Building record · BIN 1014387

1 Penn Plaza

1 Penn Plaza, Manhattan, NY 10119

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 28 independently sourced records, including 17 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 1014387

1 Penn Plaza

Midtown South-Flatiron-Union Square, Manhattan

A consolidated public-record view · updated Sep 11, 2026

DOB filings
28
Active-status
17
Recorded addresses
2
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings28
Open or active-status records17
First included filingNov 21, 2024
Latest recorded changeSep 11, 2026

The lot

What is already here?

The lot holds a 57-story office building built in 1972, on a 127,966 sq ft lot.

  1. Floors 15–57Above the southern skylineAbove the tallest building within sixty metres to the south, which stands 44.4 m. Nothing on that side reaches this floor.
  2. Floors 2–14Nothing on record
  3. Floor 1Street levelStreet level. The lot is recorded as commercial and office, so this floor is where the commercial space is.
  • Street levelCommercial and office
  • Above the southern skylineFrom about floor 15 — the tallest thing within 60 m to the south is 44.4 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 222.1 m over 57 floors, as the city counts them. 2 runs of floors have something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1972
Floors
57
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C6-4
Lot area
127,966 sq ft
Building area
2,689,635 sq ft

Owner of record

KORPENN LLC

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 15, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 20 open notices on record for this building, out of 613 notices on file; the most recent was issued Aug 20, 2026.

  • Construction

    Issued Aug 20, 2026 — BOROUGH COMMISSIONER STOP WORK ORDER APPLICATION M01193178-I1 DUE TO APPLICANT WITHDRAWAL.

  • Construction

    Issued Aug 20, 2026 — BOROUGH COMMISSIONER STOP WORK ORDER APPLICATION M01193176-I1 DUE TO APPLICANT WITHDRAWAL.

  • Construction

    Issued Aug 8, 2021 — DAMAGED OBSERVED TO THE CMU BLOCK WALL AT LEVEL 8 OF UNDERGROUND PARKI NG GARAGE DUE TO A WATER MAIN BREAK IN THE STREET

  • 17 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 15, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1014387. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 28 alteration filing. Its latest status categories are 15 approved, 2 under review, 11 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Nov 21, 2024
Latest recorded change
Sep 11, 2026
Highest proposed story count
57 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 1 Penn Plaza.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 28 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Mechanical work on the 17th floor (Liuzzo) as indicated on drawings. Filing M01115290-I1.

    01
  2. Alteration approved

    Filing M01115290-I1 reached an approved status.

    02
  3. Permit recorded for alteration

    DOB lists a first permit date for M01115290-I1. That is not by itself confirmation of activity on site.

    03
  4. Alteration filed

    Mechanical work on the 15th floor (Coforge LLW) as indicated on drawings. Filing M01156852-I1.

    04
  5. Alteration approved

    Filing M01156852-I1 reached an approved status.

    05
  6. Alteration filed

    Plumbing work on the 39th floor (restrooms) as indicated on drawings. Filing M01210740-I1.

    06
  7. Alteration filed

    Mechanical work on the 39th floor (corridor) as indicated on drawings. Filing M01210476-I1.

    07
  8. Alteration approved

    Filing M01210740-I1 reached an approved status.

    08
  9. Alteration approved

    Filing M01210476-I1 reached an approved status.

    09
  10. Permit recorded for alteration

    DOB lists a first permit date for M01210476-I1. That is not by itself confirmation of activity on site.

    010
  11. Permit recorded for alteration

    DOB lists a first permit date for M01156852-I1. That is not by itself confirmation of activity on site.

    011
  12. Permit recorded for alteration

    DOB lists a first permit date for M01210740-I1. That is not by itself confirmation of activity on site.

    012
  13. Alteration filed

    Plumbing work on the 31st floor (EyeBio) as indicated on drawings. Filing M01199184-I1.

    013
  14. Alteration approved

    Filing M01199184-I1 reached an approved status.

    014
  15. Alteration filed

    Plumbing work on the 40th floor (restrooms) as indicated on drawings. Filing M01210976-I1.

    015
  16. Alteration filed

    Mechanical work on the 40th floor (restrooms) as indicated on drawings. Filing M01210972-I1.

    016
  17. Permit recorded for alteration

    DOB lists a first permit date for M01199184-I1. That is not by itself confirmation of activity on site.

    017
  18. Alteration approved

    Filing M01210972-I1 reached an approved status.

    018
  19. Alteration approved

    Filing M01210976-I1 reached an approved status.

    019
  20. Permit recorded for alteration

    DOB lists a first permit date for M01210972-I1. That is not by itself confirmation of activity on site.

    020
  21. Permit recorded for alteration

    DOB lists a first permit date for M01210976-I1. That is not by itself confirmation of activity on site.

    021
  22. Alteration filed

    Plumbing work on the 9th floor (Cisco toilets) as indicated on drawings. Filing M01171930-I1.

    022
  23. Alteration approved

    Filing M01171930-I1 reached an approved status.

    023
  24. Permit recorded for alteration

    DOB lists a first permit date for M01171930-I1. That is not by itself confirmation of activity on site.

