Building record · BIN 1019905

218 East 29 Street

218 East 29 Street, Manhattan, NY 10016

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 2 independently sourced records, including 2 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 1019905

218 East 29 Street

Murray Hill-Kips Bay, Manhattan

A consolidated public-record view · updated Sep 8, 2026

DOB filings
2
Active-status
2
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings2
Open or active-status records2
First included filingAug 18, 2025
Latest recorded changeSep 8, 2026

The lot

What is already here?

The lot holds a 9-story elevator apartment building built in 1984, with 10 homes, on a 2,469 sq ft lot.

Built
1984
Floors
9
Residential units
10
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R8B
Lot area
2,469 sq ft
Building area
14,575 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 12, 2026. They describe the tax lot, not any single filing.

Violation record

Are there open violations here?

The Department of Buildings has 1 open notice on record for this building, out of 28 notices on file; the most recent was issued Feb 22, 2022.

  • No report and / or late filing (facade)

    Issued Feb 22, 2022 — FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 10, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1019905. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 2 alteration filing. Its latest status categories are 2 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Aug 18, 2025
Latest recorded change
Sep 8, 2026
Highest proposed story count
Not stated
Highest proposed unit count
9 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 218 East 29 Street.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 2 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Installation of roof protection as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application. Filing M01193142-S2.

    01
  2. Alteration filed

    Installation of pipe scaffolding as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use, occupancy or egress under this application. the pipe scaffold top of the sidewalk shed front of the building at east 29th stree. Filing M01193142-S1.

    02
  3. Permit recorded for alteration

    DOB lists a first permit date for M01193142-S1. That is not by itself confirmation of activity on site.

    03
  4. Permit recorded for alteration

    DOB lists a first permit date for M01193142-S2. That is not by itself confirmation of activity on site.

    04
  5. Alteration now approved

    The latest status recorded for M01193142-S1 is “Permit Entire.”

    05
  6. Alteration now approved

    The latest status recorded for M01193142-S2 is “Permit Entire.”

    06