Building record · BIN 1016047

452 Fifth Avenue

452 Fifth Avenue, Manhattan, NY 10018

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 23 independently sourced records, including 12 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 1016047

452 Fifth Avenue

Midtown-Times Square, Manhattan

A consolidated public-record view · updated Nov 10, 2026

DOB filings
23
Active-status
12
Recorded addresses
2
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings23
Open or active-status records12
First included filingSep 26, 2025
Latest recorded changeNov 10, 2026

The lot

What is already here?

The lot holds a 29-story office building built in 1902, on a 32,834 sq ft lot.

  1. Floors 2–29Nothing on record
  2. Floor 1Street levelStreet level. The lot is recorded as commercial and office, so this floor is where the commercial space is.
  • Street levelCommercial and office
  • Above the southern skylineFrom about floor 45 — the tallest thing within 60 m to the south is 133.5 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 45.1 m over 29 floors, as the city counts them. 1 run of floors has something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1902
Last altered
2013
Floors
29
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C5-3
Lot area
32,834 sq ft
Building area
616,352 sq ft

The apartments

114 condominium apartments are assessed on this block, and the typical one is 1,329 sq ft (123 m²). They run from 84 to 390 m².

The city values the typical one at $464,753. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.

What it sold for

10 apartments on this tax block changed hands in the year the city last published, at a median of $3,700,000, from 425,000 to 3,999,000.

Recorded sale prices from the Department of Finance’s rolling file, covering the year to Sep 30, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.

Owner of record

40TH STREET TENANTS CORP

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 12, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 44 notices on file; the most recent was issued Sep 29, 2006.

  • Elevator

    Issued Sep 29, 2006

  • Elevator

    Issued Mar 22, 2005

  • Elevator

    Issued Mar 22, 2005

  • 1 further open notice is on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 28, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1016047. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 23 alteration filing. Its latest status categories are 11 approved, 11 recorded as completed, 1 under review. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Sep 26, 2025
Latest recorded change
Nov 10, 2026
Highest proposed story count
29 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 452 Fifth Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 23 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Provide plumbing infrastructure for tenant terrace scope of work, including drains, hose bib services. . No change in use, egress, or occupancy. Filing M01273165-I1.

    01
  2. Alteration approved

    Filing M01273165-I1 reached an approved status.

    02
  3. Alteration filed

    Interior renovations and modifications as per plans filed herewith. No change to use, egress or occupancy. Filing M01261817-I1.

    03
  4. Alteration approved

    Filing M01261817-I1 reached an approved status.

    04
  5. Permit recorded for alteration

    DOB lists a first permit date for M01261817-I1. That is not by itself confirmation of activity on site.

    05
  6. Alteration filed

    Modifications to existing mechanical systems as per plans filed herewith. No change in use, egress, or occupancy. Filing M01261822-I1.

    06
  7. Alteration approved

    Filing M01261822-I1 reached an approved status.

    07
  8. Permit recorded for alteration

    DOB lists a first permit date for M01273165-I1. That is not by itself confirmation of activity on site.

    08
  9. Alteration filed

    Installation of partitions and finishes, HVAC, installations and modifications, plumbing installations, and modifications, sprinkler and standpipe, installations, and modifications to structural, etc. Filing M01283930-I1.

    09
  10. Alteration filed

    Installation of partitions and finishes, HVAC, installations and modifications, plumbing installations, and modifications, sprinkler and standpipe, installations, etc. Filing M01283925-I1.

    010
  11. Alteration filed

    Installation of partitions and finishes, HVAC, installations and modifications, plumbing installations, and modifications, sprinkler and standpipe, installations, and modifications to structural, etc. Filing M01283922-I1.

    011
  12. Alteration filed

    Installation of partitions and finishes, HVAC, installations and modifications, plumbing installations, and modifications, sprinkler and standpipe, installations, and modifications to structural, etc. Filing M01288945-I1.

    012
  13. Alteration filed

    Installation of partitions and finishes, HVAC, installations and modifications, plumbing installations, and modifications, sprinkler and standpipe, installations, and modifications to structural, etc. Filing M01288937-I1.

    013
  14. Alteration approved

    Filing M01283930-I1 reached an approved status.

    014
  15. Alteration filed

    Installation of partitions and finishes, HVAC, installations and modifications, plumbing installations, and modifications, sprinkler and standpipe, installations, etc. Filing M01289005-I1.

    015
  16. Alteration approved

    Filing M01283925-I1 reached an approved status.

    016
  17. Alteration approved

    Filing M01283922-I1 reached an approved status.

    017
  18. Permit recorded for alteration

    DOB lists a first permit date for M01261822-I1. That is not by itself confirmation of activity on site.

