Building record · BIN 1022678

1211 Avenue of Americas

1211 Avenue of Americas, Manhattan, NY 10036

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 30 independently sourced records, including 26 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 1022678

1211 Avenue of Americas

Midtown-Times Square, Manhattan

A consolidated public-record view · updated Nov 4, 2026

DOB filings
30
Active-status
26
Recorded addresses
3
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings30
Open or active-status records26
First included filingJun 27, 2023
Latest recorded changeNov 4, 2026

The lot

What is already here?

The lot holds a 45-story office building built in 1973, on a 84,855 sq ft lot.

  1. Floors 2–45Nothing on record
  2. Floor 1Street levelStreet level. The lot is recorded as commercial and office, so this floor is where the commercial space is.
  • Street levelCommercial and office
  • Above the southern skylineFrom about floor 56 — the tallest thing within 60 m to the south is 167.8 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 181.8 m over 45 floors, as the city counts them. 1 run of floors has something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1973
Last altered
2016
Floors
45
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C6-5.5
Lot area
84,855 sq ft
Building area
1,984,228 sq ft

What it sold for

1 apartment on this tax block changed hands in the year the city last published, at a median of $5,988,052.

Recorded sale prices from the Department of Finance’s rolling file, covering the year to Sep 30, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.

Owner of record

20 TSQ GROUNDCO LLC

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 6, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 1 open notice on record for this building, out of 304 notices on file; the most recent was issued Jul 7, 2003.

  • Elevator

    Issued Jul 7, 2003

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 31, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1022678. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 30 alteration filing. Its latest status categories are 26 approved, 4 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Jun 27, 2023
Latest recorded change
Nov 4, 2026
Highest proposed story count
46 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 1211 Avenue of Americas.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 30 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Modificatoins to existing plumbing/sprinkler fixtures as per plans filed herewith. Filing M00866318-I1.

    01
  2. Alteration approved

    Filing M00866318-I1 reached an approved status.

    02
  3. Permit recorded for alteration

    DOB lists a first permit date for M00866318-I1. That is not by itself confirmation of activity on site.

    03
  4. Alteration filed

    Additions/modifications to existing plumbing/sprinkler fixtures as per plans filed herewith. Filing M00882633-I1.

    04
  5. Alteration approved

    Filing M00882633-I1 reached an approved status.

    05
  6. Permit recorded for alteration

    DOB lists a first permit date for M00882633-I1. That is not by itself confirmation of activity on site.

    06
  7. Alteration filed

    Modification of the existing sprinkler system as per the filed drawings. No change to use, occupancy or egress. Filing M00912486-I1.

    07
  8. Alteration approved

    Filing M00912486-I1 reached an approved status.

    08
  9. Permit recorded for alteration

    DOB lists a first permit date for M00912486-I1. That is not by itself confirmation of activity on site.

    09
  10. Alteration filed

    Removal of non-bearing partitions and related finishes as per drawings filed herewith. no change in use, egress or occupancy. Filing M01132563-I1.

    010
  11. Alteration approved

    Filing M01132563-I1 reached an approved status.

    011
  12. Permit recorded for alteration

    DOB lists a first permit date for M01132563-I1. That is not by itself confirmation of activity on site.

    012
  13. Alteration filed

    Removal and installation of interior non-bearing partitions and related finishes as per drawings filed herewith. no change of use, egress, or occupancy. Filing M01147527-I1.

    013
  14. Alteration filed

    Plumbing demolition as per plans filed herewith. No change in use, egress, or occupancy. Filing M01133567-I1.

    014
  15. Alteration approved

    Filing M01133567-I1 reached an approved status.

    015
  16. Alteration approved

    Filing M01147527-I1 reached an approved status.

    016
  17. Permit recorded for alteration

    DOB lists a first permit date for M01133567-I1. That is not by itself confirmation of activity on site.

    017
  18. Permit recorded for alteration

    DOB lists a first permit date for M01147527-I1. That is not by itself confirmation of activity on site.

