Filing M01135979-S1.

    06
  7. Demolition approved

    Filing M01174463-I1 reached an approved status.

    07
  8. New building filed

    Temporary dry standpipe system, including 6" riser, 2" hose valves at each floor, Siamese connection, pressure gauges, and air-release valve. Install air compressor with supervisory switches and alarm components to maintain pressurization. Filing M01135979-S7.

    08
  9. Demolition filed

    Full demolition of four story structure using had held, and mechanical to load out on 1st floor. Filing M01174463-P1.

    09
  10. New building approved

    Filing M01135979-S7 reached an approved status.

    010
  11. Demolition approved

    Filing M01174463-P1 reached an approved status.

    011
  12. Permit recorded for demolition

    DOB lists a first permit date for M01174463-S2. That is not by itself confirmation of activity on site.

    012
  13. Permit recorded for demolition

    DOB lists a first permit date for M01174463-S1. That is not by itself confirmation of activity on site.

    013
  14. Permit recorded for demolition

    DOB lists a first permit date for M01174463-I1. That is not by itself confirmation of activity on site.

    014
  15. New building filed

    Filing herewith for Support for excavation as per plans. Filing M01135979-S2.

    015
  16. New building approved

    Filing M01135979-S2 reached an approved status.

    016
  17. New building filed

    Filing herewith for Support for excavation as per plans. Filing M01135979-P1.

    017
  18. New building filed

    Construction Fence Installation as per plans filed herewith. No change in use, egress or occupancy. Filing M01135979-S8.

    018
  19. New building approved

    Filing M01135979-P1 reached an approved status.

    019
  20. New building approved

    Filing M01135979-S8 reached an approved status.

    020
  21. New building now approved

    The latest status recorded for M01135979-P1 is “Approved.”

    021
  22. New building now approved

    The latest status recorded for M01135979-S2 is “Approved.”

    022
  23. Permit recorded for new building

    DOB lists a first permit date for M01135979-S8. That is not by itself confirmation of activity on site.

    023
  24. Demolition now completed

    The latest status recorded for M01174463-S2 is “Full Demolition Signed-off.”

    024
  25. Demolition now completed

    The latest status recorded for M01174463-S1 is “Full Demolition Signed-off.”

    025
  26. Demolition now completed

    The latest status recorded for M01174463-P1 is “Full Demolition Signed-off.”

    026
  27. Demolition signed off

    DOB recorded a sign-off for M01174463-I1.

    027
  28. Demolition now completed

    The latest status recorded for M01174463-I1 is “LOC Issued.”

    028
  29. New building now approved

    The latest status recorded for M01135979-S8 is “Permit Entire.”

    029
  30. New building now under review

    The latest status recorded for M01135979-S1 is “Objections.”

    030
  31. Permit recorded for new building

    DOB lists a first permit date for M01135979-S7. That is not by itself confirmation of activity on site.

    031
  32. New building now approved

    The latest status recorded for M01135979-S7 is “Permit Entire.”

    032