Building record · BIN 1015275

1411 Broadway

1411 Broadway, Manhattan, NY 10018

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 24 independently sourced records, including 16 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 1015275

1411 Broadway

Midtown-Times Square, Manhattan

A consolidated public-record view · updated Nov 6, 2026

DOB filings
24
Active-status
16
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings24
Open or active-status records16
First included filingJul 12, 2024
Latest recorded changeNov 6, 2026

The lot

What is already here?

The lot holds a 42-story office building built in 1969, on a 50,765 sq ft lot.

  1. Floors 37–42Above the southern skylineAbove the tallest building within sixty metres to the south, which stands 109.7 m. Nothing on that side reaches this floor.
  2. Floors 2–36Nothing on record
  3. Floor 1Street levelStreet level. The lot is recorded as commercial and office, so this floor is where the commercial space is.
  • Street levelCommercial and office
  • Above the southern skylineFrom about floor 37 — the tallest thing within 60 m to the south is 109.7 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 152.2 m over 42 floors, as the city counts them. 2 runs of floors have something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1969
Last altered
2016
Floors
42
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C5-3
Lot area
50,765 sq ft
Building area
1,088,074 sq ft

Owner of record

1411 IC-SIC PROPERTY LLC

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 11, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 191 notices on file; the most recent was issued Dec 1, 2024.

  • Failure to post energy

    Issued Dec 1, 2024 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

  • Failure to post energy

    Issued Dec 1, 2023 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

  • Elevator

    Issued Aug 12, 2008

  • 1 further open notice is on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 10, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1015275. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 24 alteration filing. Its latest status categories are 15 approved, 8 recorded as completed, 1 under review. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Jul 12, 2024
Latest recorded change
Nov 6, 2026
Highest proposed story count
42 stories
Highest proposed unit count
100 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 1411 Broadway.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 24 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Structural Modifications: Structural Steel Reinforcing and Reinforcing Existing Roof Slab on the 40-42 and Roof Levels as per plans (ATRU Abatement Filing.) No change to use, egress or occupancy. Filing M01075656-I1.

    01
  2. Alteration approved

    Filing M01075656-I1 reached an approved status.

    02
  3. Alteration filed

    Plumbing/sprinkler filing as per plans. no change in use, egress or occupancy. Filing M01201364-I1.

    03
  4. Alteration filed

    Mechanical filing as per plans. no change in use, egress or occupancy. Filing M01201356-I1.

    04
  5. Alteration approved

    Filing M01201364-I1 reached an approved status.

    05
  6. Alteration approved

    Filing M01201356-I1 reached an approved status.

    06
  7. Permit recorded for alteration

    DOB lists a first permit date for M01201356-I1. That is not by itself confirmation of activity on site.

    07
  8. Permit recorded for alteration

    DOB lists a first permit date for M01201364-I1. That is not by itself confirmation of activity on site.

    08
  9. Alteration filed

    Exterior alterations to add new occupiable roof level; reinforcing existing roof slab, install new rooftop canopy structure, new slab opening for HVAC, slab infill on the 43rd Floors and Roof as per plans (Rooftop Amenity Space.). Filing M01229500-I1.

    09
  10. Alteration approved

    Filing M01229500-I1 reached an approved status.

    010
  11. Alteration filed

    Structural Modifications: Structural Steel Reinforcing and column reinforcement on 38-39th Floors as per plans (Rooftop Amenity Space.) No change to use, egress or occupancy. Filing M01229479-I1.

    011
  12. Alteration approved

    Filing M01229479-I1 reached an approved status.

    012
  13. Permit recorded for alteration

    DOB lists a first permit date for M01229479-I1. That is not by itself confirmation of activity on site.

    013
  14. Alteration filed

    Installation of sidewalk shed as per plans filed herewith. Filing M01249843-I1.

    014
  15. Permit recorded for alteration

    DOB lists a first permit date for M01249843-I1. That is not by itself confirmation of activity on site.

    015
  16. Permit recorded for alteration

    DOB lists a first permit date for M01075656-I1. That is not by itself confirmation of activity on site.

    016
  17. Alteration filed

    Interior renovations on 26th and 27th floors as shown herewith. no changes to egress, occupancy or use. Filing M01331836-I1.

    017
  18. Alteration approved

    Filing M01331836-I1 reached an approved status.

    018
  19. Permit recorded for alteration

    DOB lists a first permit date for M01331836-I1. That is not by itself confirmation of activity on site.

    019
  20. Alteration filed

    Filing herewith interior renovation on existing 7th floor space, United Hospital Fund. No change in use, egress or occupancy. Filing M01352430-I1.

