Building record · BIN 1024828

810 Seventh Avenue

810 Seventh Avenue, Manhattan, NY 10019

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 20 independently sourced records, including 14 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 1024828

810 Seventh Avenue

Midtown-Times Square, Manhattan

A consolidated public-record view · updated Oct 28, 2026

DOB filings
20
Active-status
14
Recorded addresses
2
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings20
Open or active-status records14
First included filingFeb 10, 2025
Latest recorded changeOct 28, 2026

The lot

What is already here?

The lot holds a 41-story office building built in 1969, on a 26,525 sq ft lot.

  1. Floors 2–41Nothing on record
  2. Floor 1Street levelStreet level. The lot is recorded as commercial and office, so this floor is where the commercial space is.
  • Street levelCommercial and office
  • Above the southern skylineFrom about floor 51 — the tallest thing within 60 m to the south is 150.6 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 161.2 m over 41 floors, as the city counts them. 1 run of floors has something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1969
Floors
41
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C6-7
Lot area
26,525 sq ft
Building area
701,095 sq ft

Owner of record

NYC TRANSIT

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 31, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 2 open notices on record for this building, out of 80 notices on file; the most recent was issued Sep 21, 2015.

  • Elevator

    Issued Sep 21, 2015

  • Elevator

    Issued Sep 19, 2002

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 30, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1024828. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 20 alteration filing. Its latest status categories are 14 approved, 6 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Feb 10, 2025
Latest recorded change
Oct 28, 2026
Highest proposed story count
41 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 810 Seventh Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 20 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Modifications to the existing plumbing system on the 37th and 38th floors (Mirae) as per plans. No change to use, egress or occupancy. Filing M01155247-I1.

    01
  2. Alteration approved

    Filing M01155247-I1 reached an approved status.

    02
  3. Permit recorded for alteration

    DOB lists a first permit date for M01155247-I1. That is not by itself confirmation of activity on site.

    03
  4. Alteration filed

    Modifications to the existing HVAC system on the 33rd floor (Suite 3300) as per plans. No change to use, egress or occupancy. Filing M01160103-I1.

    04
  5. Alteration approved

    Filing M01160103-I1 reached an approved status.

    05
  6. Alteration filed

    Minor demolition of partitions, doors, ceilings and finishes on the 38th - 40th floors (39th -41st floors Marketing) (BRG) as per plans. No change to use, egress or occupancy. Filing M01165022-I1.

    06
  7. Permit recorded for alteration

    DOB lists a first permit date for M01160103-I1. That is not by itself confirmation of activity on site.

    07
  8. Alteration approved

    Filing M01165022-I1 reached an approved status.

    08
  9. Permit recorded for alteration

    DOB lists a first permit date for M01165022-I1. That is not by itself confirmation of activity on site.

    09
  10. Alteration filed

    Removal and disposal of interior partitions, doors, ceilings and finishes with patch and repair of walls, floors and columns on the 10th floor (Demo & Whitebox) as per plans. No change to use, egress or occupancy. Filing M01379955-I1.

    010
  11. Alteration approved

    Filing M01379955-I1 reached an approved status.

    011
  12. Alteration filed

    Removal and disposal of existing plumbing fixtures and associated piping on the 10th floor (Demo & Whitebox) as per plans. No change to use, egress or occupancy. Filing M01379964-I1.

    012
  13. Alteration filed

    Modifications to the existing sprinkler and standpipe systems on the 10th floor (Demo & Whitebox) as per plans. No change to use, egress or occupancy. Filing M01379975-I1.

    013
  14. Alteration approved

    Filing M01379975-I1 reached an approved status.

    014
  15. Alteration filed

    Modifications to the existing HVAC system on the 10th floor (Demo & Whitebox) as per plans. No change to use, egress or occupancy. Filing M01379958-I1.

    015
  16. Alteration approved

    Filing M01379964-I1 reached an approved status.

