DOB filing M01461956-I1
Alteration filing at 1301 Avenue of the Americas
Building record · BIN 1023161
1301 Avenue of the Americas, Manhattan, NY 10019
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 23 independently sourced records, including 16 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1023161
1301 Avenue of the Americas
Midtown-Times Square, Manhattan
A consolidated public-record view · updated Oct 27, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 46-story office building built in 1965, on a 74,631 sq ft lot.
The apartments
218 condominium apartments are assessed on this block, and the typical one is 1,372 sq ft (127 m²). They run from 48 to 479 m².
The city values the typical one at $559,709. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.
Owner of record
NYC TRANSIT
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 29, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 8 open notices on record for this building, out of 248 notices on file; the most recent was issued Aug 20, 2004.
Issued Aug 20, 2004
Issued Aug 20, 2004
Issued Oct 21, 2002
5 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 29, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1023161. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 23 alteration filing. Its latest status categories are 16 approved, 7 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 1301 Avenue of the Americas.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 23 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Install gas appliances/plumbing fixtures/related piping (cold water, hot water, vent sanitary & gas). Install steam fired domestic WH. Remove & replace existing duplex sewage ejector. Remove, Relocate, install New SP heads. Filing M00854009-I1.
Filing M00854009-I1 reached an approved status.
DOB lists a first permit date for M00854009-I1. That is not by itself confirmation of activity on site.
Removing a small portion of the existing Cellar Level structural framing and escalator pit, such that we can fit a slightly longer escalator on the First Floor & Cellar Level escalator opening & supports to accommodate replacement. Filing M00967764-I1.
Filing M00967764-I1 reached an approved status.
Modification to existing plumbing & sprinkler systems. No change in use, egress or occupancy. Filing M01103103-I1.
Filing M01103103-I1 reached an approved status.
Mechanical work in conjunction with tenant fit-out. Filing M01119360-I1.
New sprinkler heads and plumbing fixtures. Filing M01119374-I1.
Filing M01119360-I1 reached an approved status.
Filing M01119374-I1 reached an approved status.
DOB lists a first permit date for M01103103-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01119360-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01119374-I1. That is not by itself confirmation of activity on site.
New interior office renovation includes new perimeter offices, conference rooms, and reception area. Filing M01254923-I1.
Filing M01254923-I1 reached an approved status.
DOB lists a first permit date for M01254923-I1. That is not by itself confirmation of activity on site.
Furnish and install sprinkler main, branches and sprinkler heads. Connect to existing floor control assembly. Furnish and install new plumbing fixtures and related piping. Filing M01254940-I1.
Full floor design of existing base building units and the additions of 1 set of pumps, (3) fans and 1 CRAC units. New and relocated induction units will be installed to accommodate for new office layout. Filing M01254931-I1.
Filing M01254940-I1 reached an approved status.
Filing M01254931-I1 reached an approved status.
DOB lists a first permit date for M01254940-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01254931-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M00967764-I1. That is not by itself confirmation of activity on site.
Interior demolition of non-loadbearing partitions, millwork, ceilings, finishes, lighting, doors/frames/hardware. Filing M01294517-I1.
Filing M01294517-I1 reached an approved status.
DOB lists a first permit date for M01294517-I1. That is not by itself confirmation of activity on site.
Minor demolition with installation of new partitions on the 39th and 40th floors as per plans. No change to Use, Egress or Occupancy. Filing M01314808-I1.
Filing M01314808-I1 reached an approved status.
DOB lists a first permit date for M01314808-I1. That is not by itself confirmation of activity on site.
Modifications to the existing plumbing system on the 3rd and 4th floors (Piper Sandler) as per plans. No change to use, egress or occupancy. Filing M01416867-I1.
Filing M01416867-I1 reached an approved status.
DOB lists a first permit date for M01416867-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for M01119360-I1.
The latest status recorded for M01119360-I1 is “LOC Issued.”
DOB recorded a sign-off for M01119374-I1.
The latest status recorded for M01119374-I1 is “LOC Issued.”
The latest status recorded for M01103103-I1 is “Permit Entire.”