    018
  19. Alteration filed

    Installation of interior non-bearing partitions and related finishes as per drawings filed herwith. no change in use, egress or occupancy. Filing M01205486-I1.

    019
  20. Alteration approved

    Filing M01205486-I1 reached an approved status.

    020
  21. Permit recorded for alteration

    DOB lists a first permit date for M01205486-I1. That is not by itself confirmation of activity on site.

    021
  22. Alteration filed

    Sprinkler head removals and new installation as per plans filed herewith. No change to use, egress, or occupancy. Filing M01270114-I1.

    022
  23. Alteration approved

    Filing M01270114-I1 reached an approved status.

    023
  24. Permit recorded for alteration

    DOB lists a first permit date for M01270114-I1. That is not by itself confirmation of activity on site.

    024
  25. Alteration filed

    Installation of interior non-bearing partitions and related finishes as per drawings filed herewith. no change in use, egress or occupancy. Filing M01297464-I1.

    025
  26. Alteration approved

    Filing M01297464-I1 reached an approved status.

    026
  27. Permit recorded for alteration

    DOB lists a first permit date for M01297464-I1. That is not by itself confirmation of activity on site.

    027
  28. Alteration filed

    Installation of a temporary sprinkler loop as per the filed drawings. No change to use, occupancy or egress. Filing M01331024-I1.

    028
  29. Alteration approved

    Filing M01331024-I1 reached an approved status.

    029
  30. Permit recorded for alteration

    DOB lists a first permit date for M01331024-I1. That is not by itself confirmation of activity on site.

    030
  31. Alteration filed

    Installation of temporary construction fence and sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. Filing M01364960-I1.

    031
  32. Permit recorded for alteration

    DOB lists a first permit date for M01364960-I1. That is not by itself confirmation of activity on site.

    032
  33. Alteration filed

    Demolition, relocation, and addition of sprinkler fixtures as per plans filed herewith. No change to use, egress, or occupancy. Filing M01411704-I1.

    033
  34. Alteration filed

    Interior renovation / modifications and demolition as per plans filed herewith. No change to use, egress, or occupancy. Filing M01411669-I1.

    034
  35. Alteration filed

    Plumbing demolition with additions and modifications to existing plumbing fixtures as per plans filed herewith. No change to use, egress, or occupancy. Filing M01411699-I1.

    035
  36. Alteration approved

    Filing M01411699-I1 reached an approved status.

    036
  37. Alteration approved

    Filing M01411704-I1 reached an approved status.

    037
  38. Alteration approved

    Filing M01411669-I1 reached an approved status.

    038
  39. Alteration filed

    Plumbing and sprinkler additions and modifications as per plans filed herewith. No change in use, egress, or occupancy. Filing M01426539-I1.

    039
  40. Alteration filed

    Modifications to existing HVAC and ductwork as per plans filed herewith. No change to use, egress, or occupancy. Filing M01426527-I1.

    040
  41. Alteration filed

    Installation of interior non-bearing partitions and related finishes as per drawings filed herewith. No change to use, egress or occupancy. Filing M01426507-I1.

    041
  42. Alteration approved

    Filing M01426507-I1 reached an approved status.

    042
  43. Alteration approved

    Filing M01426539-I1 reached an approved status.

    043
  44. Alteration approved

    Filing M01426527-I1 reached an approved status.

    044
  45. Alteration filed

    Interior renovation / modifications and demolition as per plans filed herewith. No change to use, egress, or occupancy. Filing M01411669-P1.

    045
  46. Permit recorded for alteration

    DOB lists a first permit date for M01426507-I1. That is not by itself confirmation of activity on site.

    046
  47. Alteration filed

    Removal and installation of interior non-bearing partitions and related finishes as per drawings filed herewith. no change of use, egress, or occupancy. Filing M01147527-P1.

    047
  48. Alteration filed

    Installation of interior non-bearing partitions and related finishes as per drawings filed herewith. no change in use, egress or occupancy. Filing M01297464-P1.

    048
  49. Alteration now approved

    The latest status recorded for M01205486-I1 is “Permit Entire.”

