Building record · BIN 1015805

1250 Broadway

1250 Broadway, Manhattan, NY 10001

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 19 independently sourced records, including 15 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 1015805

1250 Broadway

Midtown South-Flatiron-Union Square, Manhattan

A consolidated public-record view · updated Oct 8, 2026

DOB filings
19
Active-status
15
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings19
Open or active-status records15
First included filingJan 21, 2026
Latest recorded changeOct 8, 2026

The lot

What is already here?

The lot holds a 39-story office building built in 1969, on a 30,750 sq ft lot.

  1. Floors 36–39Above the southern skylineAbove the tallest building within sixty metres to the south, which stands 106.4 m. Nothing on that side reaches this floor.
  2. Floors 2–35Nothing on record
  3. Floor 1Street levelStreet level. The lot is recorded as commercial and office, so this floor is where the commercial space is.
  • Street levelCommercial and office
  • Above the southern skylineFrom about floor 36 — the tallest thing within 60 m to the south is 106.4 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 137.2 m over 39 floors, as the city counts them. 2 runs of floors have something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1969
Last altered
2014
Floors
39
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C6-6
Lot area
30,750 sq ft
Building area
671,734 sq ft

Owner of record

PINKY REALTY LLC

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 12, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 1 open notice on record for this building, out of 162 notices on file; the most recent was issued Jun 23, 2024.

  • Failure to submit

    Issued Jun 23, 2024 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2023

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 10, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1015805. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 19 alteration filing. Its latest status categories are 15 approved, 4 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Jan 21, 2026
Latest recorded change
Oct 8, 2026
Highest proposed story count
39 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 1250 Broadway.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 19 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    AT 33RD FLOOR TENANT SPACE, installation of sprinkler piping and heads as per plans filed herewith. No change to use, occupancy, or egress. Filing M01340897-I1.

    01
  2. Alteration filed

    AT 33RD FLOOR TENANT SPACE, installation of Plumbing piping and fixtures as per plans filed herewith. No change to use, occupancy, or egress. Filing M01340896-I1.

    02
  3. Alteration approved

    Filing M01340897-I1 reached an approved status.

    03
  4. Alteration approved

    Filing M01340896-I1 reached an approved status.

    04
  5. Alteration filed

    Modification and installation of plumbing fixtures with pipe works. Filing M01349113-I1.

    05
  6. Alteration filed

    Tenant fit-out interior renovation including new partitions, kitchen equipment, lighting, interior finishes, millwork, and bathroom within a fully demised/ fire-raged tenant space. no change in use, egress, or occupancy. Filing M01349170-I1.

    06
  7. Permit recorded for alteration

    DOB lists a first permit date for M01340897-I1. That is not by itself confirmation of activity on site.

    07
  8. Alteration filed

    At 3rd-38th floor, removal of existing plate glass windows and installation of new glass as per plans filed herewith. no change in use, occupancy or egress. work to be done in phases driven by tenant availability and access and will extend beyond 90 days. Filing M01330264-I1.

    08
  9. Alteration approved

    Filing M01330264-I1 reached an approved status.

    09
  10. Permit recorded for alteration

    DOB lists a first permit date for M01340896-I1. That is not by itself confirmation of activity on site.

    010
  11. Alteration approved

    Filing M01349113-I1 reached an approved status.

    011
  12. Permit recorded for alteration

    DOB lists a first permit date for M01330264-I1. That is not by itself confirmation of activity on site.

    012
  13. Alteration filed

    At 27th floor, installation of 2-hour rated demising partitions for tenant spaces and elevator corridor as per plans filed herewith. no change in use, occupancy or egress. Filing M01409338-I1.

    013
  14. Alteration approved

    Filing M01409338-I1 reached an approved status.

    014
  15. Alteration filed

    Emergency temporary shoring to address DOB violation #35730083r.shoring to remain until permanent repairs are filed and completedunder separate application. no change to use, egress, or occupancy. Filing M01432616-I1.

    015
  16. Alteration approved

    Filing M01432616-I1 reached an approved status.