    016
  17. Alteration approved

    Filing M01379958-I1 reached an approved status.

    017
  18. Permit recorded for alteration

    DOB lists a first permit date for M01379958-I1. That is not by itself confirmation of activity on site.

    018
  19. Permit recorded for alteration

    DOB lists a first permit date for M01379955-I1. That is not by itself confirmation of activity on site.

    019
  20. Permit recorded for alteration

    DOB lists a first permit date for M01379964-I1. That is not by itself confirmation of activity on site.

    020
  21. Permit recorded for alteration

    DOB lists a first permit date for M01379975-I1. That is not by itself confirmation of activity on site.

    021
  22. Alteration filed

    Modifications to the existing plumbing system on the 2nd floor (Paradigm) as per plans. No change to use, egress or occupancy. Filing M01403496-I1.

    022
  23. Alteration approved

    Filing M01403496-I1 reached an approved status.

    023
  24. Alteration filed

    Removal and disposal of interior partitions, doors, ceilings and finishes on the 9th Floor (Turner Demo) as per plans. No change to use, egress or occupancy. Filing M01422566-I1.

    024
  25. Alteration approved

    Filing M01422566-I1 reached an approved status.

    025
  26. Permit recorded for alteration

    DOB lists a first permit date for M01422566-I1. That is not by itself confirmation of activity on site.

    026
  27. Alteration filed

    Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. Filing M01423226-I1.

    027
  28. Permit recorded for alteration

    DOB lists a first permit date for M01423226-I1. That is not by itself confirmation of activity on site.

    028
  29. Alteration now approved

    The latest status recorded for M01423226-I1 is “Permit Entire.”

    029
  30. Alteration filed

    Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. Filing M01418158-I1.

    030
  31. Permit recorded for alteration

    DOB lists a first permit date for M01418158-I1. That is not by itself confirmation of activity on site.

    031
  32. Alteration now approved

    The latest status recorded for M01418158-I1 is “Permit Entire.”

    032
  33. Alteration filed

    Facade repairs as per plans. No change to use, egress or occupancy. Filing M01422047-I1.

    033
  34. Alteration approved

    Filing M01422047-I1 reached an approved status.

    034
  35. Alteration now approved

    The latest status recorded for M01422047-I1 is “Approved.”

    035
  36. Alteration filed

    Modifications to the existing HVAC system on the 9th floor as per plans. No change to use, egress or occupancy. Filing M01452869-I1.

    036
  37. Alteration approved

    Filing M01452869-I1 reached an approved status.

    037
  38. Alteration filed

    Modifications to the existing sprinkler system with installation of a temporary loop on the 8th floor as per plans. No change to use, egress, or occupancy. Filing M01452898-I1.

    038
  39. Alteration approved

    Filing M01452898-I1 reached an approved status.

    039
  40. Alteration now approved

    The latest status recorded for M01452898-I1 is “Approved.”

    040
  41. Alteration filed

    Minor demolition with installation of new interior partitions, doors, suspended ceilings and finishes on 9th Floor as per plans. No change to use, egress or occupancy. Filing M01452861-I1.

    041
  42. Alteration approved

    Filing M01452861-I1 reached an approved status.

    042
  43. Alteration signed off

    DOB recorded a sign-off for M01379955-I1.

    043
  44. Alteration now completed

    The latest status recorded for M01379955-I1 is “LOC Issued.”

    044
  45. Permit recorded for alteration

    DOB lists a first permit date for M01452861-I1. That is not by itself confirmation of activity on site.

    045
  46. Permit recorded for alteration

    DOB lists a first permit date for M01452869-I1. That is not by itself confirmation of activity on site.

    046
  47. Alteration signed off

    DOB recorded a sign-off for M01379958-I1.

    047
  48. Alteration now completed

    The latest status recorded for M01379958-I1 is “LOC Issued.”