    049
  50. Alteration filed

    Installation of interior non-bearing partitions and related finishes as per drawings filed herwith. no change in use, egress or occupancy. Filing M01205486-P2.

    050
  51. Alteration approved

    Filing M01205486-P2 reached an approved status.

    051
  52. Alteration now approved

    The latest status recorded for M01205486-P2 is “Approved.”

    052
  53. Alteration now approved

    The latest status recorded for M01297464-I1 is “Permit Entire.”

    053
  54. Alteration approved

    Filing M01297464-P1 reached an approved status.

    054
  55. Alteration now approved

    The latest status recorded for M01297464-P1 is “Approved.”

    055
  56. Alteration now approved

    The latest status recorded for M01132563-I1 is “Permit Entire.”

    056
  57. Alteration now approved

    The latest status recorded for M01147527-I1 is “Permit Entire.”

    057
  58. Alteration approved

    Filing M01147527-P1 reached an approved status.

    058
  59. Alteration now approved

    The latest status recorded for M01147527-P1 is “Approved.”

    059
  60. Alteration approved

    Filing M01411669-P1 reached an approved status.

    060
  61. Alteration now approved

    The latest status recorded for M01411669-P1 is “Approved.”

    061
  62. Permit recorded for alteration

    DOB lists a first permit date for M01411669-I1. That is not by itself confirmation of activity on site.

    062
  63. Alteration now approved

    The latest status recorded for M01411669-I1 is “Permit Entire.”

    063
  64. Permit recorded for alteration

    DOB lists a first permit date for M01411699-I1. That is not by itself confirmation of activity on site.

    064
  65. Alteration now approved

    The latest status recorded for M01411699-I1 is “Permit Entire.”

    065
  66. Alteration now approved

    The latest status recorded for M01364960-I1 is “Permit Entire.”

    066
  67. Permit recorded for alteration

    DOB lists a first permit date for M01426539-I1. That is not by itself confirmation of activity on site.

    067
  68. Permit recorded for alteration

    DOB lists a first permit date for M01411704-I1. That is not by itself confirmation of activity on site.

    068
  69. Alteration now approved

    The latest status recorded for M01411704-I1 is “Permit Entire.”

    069
  70. Alteration now approved

    The latest status recorded for M00912486-I1 is “Permit Entire.”

    070
  71. Permit recorded for alteration

    DOB lists a first permit date for M01426527-I1. That is not by itself confirmation of activity on site.

    071
  72. Alteration now approved

    The latest status recorded for M01426527-I1 is “Permit Entire.”

    072
  73. Alteration signed off

    DOB recorded a sign-off for M01133567-I1.

    073
  74. Alteration now completed

    The latest status recorded for M01133567-I1 is “LOC Issued.”

    074
  75. Alteration signed off

    DOB recorded a sign-off for M01331024-I1.

    075
  76. Alteration now completed

    The latest status recorded for M01331024-I1 is “LOC Issued.”

    076
  77. Alteration signed off

    DOB recorded a sign-off for M00866318-I1.

    077
  78. Alteration now completed

    The latest status recorded for M00866318-I1 is “LOC Issued.”

    078
  79. Alteration signed off

    DOB recorded a sign-off for M01270114-I1.

    079
  80. Alteration now completed

    The latest status recorded for M01270114-I1 is “LOC Issued.”

    080
  81. Alteration filed

    Plumbing modifications on 22nd floor as per plans filed herewith. No changes in use, egress or occupancy. Filing M01445322-I1.

    081
  82. Alteration filed

    Sprinkler demo and modifications on floors 22nd floor and installation of temp loop as per plans filed herewith. No changes in use, egress or occupancy. Filing M01445336-I1.

    082
  83. Alteration approved

    Filing M01445336-I1 reached an approved status.

    083
  84. Alteration filed

    Mechanical modifications on 22nd floor as per plans filed herewith. No changes in use, egress or occupancy. Filing M01445312-I1.