    016
  17. Alteration filed

    At 27th floor south tenant space and shared corridor, installation of interior partitions and finishes as per plans filed herewith. no change in use, occupancy or egress. Filing M01430489-I1.

    017
  18. Alteration approved

    Filing M01430489-I1 reached an approved status.

    018
  19. Alteration filed

    At 27th floor south tenant space and shared corridor, installation of plumbing fixtures and related piping as per plans filed herewith. no change in use, occupancy or egress. Filing M01430495-I1.

    019
  20. Alteration filed

    At 27th floor south tenant space and shared corridor, installation of sprinkler heads and related piping as per plans filed herewith. no change in use, occupancy or egress. Filing M01430498-I1.

    020
  21. Alteration approved

    Filing M01430498-I1 reached an approved status.

    021
  22. Alteration filed

    At 27th floor south tenant space and shared corridor, additions/modifications to existing mechanical system as per plans filed herewith. no change in use, occupancy or egress. Filing M01430493-I1.

    022
  23. Alteration approved

    Filing M01430493-I1 reached an approved status.

    023
  24. Alteration approved

    Filing M01430495-I1 reached an approved status.

    024
  25. Alteration approved

    Filing M01349170-I1 reached an approved status.

    025
  26. Permit recorded for alteration

    DOB lists a first permit date for M01432616-I1. That is not by itself confirmation of activity on site.

    026
  27. Alteration filed

    At 27th floor north tenant space, installation of interior partitions and finishes as per plans filed herewith. no change in use, occupancy or egress. Filing M01441303-I1.

    027
  28. Alteration filed

    At 35th floor tenant space, installation of interior partitions and finishes as per plans filed herewith. no change in use, occupancy or egress. Filing M01441803-I1.

    028
  29. Alteration filed

    At 27th floor north tenant space, installation of plumbing fixtures and related piping as per plans filed herewith. no change in use, occupancy or egress. Filing M01441307-I1.

    029
  30. Alteration approved

    Filing M01441307-I1 reached an approved status.

    030
  31. Alteration approved

    Filing M01441303-I1 reached an approved status.

    031
  32. Alteration approved

    Filing M01441803-I1 reached an approved status.

    032
  33. Alteration filed

    At 35th floor tenant space, installation of plumbing fixtures and related piping as per plans filed herewith. no change in use, occupancy or egress. Filing M01441805-I1.

    033
  34. Alteration approved

    Filing M01441805-I1 reached an approved status.

    034
  35. Alteration filed

    At 35th floor tenant space, installation of sprinkler heads and related piping as per plans filed herewith. no change in use, occupancy or egress. Filing M01441806-I1.

    035
  36. Alteration approved

    Filing M01441806-I1 reached an approved status.

    036
  37. Alteration filed

    At 27th floor north tenant space, additions/modifications to existing mechanical system as per plans filed herewith. no change in use, occupancy or egress. Filing M01441305-I1.

    037
  38. Alteration filed

    At 27th floor north tenant space, installation of sprinkler heads and related piping as per plans filed herewith. no change in use, occupancy or egress. Filing M01441308-I1.

    038
  39. Alteration approved

    Filing M01441305-I1 reached an approved status.

    039
  40. Alteration approved

    Filing M01441308-I1 reached an approved status.

    040
  41. Alteration signed off

    DOB recorded a sign-off for M01432616-I1.

    041
  42. Alteration now completed

    The latest status recorded for M01432616-I1 is “LOC Issued.”

    042
  43. Alteration filed

    At 35th floor tenant space, additions/modifications to existing mechanical system as per plans filed herewith. no change in use, occupancy or egress. Filing M01441804-I1.

    043
  44. Alteration approved

    Filing M01441804-I1 reached an approved status.

    044
  45. Alteration signed off

    DOB recorded a sign-off for M01340896-I1.

    045
  46. Alteration now completed

    The latest status recorded for M01340896-I1 is “LOC Issued.”