    024
  25. Alteration filed

    Plumbing work on the 25th floor (Samsung-phase I ) as indicated on drawings. Filing M01262625-I1.

    025
  26. Alteration approved

    Filing M01262625-I1 reached an approved status.

    026
  27. Permit recorded for alteration

    DOB lists a first permit date for M01262625-I1. That is not by itself confirmation of activity on site.

    027
  28. Alteration filed

    Application filed for associated plumbing and sprinkler work for renovation of existing commercial space. No change to use, egress, or occupancy. Filing M01234812-I1.

    028
  29. Alteration approved

    Filing M01234812-I1 reached an approved status.

    029
  30. Alteration filed

    Sprinkler work on the 6th floor (Lock 8) as indicated on drawings. Filing M01238378-I1.

    030
  31. Alteration approved

    Filing M01238378-I1 reached an approved status.

    031
  32. Permit recorded for alteration

    DOB lists a first permit date for M01238378-I1. That is not by itself confirmation of activity on site.

    032
  33. Alteration filed

    Plumbing work on the 17th floor (Ownership Works expansion) as indicated on drawings. Filing M01296988-I1.

    033
  34. Alteration approved

    Filing M01296988-I1 reached an approved status.

    034
  35. Alteration filed

    Sprinkler work on the 39th floor (Kyriba) as indicated on drawings. Filing M01297402-I1.

    035
  36. Alteration approved

    Filing M01297402-I1 reached an approved status.

    036
  37. Permit recorded for alteration

    DOB lists a first permit date for M01296988-I1. That is not by itself confirmation of activity on site.

    037
  38. Permit recorded for alteration

    DOB lists a first permit date for M01297402-I1. That is not by itself confirmation of activity on site.

    038
  39. Permit recorded for alteration

    DOB lists a first permit date for M01234812-I1. That is not by itself confirmation of activity on site.

    039
  40. Alteration filed

    Construction work on the 38th floor (Nuvation Bio) as indicated on drawings. Filing M01319369-I1.

    040
  41. Alteration approved

    Filing M01319369-I1 reached an approved status.

    041
  42. Permit recorded for alteration

    DOB lists a first permit date for M01319369-I1. That is not by itself confirmation of activity on site.

    042
  43. Alteration filed

    Construction work on the 6th floor (VHB office relocation) as indicated on drawings. Filing M01439240-I1.

    043
  44. Alteration signed off

    DOB recorded a sign-off for M01238378-I1.

    044
  45. Alteration now completed

    The latest status recorded for M01238378-I1 is “LOC Issued.”

    045
  46. Alteration filed

    Construction work on the 15th floor (Acuity) as indicated on drawings. Filing M01439404-I1.

    046
  47. Alteration filed

    Sprinkler work on the 15th floor (Acuity) as indicated on drawings. Filing M01439414-I1.

    047
  48. Alteration approved

    Filing M01439414-I1 reached an approved status.

    048
  49. Alteration filed

    Plumbing work on the 15th floor (Acuity) as indicated on drawings. Filing M01439410-I1.

    049
  50. Alteration approved

    Filing M01439410-I1 reached an approved status.

    050
  51. Alteration filed

    Mechanical work on the 15th floor (Acuity) as indicated on drawings. Filing M01439405-I1.

    051
  52. Alteration approved

    Filing M01439240-I1 reached an approved status.

    052
  53. Alteration approved

    Filing M01439404-I1 reached an approved status.

    053
  54. Alteration approved

    Filing M01439405-I1 reached an approved status.

    054
  55. Permit recorded for alteration

    DOB lists a first permit date for M01439405-I1. That is not by itself confirmation of activity on site.

    055
  56. Alteration signed off

    DOB recorded a sign-off for M01297402-I1.

    056
  57. Alteration now completed

    The latest status recorded for M01297402-I1 is “LOC Issued.”

    057
  58. Permit recorded for alteration

    DOB lists a first permit date for M01439240-I1. That is not by itself confirmation of activity on site.

    058
  59. Alteration now approved

    The latest status recorded for M01439240-I1 is “Permit Entire.”

    059
  60. Permit recorded for alteration

    DOB lists a first permit date for M01439404-I1. That is not by itself confirmation of activity on site.

    060
  61. Alteration now approved

    The latest status recorded for M01439404-I1 is “Permit Entire.”

    061
  62. Permit recorded for alteration

    DOB lists a first permit date for M01439410-I1. That is not by itself confirmation of activity on site.

    062
  63. Alteration now approved

    The latest status recorded for M01439410-I1 is “Permit Entire.”

    063
  64. Alteration signed off

    DOB recorded a sign-off for M01115290-I1.

    064
  65. Alteration now completed

    The latest status recorded for M01115290-I1 is “LOC Issued.”

    065
  66. Alteration now approved

    The latest status recorded for M01439405-I1 is “Permit Entire.”

    066
  67. Alteration filed

    Sprinkler work on the 6th floor (VHB office relocation) as indicated on drawings. Filing M01439270-I1.

