DOB filing M01022299-I1
Alteration filing at 75 9 Avenue
Building record · BIN 1012541
75 9 Avenue, Manhattan, NY 10011
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 6 independently sourced records, including 5 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1012541
75 9 Avenue
Chelsea-Hudson Yards, Manhattan
A consolidated public-record view · updated Nov 10, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 8-story office building built in 1905, on a 165,200 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 13, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 6 open notices on record for this building, out of 361 notices on file; the most recent was issued Jan 16, 2020.
Issued Jan 16, 2020
Issued Jan 16, 2020
Issued Jan 16, 2020 — CEASE USE
3 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 30, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1012541. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 6 alteration filing. Its latest status categories are 5 approved, 1 closed or withdrawn. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 75 9 Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 6 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Installation of 300 psf sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application. Filing M00960452-I1.
DOB lists a first permit date for M00960452-I1. That is not by itself confirmation of activity on site.
Installation and use of temporary supported scaffold as per plans filed herewith. no change in use, egress, or occupancy. Filing M01022299-I1.
DOB lists a first permit date for M01022299-I1. That is not by itself confirmation of activity on site.
Interior renovation to an existing commercial space (720 sf). no change in use, occupancy, or egress is required. Filing M01390049-I1.
Filing M01390049-I1 reached an approved status.
DOB lists a first permit date for M01390049-I1. That is not by itself confirmation of activity on site.
Interior renovation to an existing commercial space (720 sf). no change in use, occupancy, or egress is required. Filing M01390049-P1.
Filing M01390049-P1 reached an approved status.
The latest status recorded for M01390049-P1 is “Approved.”
Installation of a self-contained ventless hood for electric cooking equipment in an ex. commercial kitchen. scope of work does not require change in occupancy, egress, or use. Filing M01450201-I1.
Filing M01450201-I1 reached an approved status.
The latest status recorded for M01450201-I1 is “Approved.”
The latest status recorded for M01390049-I1 is “Permit Entire.”
The latest status recorded for M01390049-S2 is “Filing Withdrawn.”
The latest status recorded for M00960452-I1 is “Permit Entire.”
The latest status recorded for M01022299-I1 is “Permit Entire.”