DOB filing M01426617-S1
Alteration filing at 122 5 Avenue
Building record · BIN 1015420
122 5 Avenue, Manhattan, NY 10011
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 9 independently sourced records, including 9 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1015420
122 5 Avenue
Midtown South-Flatiron-Union Square, Manhattan
A consolidated public-record view · updated Sep 8, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 11-story office building built in 1900, on a 21,646 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 10, 2026. They describe the tax lot, not any single filing.
Violation record
The Department of Buildings has 2 open notices on record for this building, out of 87 notices on file; the most recent was issued Aug 26, 2026.
Issued Aug 26, 2026
Issued Aug 20, 2004
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 10, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1015420. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 9 alteration filing. Its latest status categories are 7 approved, 2 under review. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 122 5 Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 9 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Plumbing work associated with new commercial chilled tubs and new commercial sauna as shown on plans. Filing M01022151-S6.
Filing M01022151-S6 reached an approved status.
Interior office renovation on 2nd floor as indicated on plans filed herewith. No change of use, egress or occupancy. Filing M01397856-I1.
The latest status recorded for M01426617-S2 is “OnHold-NoGoodCheck.”
Plumbing modifications on 2nd floor as indicated on plans filed herewith. Filing M01397856-S2.
Mechanical modifications on 2nd Floor as indicated on plans filed herewith. Filing M01397856-S1.
Interior tenant build-out on the 6th floor including installation of new HVAC system and related ductwork/piping. No change in use, egress, or occupancy under this application. Filing M01426617-S1.
Filing M01426617-S1 reached an approved status.
Filing M01397856-I1 reached an approved status.
Installation of full floor sprinkler coverage and relocate an auxiliary fire hose valve and to connect to existing base building combined sprinkler/standpipe system. No change in use, egress or occupancy under this application. Filing M01426617-S3.
Interior tenant build-out on 6th floor including installation of non-load bearing partitions, doors/frames, and related finishes. No change in use, egress or occupancy under this application. Filed in conjunction with ALT. 1 # 121208870. Filing M01426617-I1.
Filing M01426617-S3 reached an approved status.
The latest status recorded for M01426617-S3 is “Approved.”
Filing M01397856-S1 reached an approved status.
The latest status recorded for M01397856-S1 is “Approved.”
The latest status recorded for M01426617-I1 is “OnHold-NoGoodCheck.”
Sprinkler Modifications on 2nd Floor as indicated on plans filed herewith. Filing M01397856-S3.
Filing M01397856-S2 reached an approved status.
The latest status recorded for M01397856-S2 is “Approved.”
Filing M01397856-S3 reached an approved status.
The latest status recorded for M01397856-S3 is “Approved.”
DOB lists a first permit date for M01397856-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01397856-I1 is “Permit Entire.”
DOB lists a first permit date for M01022151-S6. That is not by itself confirmation of activity on site.
The latest status recorded for M01022151-S6 is “Permit Entire.”
The latest status recorded for M01426617-S1 is “Approved.”