DOB filing M01402492-I1
Alteration filing at 90 Park Avenue
Building record · BIN 1017595
90 Park Avenue, Manhattan, NY 10016
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 14 independently sourced records, including 12 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1017595
90 Park Avenue
Midtown-Times Square, Manhattan
A consolidated public-record view · updated Oct 2, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 41-story office building built in 1963, on a 38,019 sq ft lot.
The apartments
348 condominium apartments are assessed on this block, and the typical one is 671 sq ft (62 m²). They run from 47 to 257 m².
The city values the typical one at $231,594. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.
What it sold for
7 apartments on this tax block changed hands in the year the city last published, at a median of $1,100,000, from 400,000 to 21,600,000.
Recorded sale prices from the Department of Finance’s rolling file, covering the year to Aug 31, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.
Owner of record
271 MAD LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 7, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 3 open notices on record for this building, out of 201 notices on file; the most recent was issued May 27, 2010.
Issued May 27, 2010
Issued Dec 6, 2007
Issued Jan 13, 1997
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 6, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1017595. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 14 alteration filing. Its latest status categories are 12 approved, 2 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 90 Park Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 14 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
ICG Capital / Robeco Turnkey - Construction work on the 21st floor as indicated on drawings. Filing M01188802-I1.
Filing M01188802-I1 reached an approved status.
ICG Capital / Robeco Trunkey - Mechanical work on the 21st floor as indicated on drawings. Filing M01188809-I1.
DOB lists a first permit date for M01188802-I1. That is not by itself confirmation of activity on site.
Filing M01188809-I1 reached an approved status.
DOB lists a first permit date for M01188809-I1. That is not by itself confirmation of activity on site.
ICG Capital / Robeco Trunkey - Mechanical work on the 21st floor as indicated on drawings. Filing M01188809-P1.
Non-illuminated non-advertising accessory wall sign - in property lines - bank of america. no change of use, egress or occupancy. Filing M01386861-I1.
DOB lists a first permit date for M01386861-I1. That is not by itself confirmation of activity on site.
Non-illuminated non-advertising accessory wall sign - in property lines - bank of america. no change of use, egress or occupancy. Filing M01386860-I1.
DOB lists a first permit date for M01386860-I1. That is not by itself confirmation of activity on site.
Architectural changes on the 40th floor as indicated on drawings. Filing M01442633-I1.
Plumbing changes on the 40th floor as indicated on drawings. Filing M01442641-I1.
Sprinkler changes on the 40th floor as indicated on drawings. Filing M01442645-I1.
Filing M01442645-I1 reached an approved status.
Mechanical changes on the 40th floor as indicated on drawings. Filing M01442635-I1.
Filing M01442633-I1 reached an approved status.
The latest status recorded for M01442633-I1 is “Approved.”
Filing M01442635-I1 reached an approved status.
ICG Capital / Robeco Turnkey - Construction work on the 21st floor as indicated on drawings. Filing M01188802-P2.
The latest status recorded for M01188802-I1 is “Permit Entire.”
Filing M01188802-P2 reached an approved status.
The latest status recorded for M01188802-P2 is “Approved.”
DOB lists a first permit date for M01442635-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01442635-I1 is “Permit Entire.”
Filing M01442641-I1 reached an approved status.
Filing M01188809-P1 reached an approved status.
The latest status recorded for M01188809-P1 is “Approved.”
The latest status recorded for M01188809-I1 is “Permit Entire.”
DOB lists a first permit date for M01442645-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01442645-I1 is “Permit Entire.”
DOB recorded a sign-off for M01386861-I1.
The latest status recorded for M01386861-I1 is “LOC Issued.”
DOB recorded a sign-off for M01386860-I1.
The latest status recorded for M01386860-I1 is “LOC Issued.”
The Siegfried Group - Sprinkler work on the 25th floor as indicated on drawings. Filing M01402527-I1.
The Sigfried Group - Mechanical work on the 25th floor as indicated on drawings. Filing M01402511-I1.
Filing M01402511-I1 reached an approved status.
The Siegfried Group - Plumbing work on the 25th floor as indicated on drawings. Filing M01402520-I1.
Filing M01402520-I1 reached an approved status.
The latest status recorded for M01402520-I1 is “Approved.”
Filing M01402527-I1 reached an approved status.
DOB lists a first permit date for M01402511-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01402511-I1 is “Permit Entire.”
DOB lists a first permit date for M01402527-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01402527-I1 is “Permit Entire.”
The Siegfried Group - Construction work on the 25th floor as indicated on drawings. Filing M01402492-I1.
DOB lists a first permit date for M01442641-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01442641-I1 is “Permit Entire.”
Filing M01402492-I1 reached an approved status.
DOB lists a first permit date for M01402492-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01402492-I1 is “Permit Entire.”