DOB filing M01425455-P1
Alteration filing at 750 Seventh Avenue
Building record · BIN 1024795
750 Seventh Avenue, Manhattan, NY 10019
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 8 independently sourced records, including 7 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1024795
750 Seventh Avenue
Midtown-Times Square, Manhattan
A consolidated public-record view · updated Sep 25, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 34-story office building built in 1988, on a 22,015 sq ft lot.
What it sold for
5 apartments on this tax block changed hands in the year the city last published, at a median of $6,750,000, from 5,945,589 to 12,200,000.
Recorded sale prices from the Department of Finance’s rolling file, covering the year to Aug 31, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.
Owner of record
750 SEVENTH AVE NY LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 30, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 6 open notices on record for this building, out of 107 notices on file; the most recent was issued Jul 15, 2024.
Issued Jul 15, 2024 — EMERGENCY WORK ORDER DUE TO CRACKS OBSERVED AT TIME OF INSPECTION AT E XPOSURE 2 WEST ELEVATION.REMEDY:IMMEDIATELY PROVIDE AND TAKE SAFETY ME ASURES TO SECURE AND PROTECT THE PUBLIC AND INSTALL PUBLIC PROTECTION AT ALL EXPOSURES.IMMEDIATELY REPAIR/REPLACE CRACKED WINDOW
Issued Feb 22, 2024 — FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
Issued Apr 29, 2013
3 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 29, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1024795. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 8 alteration filing. Its latest status categories are 7 approved, 1 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 750 Seventh Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 8 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Erect wall sign structure on wall. Sign filed under job# M01190682. (@ 49 St) No change of use, egress or occupancy. Filing M01190682-I1.
Filing M01190682-I1 reached an approved status.
DOB lists a first permit date for M01190682-I1. That is not by itself confirmation of activity on site.
Addition and modifications to existing HVAC system and related ducts and piping. No change in use, egress or occupancy. Filing M01425455-I1.
Interior renovation of existing office, includes new non load bearing partitions, finishes, lighting, electrical. Filing M01425252-I1.
Filing M01425252-I1 reached an approved status.
Additions/ Modification to existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application. Filing M01425473-I1.
Filing M01425455-I1 reached an approved status.
DOB lists a first permit date for M01425455-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01425252-I1. That is not by itself confirmation of activity on site.
Filing M01425473-I1 reached an approved status.
DOB lists a first permit date for M01425473-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for M01190682-I1.
The latest status recorded for M01190682-I1 is “LOC Issued.”
Plumbing modifications on the 18th floor -New instantaneous water heater new water closet, lavatory, and floor drain and piping modifications. Filing M01458870-I1.
Addition and modifications to existing HVAC system and related ducts and piping. No change in use, egress or occupancy. Filing M01425455-P1.
Interior renovation of existing office, includes new non load bearing partitions, finishes, lighting, electrical. Filing M01425252-P1.
The latest status recorded for M01425473-I1 is “Permit Entire.”
Additions/ Modification to existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application. Filing M01425473-P1.
Filing M01425473-P1 reached an approved status.
The latest status recorded for M01425473-P1 is “Approved.”
Filing M01458870-I1 reached an approved status.
DOB lists a first permit date for M01458870-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01458870-I1 is “Permit Entire.”
Filing M01425252-P1 reached an approved status.
The latest status recorded for M01425252-P1 is “Approved.”
The latest status recorded for M01425252-I1 is “Permit Entire.”
Filing M01425455-P1 reached an approved status.
The latest status recorded for M01425455-P1 is “Approved.”
The latest status recorded for M01425455-I1 is “Permit Entire.”