DOB filing M01454807-I1
Alteration filing at 1 Penn Plaza
Building record · BIN 1014387
1 Penn Plaza, Manhattan, NY 10119
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 28 independently sourced records, including 17 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1014387
1 Penn Plaza
Midtown South-Flatiron-Union Square, Manhattan
A consolidated public-record view · updated Sep 11, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 57-story office building built in 1972, on a 127,966 sq ft lot.
Owner of record
KORPENN LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 15, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 20 open notices on record for this building, out of 613 notices on file; the most recent was issued Aug 20, 2026.
Issued Aug 20, 2026 — BOROUGH COMMISSIONER STOP WORK ORDER APPLICATION M01193178-I1 DUE TO APPLICANT WITHDRAWAL.
Issued Aug 20, 2026 — BOROUGH COMMISSIONER STOP WORK ORDER APPLICATION M01193176-I1 DUE TO APPLICANT WITHDRAWAL.
Issued Aug 8, 2021 — DAMAGED OBSERVED TO THE CMU BLOCK WALL AT LEVEL 8 OF UNDERGROUND PARKI NG GARAGE DUE TO A WATER MAIN BREAK IN THE STREET
17 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 15, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1014387. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 28 alteration filing. Its latest status categories are 15 approved, 2 under review, 11 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 1 Penn Plaza.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 28 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Mechanical work on the 17th floor (Liuzzo) as indicated on drawings. Filing M01115290-I1.
Filing M01115290-I1 reached an approved status.
DOB lists a first permit date for M01115290-I1. That is not by itself confirmation of activity on site.
Mechanical work on the 15th floor (Coforge LLW) as indicated on drawings. Filing M01156852-I1.
Filing M01156852-I1 reached an approved status.
Plumbing work on the 39th floor (restrooms) as indicated on drawings. Filing M01210740-I1.
Mechanical work on the 39th floor (corridor) as indicated on drawings. Filing M01210476-I1.
Filing M01210740-I1 reached an approved status.
Filing M01210476-I1 reached an approved status.
DOB lists a first permit date for M01210476-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01156852-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01210740-I1. That is not by itself confirmation of activity on site.
Plumbing work on the 31st floor (EyeBio) as indicated on drawings. Filing M01199184-I1.
Filing M01199184-I1 reached an approved status.
Plumbing work on the 40th floor (restrooms) as indicated on drawings. Filing M01210976-I1.
Mechanical work on the 40th floor (restrooms) as indicated on drawings. Filing M01210972-I1.
DOB lists a first permit date for M01199184-I1. That is not by itself confirmation of activity on site.
Filing M01210972-I1 reached an approved status.
Filing M01210976-I1 reached an approved status.
DOB lists a first permit date for M01210972-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01210976-I1. That is not by itself confirmation of activity on site.
Plumbing work on the 9th floor (Cisco toilets) as indicated on drawings. Filing M01171930-I1.
Filing M01171930-I1 reached an approved status.
DOB lists a first permit date for M01171930-I1. That is not by itself confirmation of activity on site.
Plumbing work on the 25th floor (Samsung-phase I ) as indicated on drawings. Filing M01262625-I1.
Filing M01262625-I1 reached an approved status.
DOB lists a first permit date for M01262625-I1. That is not by itself confirmation of activity on site.
Application filed for associated plumbing and sprinkler work for renovation of existing commercial space. No change to use, egress, or occupancy. Filing M01234812-I1.
Filing M01234812-I1 reached an approved status.
Sprinkler work on the 6th floor (Lock 8) as indicated on drawings. Filing M01238378-I1.
Filing M01238378-I1 reached an approved status.
DOB lists a first permit date for M01238378-I1. That is not by itself confirmation of activity on site.
Plumbing work on the 17th floor (Ownership Works expansion) as indicated on drawings. Filing M01296988-I1.
Filing M01296988-I1 reached an approved status.
Sprinkler work on the 39th floor (Kyriba) as indicated on drawings. Filing M01297402-I1.
Filing M01297402-I1 reached an approved status.
DOB lists a first permit date for M01296988-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01297402-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01234812-I1. That is not by itself confirmation of activity on site.
Construction work on the 38th floor (Nuvation Bio) as indicated on drawings. Filing M01319369-I1.
Filing M01319369-I1 reached an approved status.
DOB lists a first permit date for M01319369-I1. That is not by itself confirmation of activity on site.
Construction work on the 6th floor (VHB office relocation) as indicated on drawings. Filing M01439240-I1.
DOB recorded a sign-off for M01238378-I1.
The latest status recorded for M01238378-I1 is “LOC Issued.”