    084
  85. Alteration filed

    General construction on floors 22nd floor as per plans filed herewith. No changes in egress, use or occupancy. Filing M01445306-I1.

    085
  86. Alteration approved

    Filing M01445306-I1 reached an approved status.

    086
  87. Alteration approved

    Filing M01445322-I1 reached an approved status.

    087
  88. Alteration approved

    Filing M01445312-I1 reached an approved status.

    088
  89. Permit recorded for alteration

    DOB lists a first permit date for M01445306-I1. That is not by itself confirmation of activity on site.

    089
  90. Alteration now approved

    The latest status recorded for M01445306-I1 is “Permit Entire.”

    090
  91. Alteration now approved

    The latest status recorded for M01426539-I1 is “Permit Entire.”

    091
  92. Alteration filed

    Installation of steel pipe scaffold in shaftway as per plans. no change in egress, use, or occupancy. Filing M01463819-I1.

    092
  93. Permit recorded for alteration

    DOB lists a first permit date for M01445312-I1. That is not by itself confirmation of activity on site.

    093
  94. Alteration now approved

    The latest status recorded for M01445312-I1 is “Permit Entire.”

    094
  95. Alteration now approved

    The latest status recorded for M01426507-I1 is “Permit Entire.”

    095
  96. Permit recorded for alteration

    DOB lists a first permit date for M01463819-I1. That is not by itself confirmation of activity on site.

    096
  97. Alteration now approved

    The latest status recorded for M01463819-I1 is “Permit Entire.”

    097
  98. Alteration filed

    Interior renovation / modifications and demolition as per plans filed herewith. No change to use, egress, or occupancy. Filing M01460820-I1.

    098
  99. Alteration filed

    Sprinkler additions and modifications as per plans filed herewith. No change in use, egress, or occupancy. Filing M01460844-I1.

    099
  100. Alteration filed

    Modifications to existing ductwork and piping as per plans filed herewith. No change to use, egress, or occupancy. Filing M01460838-I1.

    0100
  101. Alteration approved

    Filing M01460838-I1 reached an approved status.

    0101
  102. Alteration filed

    Mechanical modifications on 18th floor as per plans filed herewith. No changes in use, egress or occupancy. Filing M01458530-I1.

    0102
  103. Alteration approved

    Filing M01460820-I1 reached an approved status.

    0103
  104. Alteration approved

    Filing M01460844-I1 reached an approved status.

    0104
  105. Permit recorded for alteration

    DOB lists a first permit date for M01460844-I1. That is not by itself confirmation of activity on site.

    0105
  106. Alteration now approved

    The latest status recorded for M01460844-I1 is “Permit Entire.”

    0106
  107. Permit recorded for alteration

    DOB lists a first permit date for M01460838-I1. That is not by itself confirmation of activity on site.

    0107
  108. Alteration now approved

    The latest status recorded for M01460838-I1 is “Permit Entire.”

    0108
  109. Permit recorded for alteration

    DOB lists a first permit date for M01460820-I1. That is not by itself confirmation of activity on site.

    0109
  110. Alteration now approved

    The latest status recorded for M01460820-I1 is “Permit Entire.”

    0110
  111. Alteration approved

    Filing M01458530-I1 reached an approved status.

    0111
  112. Permit recorded for alteration

    DOB lists a first permit date for M01458530-I1. That is not by itself confirmation of activity on site.

    0112
  113. Alteration now approved

    The latest status recorded for M01458530-I1 is “Permit Entire.”

    0113
  114. Permit recorded for alteration

    DOB lists a first permit date for M01445322-I1. That is not by itself confirmation of activity on site.

    0114
  115. Alteration now approved

    The latest status recorded for M01445322-I1 is “Permit Entire.”

    0115
  116. Permit recorded for alteration

    DOB lists a first permit date for M01445336-I1. That is not by itself confirmation of activity on site.

    0116
  117. Alteration now approved

    The latest status recorded for M01445336-I1 is “Permit Entire.”

    0117
  118. Alteration now approved

    The latest status recorded for M00882633-I1 is “Permit Entire.”

    0118