    020
  21. Alteration filed

    Filing herewith sprinkler work on existing 7th floor space. No change in use, egress or occupancy. Filing M01352454-I1.

    021
  22. Alteration approved

    Filing M01352430-I1 reached an approved status.

    022
  23. Alteration filed

    Filing herewith plumbing work to existing 7th floor space. No change in use, egress or occupancy. Filing M01352449-I1.

    023
  24. Alteration filed

    Filing herewith mechanical work on existing 7th floor space, United Health Fund. No change in use, egress or occupancy. Filing M01352443-I1.

    024
  25. Alteration approved

    Filing M01352449-I1 reached an approved status.

    025
  26. Alteration approved

    Filing M01352443-I1 reached an approved status.

    026
  27. Permit recorded for alteration

    DOB lists a first permit date for M01352443-I1. That is not by itself confirmation of activity on site.

    027
  28. Alteration approved

    Filing M01352454-I1 reached an approved status.

    028
  29. Permit recorded for alteration

    DOB lists a first permit date for M01352430-I1. That is not by itself confirmation of activity on site.

    029
  30. Alteration filed

    Filing herewith standpipe work at existing 7th floor space. No change in use, egress or occupancy. Filing M01352460-I1.

    030
  31. Alteration approved

    Filing M01352460-I1 reached an approved status.

    031
  32. Permit recorded for alteration

    DOB lists a first permit date for M01352449-I1. That is not by itself confirmation of activity on site.

    032
  33. Permit recorded for alteration

    DOB lists a first permit date for M01352454-I1. That is not by itself confirmation of activity on site.

    033
  34. Permit recorded for alteration

    DOB lists a first permit date for M01352460-I1. That is not by itself confirmation of activity on site.

    034
  35. Alteration filed

    Mechanical filing as per plans. no change in use, egress or occupancy. Filing M01386857-I1.

    035
  36. Alteration filed

    Installation of non load bearing partitions as per plans. no change in use, egress or occupancy. Filing M01386533-I1.

    036
  37. Alteration filed

    Structural filing as per plans. no change in use, egress or occupancy. Filing M01387282-I1.

    037
  38. Alteration approved

    Filing M01386857-I1 reached an approved status.

    038
  39. Alteration approved

    Filing M01386533-I1 reached an approved status.

    039
  40. Permit recorded for alteration

    DOB lists a first permit date for M01386857-I1. That is not by itself confirmation of activity on site.

    040
  41. Permit recorded for alteration

    DOB lists a first permit date for M01386533-I1. That is not by itself confirmation of activity on site.

    041
  42. Alteration approved

    Filing M01387282-I1 reached an approved status.

    042
  43. Permit recorded for alteration

    DOB lists a first permit date for M01387282-I1. That is not by itself confirmation of activity on site.

    043
  44. Alteration filed

    Use of temporary platform/material hoist as per plans filed herewith. Filing M01378285-P2.

    044
  45. Alteration now under review

    The latest status recorded for M01378285-P2 is “Prof Cert QA Review.”

    045
  46. Alteration signed off

    DOB recorded a sign-off for M01229479-I1.

    046
  47. Alteration now completed

    The latest status recorded for M01229479-I1 is “LOC Issued.”

    047
  48. Permit recorded for alteration

    DOB lists a first permit date for M01229500-I1. That is not by itself confirmation of activity on site.

    048
  49. Alteration signed off

    DOB recorded a sign-off for M01201364-I1.

    049
  50. Alteration now completed

    The latest status recorded for M01201364-I1 is “LOC Issued.”

    050
  51. Alteration signed off

    DOB recorded a sign-off for M01201356-I1.

    051
  52. Alteration now completed

    The latest status recorded for M01201356-I1 is “LOC Issued.”

    052
  53. Alteration signed off

    DOB recorded a sign-off for M01352449-I1.

    053
  54. Alteration now completed

    The latest status recorded for M01352449-I1 is “LOC Issued.”

    054
  55. Alteration signed off

    DOB recorded a sign-off for M01352443-I1.

    055
  56. Alteration now completed

    The latest status recorded for M01352443-I1 is “LOC Issued.”

    056
  57. Alteration now approved

    The latest status recorded for M01387282-I1 is “Permit Entire.”

    057
  58. Alteration now approved

    The latest status recorded for M01386857-I1 is “Permit Entire.”

    058
  59. Alteration signed off

    DOB recorded a sign-off for M01352430-I1.

    059
  60. Alteration now completed

    The latest status recorded for M01352430-I1 is “LOC Issued.”