    018
  19. Alteration filed

    Installation of partitions and finishes, HVAC, installations and modifications, plumbing installations, and modifications, sprinkler and standpipe, installations, and modifications to structural, etc. Filing M01289029-I1.

    019
  20. Alteration approved

    Filing M01289029-I1 reached an approved status.

    020
  21. Alteration filed

    Installation of partitions and finishes, HVAC, installations and modifications, plumbing installations, and modifications, sprinkler and standpipe, installations, etc. Filing M01289017-I1.

    021
  22. Alteration approved

    Filing M01289017-I1 reached an approved status.

    022
  23. Alteration filed

    Installation of partitions and finishes, HVAC, installations and modifications, plumbing installations, and modifications, sprinkler and standpipe, installations, and modifications to structural, etc. Filing M01288929-I1.

    023
  24. Alteration approved

    Filing M01288929-I1 reached an approved status.

    024
  25. Alteration filed

    Installation of partitions and finishes, HVAC, installations and modifications, plumbing installations, and modifications, sprinkler and standpipe, installations, and modifications to structural, etc. Filing M01289034-I1.

    025
  26. Alteration approved

    Filing M01289034-I1 reached an approved status.

    026
  27. Permit recorded for alteration

    DOB lists a first permit date for M01283930-I1. That is not by itself confirmation of activity on site.

    027
  28. Alteration approved

    Filing M01289005-I1 reached an approved status.

    028
  29. Alteration filed

    Installation of partitions and finishes, HVAC, installations and modifications, plumbing installations, and modifications, sprinkler and standpipe, installations, and modifications to structural, etc. Filing M01288923-I1.

    029
  30. Permit recorded for alteration

    DOB lists a first permit date for M01283925-I1. That is not by itself confirmation of activity on site.

    030
  31. Permit recorded for alteration

    DOB lists a first permit date for M01283922-I1. That is not by itself confirmation of activity on site.

    031
  32. Alteration approved

    Filing M01288945-I1 reached an approved status.

    032
  33. Alteration approved

    Filing M01288937-I1 reached an approved status.

    033
  34. Alteration filed

    Interior demolition on construction Floor 1,2, and Cellar as per plans filed herewith. No change in egress, use or occupancy. Filing M01303754-I1.

    034
  35. Alteration filed

    Mechanical demolition to existing duct/piping and HVAC as per plans filed herewith. No change to use, egress, or occupancy. Filing M01303758-I1.

    035
  36. Permit recorded for alteration

    DOB lists a first permit date for M01289029-I1. That is not by itself confirmation of activity on site.

    036
  37. Permit recorded for alteration

    DOB lists a first permit date for M01289005-I1. That is not by itself confirmation of activity on site.

    037
  38. Alteration filed

    Plumbing/Sprinkler demo and modifications on construction Floor 1, 2, and Cellar as per plans filed herewith. No change to use, egress, or occupancy. Filing M01303761-I1.

    038
  39. Alteration approved

    Filing M01303754-I1 reached an approved status.

    039
  40. Alteration approved

    Filing M01303758-I1 reached an approved status.

    040
  41. Alteration approved

    Filing M01303761-I1 reached an approved status.

    041
  42. Permit recorded for alteration

    DOB lists a first permit date for M01303754-I1. That is not by itself confirmation of activity on site.

    042
  43. Alteration approved

    Filing M01288923-I1 reached an approved status.

    043
  44. Permit recorded for alteration

    DOB lists a first permit date for M01303758-I1. That is not by itself confirmation of activity on site.

    044
  45. Permit recorded for alteration

    DOB lists a first permit date for M01288923-I1. That is not by itself confirmation of activity on site.

    045
  46. Permit recorded for alteration

    DOB lists a first permit date for M01288945-I1. That is not by itself confirmation of activity on site.

    046
  47. Permit recorded for alteration

    DOB lists a first permit date for M01288937-I1. That is not by itself confirmation of activity on site.

    047
  48. Permit recorded for alteration

    DOB lists a first permit date for M01289017-I1. That is not by itself confirmation of activity on site.

    048
  49. Permit recorded for alteration

    DOB lists a first permit date for M01288929-I1. That is not by itself confirmation of activity on site.

    049
  50. Permit recorded for alteration

    DOB lists a first permit date for M01289034-I1. That is not by itself confirmation of activity on site.

    050
  51. Alteration filed

    Modifications to plumbing, sprinkler, and standpipe as per plans filed herewith. No change in use, egress, or occupancy. Filing M01320666-I1.

    051
  52. Alteration approved

    Filing M01320666-I1 reached an approved status.

    052
  53. Permit recorded for alteration

    DOB lists a first permit date for M01303761-I1. That is not by itself confirmation of activity on site.

    053
  54. Permit recorded for alteration

    DOB lists a first permit date for M01320666-I1. That is not by itself confirmation of activity on site.

