DOB filing M01473588-S1
Alteration filing at 787 Seventh Avenue
Building record · BIN 1023157
787 Seventh Avenue, Manhattan, NY 10019
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 22 independently sourced records, including 20 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1023157
787 Seventh Avenue
Midtown-Times Square, Manhattan
A consolidated public-record view · updated Nov 11, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 51-story office building built in 1985, on a 80,333 sq ft lot.
Owner of record
FSP 787 SEVENTH, LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 13, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 3 open notices on record for this building, out of 186 notices on file; the most recent was issued May 3, 2005.
Issued May 3, 2005
Issued Dec 18, 2001 — 1P33053
Issued Jan 27, 1999 — 1F5514
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 13, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1023157. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 22 alteration filing. Its latest status categories are 18 approved, 2 under review, 2 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 787 Seventh Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 22 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Install (97) new sprinkler heads on the 35th Floor and (5) news head on 34th Floor and associated sprinkler piping as per plans (Willkie Farr & Gallagher - Phase 1.) No change to use, egress or occupancy. Filing M01209802-I1.
Filing M01209802-I1 reached an approved status.
Modifications to the existing Sprinkler System: Install (125) new sprinkler heads and associated piping on the 5th Floor as per plans (Stifel/ North Floor Buildout.) No change to use, egress or occupancy. Filing M01246989-I1.
Install New Fixtures: (2) HWH, (2) WD, (4) CM, (3) IM, (2) DW, (2) refrigerator, (4) sinks, (1) sump pump, (2) Funnel drains on 5; and Install (1) grease interceptor on 4 and associated CW/sanitary piping as per plans (Stifel/ North Floor Buildout.). Filing M01246968-I1.
Filing M01246989-I1 reached an approved status.
Filing M01246968-I1 reached an approved status.
DOB lists a first permit date for M01209802-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01246989-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01246968-I1. That is not by itself confirmation of activity on site.
Modifications to the existing Sprinkler System: Install (2) new sprinkler heads and associated piping each on the 2nd Floor as per plans (BNP/ Huddle Room.) No change to use, egress or occupancy. Filing M01412874-I1.
Minor interior demo. Installation of new interior partitions, suspended ceiling, millwork, flooring and finishes on the 2nd Floor as per plans (BNPP - Huddle Rooms.) No change to use, egress or occupancy. Filing M01411752-I1.
Modifications to the existing HVAC System: Installation of ductwork, insulations, air outlets, controls, control wiring & accessories on the 2nd Floor as per plans (BNP/ Huddle Rooms.) No change to use, egress or occupancy. Filing M01412865-I1.
Filing M01412874-I1 reached an approved status.
Filing M01411752-I1 reached an approved status.
Filing M01412865-I1 reached an approved status.
DOB lists a first permit date for M01411752-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01412865-I1. That is not by itself confirmation of activity on site.
Modifications to the existing HVAC System: demolition and disconnections of HVAC equipment and ductwork on the 48th Floor as per plans (Sidley NYC/ Demo Phase.) No change to use, egress or occupancy. Filing M01442299-I1.
Modifications to the existing Sprinkler System: Remove existing Sprinkler heads and Install (15) new temporary sprinkler heads and associated piping for temp loop on the 48th Floor as per plans (Sidley NYC - Demo Phase.). Filing M01442357-I1.
Disconnect & removal all existing fixtures and related piping in existing Core Toilets and Pantries and cap back to the riser on the 48th Floor as per plans (Sidley NYC/ Demo Phase. ) No change to use, egress or occupancy. Filing M01442315-I1.
The latest status recorded for M01411752-I1 is “Permit Entire.”
The latest status recorded for M01412865-I1 is “Permit Entire.”
DOB lists a first permit date for M01412874-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01412874-I1 is “Permit Entire.”
Miscellaneous Demolition and removal of interior non bearing partitions and related finishes on the 48th Floor as per plans (Sidley Austin - Demo Phase.) No change to use, egress or occupancy. Filing M01442274-I1.
Filing M01442274-I1 reached an approved status.
Filing M01442299-I1 reached an approved status.
Filing M01442357-I1 reached an approved status.
The latest status recorded for M01442357-I1 is “Approved.”
Filing M01442315-I1 reached an approved status.
The latest status recorded for M01442315-I1 is “Approved.”
Modifications to the existing Sprinkler System: Remove (108) existing heads, Install (97) new sprinkler heads, (16) temporary core heads and associated piping on the 4th Floor as per plans (BNP/ Asset Mgmt.) No change to use, egress or occupancy. Filing M01448456-I1.
