DOB filing M01407902-I1
Alteration filing at 1155 6 Avenue
Building record · BIN 1022631
1155 6 Avenue, Manhattan, NY 10036
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 6 independently sourced records, including 6 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1022631
1155 6 Avenue
Midtown-Times Square, Manhattan
A consolidated public-record view · updated Sep 11, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 40-story office building built in 1984, on a 33,639 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 13, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 21 open notices on record for this building, out of 138 notices on file; the most recent was issued May 27, 2009.
Issued May 27, 2009
Issued May 27, 2009
Issued May 27, 2009
18 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 13, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1022631. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 6 alteration filing. Its latest status categories are 3 under review, 3 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 1155 6 Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 6 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Sprinkler work during interior demolition on 28th marketing floor (27th construction floor). Filing M01414434-I1.
Filing M01414434-I1 reached an approved status.
Plumbing work for LMP on 11th floor. Filing M01421220-I1.
Filing M01421220-I1 reached an approved status.
Sprinkler work during construction for Jenner & Block on 28th marketing floor (27th construction floor). Filing M01432696-I1.
Filing M01432696-I1 reached an approved status.
DOB lists a first permit date for M01432696-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01432696-I1 is “Permit Entire.”
DOB lists a first permit date for M01414434-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01414434-I1 is “Permit Entire.”
DOB lists a first permit date for M01421220-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01421220-I1 is “Permit Entire.”
Ductwork modifications on floor 35 (36 marketing) as per plans filed. No change to use, egress, or occupancy. Filing M01407902-I1.
The latest status recorded for M01407902-I1 is “Pending Prof Cert QA Assignment.”
Tenant renovation including demolition of interior partitions, demountable partitions, and ceilings w/ lighting. Scope also includes construction of new interior partitions + demountable partitions. No change to use, egress, or occupancy. Filing M01407885-I1.
The latest status recorded for M01407885-I1 is “Pending Prof Cert QA Assignment.”
Relocation of existing sprinkler heads to accommodate architectural layout changes as per plans herewith. No change to use, egress, or occupancy. Filing M01407914-I1.
The latest status recorded for M01407914-I1 is “Prof Cert QA Review.”