    054
  55. Alteration filed

    Installation of enclosure system in accordance with nycc 2022 chapter 33 building code. no change in egress, use, or occupancy. Filing M01441900-I1.

    055
  56. Alteration filed

    Plumbing/Sprinkler demo and modifications on construction Floor 1, 2, and Cellar as per plans filed herewith. No change to use, egress, or occupancy. Filing M01303761-P1.

    056
  57. Alteration filed

    Modifications to plumbing, sprinkler, and standpipe as per plans filed herewith. No change in use, egress, or occupancy. Filing M01320666-P1.

    057
  58. Alteration approved

    Filing M01303761-P1 reached an approved status.

    058
  59. Alteration now approved

    The latest status recorded for M01303761-P1 is “Approved.”

    059
  60. Alteration now approved

    The latest status recorded for M01303761-I1 is “Permit Entire.”

    060
  61. Alteration signed off

    DOB recorded a sign-off for M01288945-I1.

    061
  62. Alteration now completed

    The latest status recorded for M01288945-I1 is “LOC Issued.”

    062
  63. Alteration signed off

    DOB recorded a sign-off for M01288937-I1.

    063
  64. Alteration now completed

    The latest status recorded for M01288937-I1 is “LOC Issued.”

    064
  65. Alteration signed off

    DOB recorded a sign-off for M01283922-I1.

    065
  66. Alteration now completed

    The latest status recorded for M01283922-I1 is “LOC Issued.”

    066
  67. Alteration approved

    Filing M01320666-P1 reached an approved status.

    067
  68. Alteration now approved

    The latest status recorded for M01320666-P1 is “Approved.”

    068
  69. Alteration now under review

    The latest status recorded for M01441900-I1 is “Objections.”

    069
  70. Alteration signed off

    DOB recorded a sign-off for M01283930-I1.

    070
  71. Alteration now completed

    The latest status recorded for M01283930-I1 is “LOC Issued.”

    071
  72. Alteration signed off

    DOB recorded a sign-off for M01289005-I1.

    072
  73. Alteration now completed

    The latest status recorded for M01289005-I1 is “LOC Issued.”

    073
  74. Alteration signed off

    DOB recorded a sign-off for M01288923-I1.

    074
  75. Alteration now completed

    The latest status recorded for M01288923-I1 is “LOC Issued.”

    075
  76. Alteration signed off

    DOB recorded a sign-off for M01283925-I1.

    076
  77. Alteration now completed

    The latest status recorded for M01283925-I1 is “LOC Issued.”

    077
  78. Alteration filed

    Filing herewith for fuel oil storage - connection to existing fuel oil supply & return. Mechanical work type (for equipment itself) for relocated generator filed under DOB NOW #M01273133-I1. Total filing fee captured & paid for under initial application. Filing M01273133-S3.

    078
  79. Alteration signed off

    DOB recorded a sign-off for M01273165-I1.

    079
  80. Alteration now completed

    The latest status recorded for M01273165-I1 is “LOC Issued.”

    080
  81. Alteration signed off

    DOB recorded a sign-off for M01289034-I1.

    081
  82. Alteration now completed

    The latest status recorded for M01289034-I1 is “LOC Issued.”

    082
  83. Alteration filed

    Modifications to plumbing, sprinkler, and standpipe as per plans filed herewith. No change in use, egress, or occupancy. Filing M01320666-P2.

    083
  84. Alteration signed off

    DOB recorded a sign-off for M01289017-I1.

    084
  85. Alteration now completed

    The latest status recorded for M01289017-I1 is “LOC Issued.”

    085
  86. Alteration signed off

    DOB recorded a sign-off for M01288929-I1.

    086
  87. Alteration now completed

    The latest status recorded for M01288929-I1 is “LOC Issued.”

    087
  88. Alteration approved

    Filing M01320666-P2 reached an approved status.

    088
  89. Alteration now approved

    The latest status recorded for M01320666-P2 is “Approved.”

    089
  90. Alteration now approved

    The latest status recorded for M01320666-I1 is “Permit Entire.”

    090
  91. Alteration now approved

    The latest status recorded for M01289029-I1 is “Permit Entire.”

    091
  92. Alteration now approved

    The latest status recorded for M01261817-I1 is “Permit Entire.”

    092
  93. Alteration approved

    Filing M01273133-S3 reached an approved status.

    093
  94. Alteration now approved

    The latest status recorded for M01273133-S3 is “Approved.”

    094
  95. Alteration now approved

    The latest status recorded for M01261822-I1 is “Permit Entire.”

    095
  96. Alteration now approved

    The latest status recorded for M01303754-I1 is “Permit Entire.”

    096
  97. Alteration now approved

    The latest status recorded for M01303758-I1 is “Permit Entire.”

    097