Minor demolition with installation of new partitions on the 39th and 40th floors as per plans. No change to Use, Egress or Occupancy. Filing M01314808-P2.
DOB recorded a sign-off for M00967764-I1.
The latest status recorded for M00967764-I1 is “LOC Issued.”
DOB recorded a sign-off for M01294517-I1.
The latest status recorded for M01294517-I1 is “LOC Issued.”
Modifications to the existing plumbing system on the 3rd and 4th floors (Piper Sandler) as per plans. No change to use, egress or occupancy. Filing M01416867-P1.
Filing M01416867-P1 reached an approved status.
The latest status recorded for M01416867-P1 is “Approved.”
Furnish and install sprinkler main, branches and sprinkler heads. Connect to existing floor control assembly. Furnish and install new plumbing fixtures and related piping. Filing M01254940-P2.
Filing M01314808-P2 reached an approved status.
The latest status recorded for M01314808-P2 is “Approved.”
The latest status recorded for M01314808-I1 is “Permit Entire.”
Filing M01254940-P2 reached an approved status.
The latest status recorded for M01254940-P2 is “Approved.”
DOB recorded a sign-off for M01254940-I1.
The latest status recorded for M01254940-I1 is “LOC Issued.”
DOB recorded a sign-off for M01254931-I1.
The latest status recorded for M01254931-I1 is “LOC Issued.”
Minor demolition with installation of new partitions on the 5th Floor (Leerink) as per plans. No change to Use, Egress or Occupancy. Filing M01461917-I1.
Modifications to the existing HVAC system on the the 32nd floor (McKool Smith) as per plans. No changes to Use, Egress, or occupancy. Filing M01449096-I1.
Modifications to the existing plumbing system on the 32nd floor (McKool Smith) as per plans. No change to use, egress or occupancy. Filing M01449103-I1.
Modifications to the existing sprinkler system on the 32th floor as per plans. No change to use, egress or occupancy. Filing M01449100-I1.
Minor demolition with installation of new partitions on the 32nd Floor (McKool Smith) as per plans. No change to Use, Egress or Occupancy. Filing M01449088-I1.
Modifications to the existing plumbing system on the 3rd and 4th floors (Piper Sandler) as per plans. No change to use, egress or occupancy. Filing M01416867-P2.
Filing M01449096-I1 reached an approved status.
Filing M01449103-I1 reached an approved status.
The latest status recorded for M01449103-I1 is “Approved.”
Filing M01449100-I1 reached an approved status.
The latest status recorded for M01449100-I1 is “Approved.”
Filing M01449088-I1 reached an approved status.
Filing M01416867-P2 reached an approved status.
The latest status recorded for M01416867-P2 is “Approved.”
The latest status recorded for M01416867-I1 is “Permit Entire.”
DOB recorded a sign-off for M01254923-I1.
The latest status recorded for M01254923-I1 is “LOC Issued.”
Modifications to the existing sprinkler system on the 5th floor as per plans. No change to use, egress or occupancy. Filing M01461956-I1.
Modifications to the existing HVAC system on the the 5th floor as per plans. No changes to Use, Egress, or occupancy. Filing M01462268-I1.
Install gas appliances/plumbing fixtures/related piping (cold water, hot water, vent sanitary & gas). Install steam fired domestic WH. Remove & replace existing duplex sewage ejector. Remove, Relocate, install New SP heads. Filing M00854009-P5.
DOB lists a first permit date for M01449096-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01449096-I1 is “Permit Entire.”
Filing M01461956-I1 reached an approved status.
DOB lists a first permit date for M01449088-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01449088-I1 is “Permit Entire.”
Filing M00854009-P5 reached an approved status.
The latest status recorded for M00854009-P5 is “Approved.”
The latest status recorded for M00854009-I1 is “Permit Entire.”
Filing M01461917-I1 reached an approved status.
Filing M01462268-I1 reached an approved status.
DOB lists a first permit date for M01461917-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01461917-I1 is “Permit Entire.”
DOB lists a first permit date for M01462268-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01462268-I1 is “Permit Entire.”
DOB lists a first permit date for M01461956-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01461956-I1 is “Permit Entire.”