DOB filing M01248916-I1
Alteration filing at 129 West 29 Street
Building record · BIN 1015143
129 West 29 Street, Manhattan, NY 10001
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 4 independently sourced records, including 4 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1015143
129 West 29 Street
Midtown South-Flatiron-Union Square, Manhattan
A consolidated public-record view · updated Oct 23, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 12-story office building built in 1911, on a 7,252 sq ft lot.
The apartments
90 condominium apartments are assessed on this block, and the typical one is 2,064 sq ft (192 m²). They run from 130 to 358 m².
The city values the typical one at $701,553. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.
What it sold for
7 apartments on this tax block changed hands in the year the city last published, at a median of $1,878,215, from 125,000 to 4,995,000.
Recorded sale prices from the Department of Finance’s rolling file, covering the year to Sep 30, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.
Owner of record
345 7TH AVENUE REALTY OWNER LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 27, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 3 open notices on record for this building, out of 86 notices on file; the most recent was issued Nov 14, 2025.
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Issued Dec 1, 2024 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
Issued Mar 5, 2000 — 1P5205
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 27, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1015143. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 4 alteration filing. Its latest status categories are 4 under review. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 129 West 29 Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 4 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Renovation of a commercial space on the 1st flr and cellar with the removal of exist. non-load bearing partitions, doors, and install partitions, doors, and general repairs to the floors, ceilings, and walls. no change in use, egress, or occupancy. Filing M01248916-I1.
Filing M01248916-I1 reached an approved status.
DOB lists a first permit date for M01248916-I1. That is not by itself confirmation of activity on site.
Propose structural work to resolve ecb violation #39160689p, with the installation of a new structural steel beam to support the new proposed dumbwaiter. no change in use, egress, or occupancy. Filing M01248916-S3.
Interior renovation of office spaces from floor 003 to floor 005 with the installation & replacement of new doors, partitions, painting work, and general repairs to the floor, ceilings, and partitions. no change in use, egress, or occupancy. Filing M01248916-S4.
Renovation of office spaces from floor 003 to floor 005 with the installation of new HVAC and a/c units for the 3rd, 4th, and 5th floor office spaces. no change in use, egress, or occupancy. Filing M01248916-S6.
Filing M01248916-S4 reached an approved status.
Filing M01248916-S3 reached an approved status.
Filing M01248916-S6 reached an approved status.
DOB lists a first permit date for M01248916-S6. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01248916-S3. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01248916-S4. That is not by itself confirmation of activity on site.
The latest status recorded for M01248916-S6 is “On Hold - Pending Withdrawal of Special Inspector.”
The latest status recorded for M01248916-I1 is “On Hold - Pending Withdrawal of Progress Inspector.”
The latest status recorded for M01248916-S3 is “On Hold - Pending Withdrawal of Special Inspector.”
The latest status recorded for M01248916-S4 is “On Hold - Pending Withdrawal of Progress Inspector.”