    046
  47. Alteration signed off

    DOB recorded a sign-off for M01340897-I1.

    047
  48. Alteration now completed

    The latest status recorded for M01340897-I1 is “LOC Issued.”

    048
  49. Permit recorded for alteration

    DOB lists a first permit date for M01441804-I1. That is not by itself confirmation of activity on site.

    049
  50. Alteration now approved

    The latest status recorded for M01441804-I1 is “Permit Entire.”

    050
  51. Permit recorded for alteration

    DOB lists a first permit date for M01441308-I1. That is not by itself confirmation of activity on site.

    051
  52. Alteration now approved

    The latest status recorded for M01441308-I1 is “Permit Entire.”

    052
  53. Permit recorded for alteration

    DOB lists a first permit date for M01430498-I1. That is not by itself confirmation of activity on site.

    053
  54. Alteration now approved

    The latest status recorded for M01430498-I1 is “Permit Entire.”

    054
  55. Permit recorded for alteration

    DOB lists a first permit date for M01441806-I1. That is not by itself confirmation of activity on site.

    055
  56. Alteration now approved

    The latest status recorded for M01441806-I1 is “Permit Entire.”

    056
  57. Permit recorded for alteration

    DOB lists a first permit date for M01349170-I1. That is not by itself confirmation of activity on site.

    057
  58. Alteration now approved

    The latest status recorded for M01349170-I1 is “Permit Entire.”

    058
  59. Permit recorded for alteration

    DOB lists a first permit date for M01441803-I1. That is not by itself confirmation of activity on site.

    059
  60. Alteration now approved

    The latest status recorded for M01441803-I1 is “Permit Entire.”

    060
  61. Permit recorded for alteration

    DOB lists a first permit date for M01441805-I1. That is not by itself confirmation of activity on site.

    061
  62. Alteration now approved

    The latest status recorded for M01441805-I1 is “Permit Entire.”

    062
  63. Permit recorded for alteration

    DOB lists a first permit date for M01441305-I1. That is not by itself confirmation of activity on site.

    063
  64. Alteration now approved

    The latest status recorded for M01441305-I1 is “Permit Entire.”

    064
  65. Permit recorded for alteration

    DOB lists a first permit date for M01430489-I1. That is not by itself confirmation of activity on site.

    065
  66. Alteration now approved

    The latest status recorded for M01430489-I1 is “Permit Entire.”

    066
  67. Permit recorded for alteration

    DOB lists a first permit date for M01430493-I1. That is not by itself confirmation of activity on site.

    067
  68. Alteration now approved

    The latest status recorded for M01430493-I1 is “Permit Entire.”

    068
  69. Permit recorded for alteration

    DOB lists a first permit date for M01430495-I1. That is not by itself confirmation of activity on site.

    069
  70. Alteration now approved

    The latest status recorded for M01430495-I1 is “Permit Entire.”

    070
  71. Permit recorded for alteration

    DOB lists a first permit date for M01441303-I1. That is not by itself confirmation of activity on site.

    071
  72. Alteration now approved

    The latest status recorded for M01441303-I1 is “Permit Entire.”

    072
  73. Permit recorded for alteration

    DOB lists a first permit date for M01409338-I1. That is not by itself confirmation of activity on site.

    073
  74. Alteration now approved

    The latest status recorded for M01409338-I1 is “Permit Entire.”

    074
  75. Permit recorded for alteration

    DOB lists a first permit date for M01441307-I1. That is not by itself confirmation of activity on site.

    075
  76. Alteration now approved

    The latest status recorded for M01441307-I1 is “Permit Entire.”

    076
  77. Alteration signed off

    DOB recorded a sign-off for M01330264-I1.

    077
  78. Alteration now completed

    The latest status recorded for M01330264-I1 is “LOC Issued.”

    078
  79. Permit recorded for alteration

    DOB lists a first permit date for M01349113-I1. That is not by itself confirmation of activity on site.

    079
  80. Alteration now approved

    The latest status recorded for M01349113-I1 is “Permit Entire.”

    080