    048
  49. Permit recorded for alteration

    DOB lists a first permit date for M01403496-I1. That is not by itself confirmation of activity on site.

    049
  50. Alteration now approved

    The latest status recorded for M01403496-I1 is “Permit Entire.”

    050
  51. Alteration filed

    Modifications to the existing HVAC system on the 33rd floor (Suite 3300) as per plans. No change to use, egress or occupancy. Filing M01160103-P1.

    051
  52. Alteration approved

    Filing M01160103-P1 reached an approved status.

    052
  53. Alteration now approved

    The latest status recorded for M01160103-P1 is “Approved.”

    053
  54. Alteration now approved

    The latest status recorded for M01160103-I1 is “Permit Entire.”

    054
  55. Alteration signed off

    DOB recorded a sign-off for M01165022-I1.

    055
  56. Alteration now completed

    The latest status recorded for M01165022-I1 is “LOC Issued.”

    056
  57. Alteration filed

    Removal and disposal of interior partitions, doors, suspended ceilings and finishes with patch and repair of walls, ceilings and fixtures on the 25th floor as per plans. No change to use, egress or occupancy. Filing M01341018-I1.

    057
  58. Alteration approved

    Filing M01341018-I1 reached an approved status.

    058
  59. Alteration signed off

    DOB recorded a sign-off for M01155247-I1.

    059
  60. Alteration now completed

    The latest status recorded for M01155247-I1 is “LOC Issued.”

    060
  61. Permit recorded for alteration

    DOB lists a first permit date for M01341018-I1. That is not by itself confirmation of activity on site.

    061
  62. Alteration now approved

    The latest status recorded for M01341018-I1 is “Permit Entire.”

    062
  63. Alteration filed

    Modifications to the existing HVAC system on the 25th floor as per plans. No change to use, egress or occupancy. Filing M01341117-I1.

    063
  64. Alteration filed

    Removal of existing sprinkler system with installation of a temporary loop on the 25th floor as per plans. No change to use, egress or occupancy. Filing M01341121-I1.

    064
  65. Alteration filed

    Removal and disposal of existing plumbing fixtures and associated piping on the 25th floor as per plans. No change to use, egress or occupancy. Filing M01341119-I1.

    065
  66. Alteration approved

    Filing M01341121-I1 reached an approved status.

    066
  67. Alteration approved

    Filing M01341117-I1 reached an approved status.

    067
  68. Alteration signed off

    DOB recorded a sign-off for M01379964-I1.

    068
  69. Alteration now completed

    The latest status recorded for M01379964-I1 is “LOC Issued.”

    069
  70. Alteration signed off

    DOB recorded a sign-off for M01379975-I1.

    070
  71. Alteration now completed

    The latest status recorded for M01379975-I1 is “LOC Issued.”

    071
  72. Permit recorded for alteration

    DOB lists a first permit date for M01341121-I1. That is not by itself confirmation of activity on site.

    072
  73. Alteration now approved

    The latest status recorded for M01341121-I1 is “Permit Entire.”

    073
  74. Alteration approved

    Filing M01341119-I1 reached an approved status.

    074
  75. Permit recorded for alteration

    DOB lists a first permit date for M01341119-I1. That is not by itself confirmation of activity on site.

    075
  76. Alteration now approved

    The latest status recorded for M01341119-I1 is “Permit Entire.”

    076
  77. Permit recorded for alteration

    DOB lists a first permit date for M01341117-I1. That is not by itself confirmation of activity on site.

    077
  78. Alteration now approved

    The latest status recorded for M01341117-I1 is “Permit Entire.”

    078
  79. Alteration now approved

    The latest status recorded for M01452861-I1 is “Permit Entire.”

    079
  80. Alteration now approved

    The latest status recorded for M01452869-I1 is “Permit Entire.”

    080
  81. Alteration now approved

    The latest status recorded for M01422566-I1 is “Permit Entire.”

    081