    060
  61. Alteration now approved

    The latest status recorded for M01229500-I1 is “Permit Entire.”

    061
  62. Alteration filed

    Installation of pipe scaffolding as per plans. pipe scaffold shall comply with chapter # 33 of the 2022 code, no changess in use in egress or occupancy under this application. Filing M01455641-I1.

    062
  63. Alteration now approved

    The latest status recorded for M01331836-I1 is “Permit Entire.”

    063
  64. Alteration filed

    Interior renovations on 26th and 27th floors as shown herewith. no changes to egress, occupancy or use. Filing M01331836-P1.

    064
  65. Alteration approved

    Filing M01331836-P1 reached an approved status.

    065
  66. Alteration now approved

    The latest status recorded for M01331836-P1 is “Approved.”

    066
  67. Permit recorded for alteration

    DOB lists a first permit date for M01455641-I1. That is not by itself confirmation of activity on site.

    067
  68. Alteration now approved

    The latest status recorded for M01075656-I1 is “Permit Entire.”

    068
  69. Alteration now approved

    The latest status recorded for M01249843-I1 is “Permit Entire.”

    069
  70. Alteration filed

    Modifications to the existing Sprinkler System: Remove (206) existing sprinkler heads and Install (41) new sprinkler heads and associated Sprinkler Piping on the 12th Floor as per plans (Hines - Demo, Corridor & Restrooms.). Filing M01465774-I1.

    070
  71. Alteration filed

    Modifications to the existing HVAC System: Remove ductwork, piping and equipment back to building core on the 12th Floor as per plans (Hines - Demo, Corridor & Restroom) No change to use, egress or occupancy. Filing M01465754-I1.

    071
  72. Alteration filed

    Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 12th Floor as per plans (LL Work - Demo, Corridor & Restroom.) No change to use, egress or occupancy. Filing M01465723-I1.

    072
  73. Alteration approved

    Filing M01465723-I1 reached an approved status.

    073
  74. Alteration filed

    Removal of existing plumbing fixtures and install new bathroom fixtures and associated piping on the 12th Floor as per plans. (Hines - Demo, Corridor & Restrooms.) No change to use, egress or occupancy. Filing M01465770-I1.

    074
  75. Alteration approved

    Filing M01465774-I1 reached an approved status.

    075
  76. Alteration approved

    Filing M01465754-I1 reached an approved status.

    076
  77. Permit recorded for alteration

    DOB lists a first permit date for M01465723-I1. That is not by itself confirmation of activity on site.

    077
  78. Alteration now approved

    The latest status recorded for M01465723-I1 is “Permit Entire.”

    078
  79. Alteration approved

    Filing M01465770-I1 reached an approved status.

    079
  80. Alteration now approved

    The latest status recorded for M01465770-I1 is “Approved.”

    080
  81. Alteration filed

    Installation of non load bearing partitions as per plans. no change in use, egress or occupancy. Filing M01386533-P1.

    081
  82. Alteration filed

    Installation of pipe scaffolding as per plans. pipe scaffold shall comply with chapter # 33 of the 2022 code, no changess in use in egress or occupancy under this application. Filing M01455641-P1.

    082
  83. Alteration approved

    Filing M01455641-P1 reached an approved status.

    083
  84. Alteration now approved

    The latest status recorded for M01455641-P1 is “Approved.”

    084
  85. Alteration now approved

    The latest status recorded for M01455641-I1 is “Permit Entire.”

    085
  86. Permit recorded for alteration

    DOB lists a first permit date for M01465774-I1. That is not by itself confirmation of activity on site.

    086
  87. Alteration now approved

    The latest status recorded for M01465774-I1 is “Permit Entire.”

    087
  88. Permit recorded for alteration

    DOB lists a first permit date for M01465754-I1. That is not by itself confirmation of activity on site.

    088
  89. Alteration now approved

    The latest status recorded for M01465754-I1 is “Permit Entire.”

    089
  90. Alteration signed off

    DOB recorded a sign-off for M01352454-I1.

    090
  91. Alteration now completed

    The latest status recorded for M01352454-I1 is “LOC Issued.”

    091
  92. Alteration signed off

    DOB recorded a sign-off for M01352460-I1.

    092
  93. Alteration now completed

    The latest status recorded for M01352460-I1 is “LOC Issued.”

    093
  94. Alteration approved

    Filing M01386533-P1 reached an approved status.

    094
  95. Alteration now approved

    The latest status recorded for M01386533-P1 is “Approved.”

    095
  96. Alteration now approved

    The latest status recorded for M01386533-I1 is “Permit Entire.”

    096