    067
  68. Alteration filed

    Plumbing work on the 6th floor (VHB office relocation) as indicated on drawings. Filing M01439261-I1.

    068
  69. Alteration approved

    Filing M01439261-I1 reached an approved status.

    069
  70. Permit recorded for alteration

    DOB lists a first permit date for M01439414-I1. That is not by itself confirmation of activity on site.

    070
  71. Alteration now approved

    The latest status recorded for M01439414-I1 is “Permit Entire.”

    071
  72. Alteration signed off

    DOB recorded a sign-off for M01210476-I1.

    072
  73. Alteration now completed

    The latest status recorded for M01210476-I1 is “LOC Issued.”

    073
  74. Alteration approved

    Filing M01439270-I1 reached an approved status.

    074
  75. Alteration filed

    Mechanical work on the 6th floor (VHB office relocation) as indicated on drawings. Filing M01439247-I1.

    075
  76. Alteration filed

    Mechanical work on the 15th floor (Coforge LLW) as indicated on drawings. Filing M01156852-P1.

    076
  77. Alteration now approved

    The latest status recorded for M01234812-I1 is “Permit Entire.”

    077
  78. Alteration filed

    Application filed for associated plumbing and sprinkler work for renovation of existing commercial space. No change to use, egress, or occupancy. Filing M01234812-P1.

    078
  79. Alteration approved

    Filing M01234812-P1 reached an approved status.

    079
  80. Alteration now approved

    The latest status recorded for M01234812-P1 is “Approved.”

    080
  81. Alteration approved

    Filing M01156852-P1 reached an approved status.

    081
  82. Alteration now approved

    The latest status recorded for M01156852-P1 is “Approved.”

    082
  83. Alteration approved

    Filing M01439247-I1 reached an approved status.

    083
  84. Alteration now approved

    The latest status recorded for M01439247-I1 is “Approved.”

    084
  85. Alteration now approved

    The latest status recorded for M01156852-I1 is “Permit Entire.”

    085
  86. Alteration signed off

    DOB recorded a sign-off for M01262625-I1.

    086
  87. Alteration now completed

    The latest status recorded for M01262625-I1 is “LOC Issued.”

    087
  88. Permit recorded for alteration

    DOB lists a first permit date for M01439261-I1. That is not by itself confirmation of activity on site.

    088
  89. Alteration now approved

    The latest status recorded for M01439261-I1 is “Permit Entire.”

    089
  90. Alteration now approved

    The latest status recorded for M01439270-I1 is “Approved.”

    090
  91. Alteration signed off

    DOB recorded a sign-off for M01296988-I1.

    091
  92. Alteration now completed

    The latest status recorded for M01296988-I1 is “LOC Issued.”

    092
  93. Alteration filed

    Installation of temporary sprinkler loop on the 8th floor as indicated on drawings. Filing M01454807-I1.

    093
  94. Alteration filed

    Plumbing work on the 31st floor (EyeBio) as indicated on drawings. Filing M01199184-P1.

    094
  95. Alteration filed

    Plumbing work on the 6th floor (Lock 8) as indicated on drawings. Filing M01238369-P1.

    095
  96. Alteration now under review

    The latest status recorded for M01238369-P1 is “Prof Cert QA Review.”

    096
  97. Alteration signed off

    DOB recorded a sign-off for M01210976-I1.

    097
  98. Alteration now completed

    The latest status recorded for M01210976-I1 is “LOC Issued.”

    098
  99. Alteration signed off

    DOB recorded a sign-off for M01210972-I1.

    099
  100. Alteration now completed

    The latest status recorded for M01210972-I1 is “LOC Issued.”

    0100
  101. Alteration signed off

    DOB recorded a sign-off for M01210740-I1.

    0101
  102. Alteration now completed

    The latest status recorded for M01210740-I1 is “LOC Issued.”

    0102
  103. Alteration signed off

    DOB recorded a sign-off for M01171930-I1.

    0103
  104. Alteration now completed

    The latest status recorded for M01171930-I1 is “LOC Issued.”

    0104
  105. Alteration approved

    Filing M01454807-I1 reached an approved status.

    0105
  106. Alteration now approved

    The latest status recorded for M01454807-I1 is “Approved.”

    0106
  107. Alteration filed

    Renovation of existing commercial space. Work includes partitions, flooring & ceiling, mechanical work for new kitchen exhaust and ventilation systems and rooftop dunnage for units. No change to use, egress, or occupancy. Filing M01234744-P1.

    0107
  108. Alteration now under review

    The latest status recorded for M01234744-P1 is “Pending Prof Cert QA Assignment.”

    0108
  109. Alteration signed off

    DOB recorded a sign-off for M01319369-I1.

    0109
  110. Alteration now completed

    The latest status recorded for M01319369-I1 is “LOC Issued.”

    0110
  111. Alteration now approved

    The latest status recorded for M01199184-I1 is “Permit Entire.”

    0111
  112. Alteration approved

    Filing M01199184-P1 reached an approved status.

    0112
  113. Alteration now approved

    The latest status recorded for M01199184-P1 is “Approved.”

    0113