Construction work on the 15th floor (Acuity) as indicated on drawings. Filing M01439404-I1.
Sprinkler work on the 15th floor (Acuity) as indicated on drawings. Filing M01439414-I1.
Filing M01439414-I1 reached an approved status.
Plumbing work on the 15th floor (Acuity) as indicated on drawings. Filing M01439410-I1.
Filing M01439410-I1 reached an approved status.
Mechanical work on the 15th floor (Acuity) as indicated on drawings. Filing M01439405-I1.
Filing M01439240-I1 reached an approved status.
Filing M01439404-I1 reached an approved status.
Filing M01439405-I1 reached an approved status.
DOB lists a first permit date for M01439405-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for M01297402-I1.
The latest status recorded for M01297402-I1 is “LOC Issued.”
DOB lists a first permit date for M01439240-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01439240-I1 is “Permit Entire.”
DOB lists a first permit date for M01439404-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01439404-I1 is “Permit Entire.”
DOB lists a first permit date for M01439410-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01439410-I1 is “Permit Entire.”
DOB recorded a sign-off for M01115290-I1.
The latest status recorded for M01115290-I1 is “LOC Issued.”
The latest status recorded for M01439405-I1 is “Permit Entire.”
Sprinkler work on the 6th floor (VHB office relocation) as indicated on drawings. Filing M01439270-I1.
Plumbing work on the 6th floor (VHB office relocation) as indicated on drawings. Filing M01439261-I1.
Filing M01439261-I1 reached an approved status.
DOB lists a first permit date for M01439414-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01439414-I1 is “Permit Entire.”
DOB recorded a sign-off for M01210476-I1.
The latest status recorded for M01210476-I1 is “LOC Issued.”
Filing M01439270-I1 reached an approved status.
Mechanical work on the 6th floor (VHB office relocation) as indicated on drawings. Filing M01439247-I1.
Mechanical work on the 15th floor (Coforge LLW) as indicated on drawings. Filing M01156852-P1.
The latest status recorded for M01234812-I1 is “Permit Entire.”
Application filed for associated plumbing and sprinkler work for renovation of existing commercial space. No change to use, egress, or occupancy. Filing M01234812-P1.
Filing M01234812-P1 reached an approved status.
The latest status recorded for M01234812-P1 is “Approved.”
Filing M01156852-P1 reached an approved status.
The latest status recorded for M01156852-P1 is “Approved.”
Filing M01439247-I1 reached an approved status.
The latest status recorded for M01439247-I1 is “Approved.”
The latest status recorded for M01156852-I1 is “Permit Entire.”
DOB recorded a sign-off for M01262625-I1.
The latest status recorded for M01262625-I1 is “LOC Issued.”
DOB lists a first permit date for M01439261-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01439261-I1 is “Permit Entire.”
The latest status recorded for M01439270-I1 is “Approved.”
DOB recorded a sign-off for M01296988-I1.
The latest status recorded for M01296988-I1 is “LOC Issued.”
Installation of temporary sprinkler loop on the 8th floor as indicated on drawings. Filing M01454807-I1.
Plumbing work on the 31st floor (EyeBio) as indicated on drawings. Filing M01199184-P1.
Plumbing work on the 6th floor (Lock 8) as indicated on drawings. Filing M01238369-P1.
The latest status recorded for M01238369-P1 is “Prof Cert QA Review.”
DOB recorded a sign-off for M01210976-I1.
The latest status recorded for M01210976-I1 is “LOC Issued.”
DOB recorded a sign-off for M01210972-I1.
The latest status recorded for M01210972-I1 is “LOC Issued.”
DOB recorded a sign-off for M01210740-I1.
The latest status recorded for M01210740-I1 is “LOC Issued.”
DOB recorded a sign-off for M01171930-I1.
The latest status recorded for M01171930-I1 is “LOC Issued.”
Filing M01454807-I1 reached an approved status.
The latest status recorded for M01454807-I1 is “Approved.”
Renovation of existing commercial space. Work includes partitions, flooring & ceiling, mechanical work for new kitchen exhaust and ventilation systems and rooftop dunnage for units. No change to use, egress, or occupancy. Filing M01234744-P1.
The latest status recorded for M01234744-P1 is “Pending Prof Cert QA Assignment.”
DOB recorded a sign-off for M01319369-I1.
The latest status recorded for M01319369-I1 is “LOC Issued.”
The latest status recorded for M01199184-I1 is “Permit Entire.”
Filing M01199184-P1 reached an approved status.
The latest status recorded for M01199184-P1 is “Approved.”