Install Plumbing fixtures for New bathrooms, pantry and wellness room and associated CW/sanitary piping on the 4th Floor as per plans (BNP Paribas Annex.) No change to use, egress or occupancy. Filing M01448427-I1.
Minor demolition. Installation of new partitions, floor finishes and suspended ceilings on the 4th Floor as per plans (BNP Asset Mgmt - Annex.) No change to use, egress or occupancy. Filing M01448340-I1.
Modifications to the existing HVAC System: demolition and disconnections of HVAC equipment and ductwork on the 4th Floor as per plans (BNP Paribas Asset Management.) No change to use, egress or occupancy. Filing M01448418-I1.
Filing M01448456-I1 reached an approved status.
Filing M01448427-I1 reached an approved status.
Filing M01448340-I1 reached an approved status.
Filing M01448418-I1 reached an approved status.
DOB recorded a sign-off for M01246989-I1.
The latest status recorded for M01246989-I1 is “LOC Issued.”
DOB recorded a sign-off for M01246968-I1.
The latest status recorded for M01246968-I1 is “LOC Issued.”
DOB lists a first permit date for M01448340-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01448340-I1 is “Permit Entire.”
DOB lists a first permit date for M01448418-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01448418-I1 is “Permit Entire.”
DOB lists a first permit date for M01448427-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01448427-I1 is “Permit Entire.”
DOB lists a first permit date for M01448456-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01448456-I1 is “Permit Entire.”
The latest status recorded for M01209802-I1 is “Permit Entire.”
Install (97) new sprinkler heads on the 35th Floor and (5) news head on 34th Floor and associated sprinkler piping as per plans (Willkie Farr & Gallagher - Phase 1.) No change to use, egress or occupancy. Filing M01209802-P1.
Filing M01209802-P1 reached an approved status.
The latest status recorded for M01209802-P1 is “Approved.”
DOB lists a first permit date for M01442299-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01442274-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01442299-I1 is “Permit Entire.”
The latest status recorded for M01442274-I1 is “Permit Entire.”
Removal of plumbing fixtures and associated CW/sanitary piping on the 32nd Floor as per plans (Holland & Knight - Demo Phase.) No change to use, egress or occupancy. Filing M01473960-I1.
Minor Demolition; Removal of interior partitions, doors, finishes and suspended ceilings on the 32nd Floors as per plans (Holland & Knight - Demo Phase.) No change to use, egress or occupancy. Filing M01473588-I1.
Modifications to the existing HVAC System: Remove ductwork, piping, VAVs, HVAC equipment, controls, air outlets on the 32nd Floor as per plans (Holland & Knight - Demo Phase.) No change to use, egress or occupancy. Filing M01473943-I1.
Modifications to the existing Sprinkler System: Remove (388) existing sprinkler heads and install (44) new sprinkler heads and associated piping on the 32nd Floor as per plans (Holland & Knight - Demo Phase.) No change to use, egress or occupancy. Filing M01474038-I1.
Filing M01473960-I1 reached an approved status.
Filing M01474038-I1 reached an approved status.
Interior renovation of existing eating and drinking establishment for Pita Yeero, including selective demolition, installation of counters and kitch equipment, and assoc. interior finish work. Ex lighting to remain. No change in use, egress or occupancy. Filing M01483525-I1.
Filing M01473588-I1 reached an approved status.
Filing M01473943-I1 reached an approved status.
DOB lists a first permit date for M01474038-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01474038-I1 is “Permit Entire.”
Installation of new handwash sink in existing rough-in. New dishwasher and grease interceptor connected to existing sanitary. Filing M01483525-S1.
DOB lists a first permit date for M01473588-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01473588-I1 is “Permit Entire.”
DOB lists a first permit date for M01473943-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01473943-I1 is “Permit Entire.”
Structural Modifications: Removal of composite deck, concrete slab, stair stringers and hanger posts on the 32nd & 33rd Floor as per plans (Holland & Knight - Demo Phase.) No change to use, egress or occupancy. Filing M01473588-S1.
The latest status recorded for M01483525-S1 is “Plan Examiner Review.”
The latest status recorded for M01483525-I1 is “Plan Examiner Review.”
Filing M01473588-S1 reached an approved status.
The latest status recorded for M01473960-I1 is “Approved.”
The latest status recorded for M01473588-S1 is “Approved.”