DOB filing M01454519-S1
Alteration filing at 60 West 66 Street
Building record · BIN 1028159
60 West 66 Street, Manhattan, NY 10023
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 34 independently sourced records, including 33 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1028159
60 West 66 Street
Upper West Side-Lincoln Square, Manhattan
A consolidated public-record view · updated Oct 1, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 36-story place of worship built in 1974, with 320 homes, on a 25,104 sq ft lot.
The apartments
406 condominium apartments are assessed on this block, and the typical one is 2,424 sq ft (225 m²). They run from 33 to 1254 m².
The city values the typical one at $921,502. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.
What it sold for
46 apartments on this tax block changed hands in the year the city last published, at a median of $8,986,850, from 610,000 to 55,635,125.
Recorded sale prices from the Department of Finance’s rolling file, covering the year to Aug 31, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.
Owner of record
EMB REALTY LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 3, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 1 open notice on record for this building, out of 94 notices on file; the most recent was issued Jun 4, 1991.
Issued Jun 4, 1991
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 2, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1028159. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 34 alteration filing. Its latest status categories are 33 approved, 1 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 60 West 66 Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 34 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Heavy duty urban sidewalk shed during building alteration, filed sep. shed shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M01061088-I1.
Construction fence as per drawings. construction fence shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. dot permits by others for fence installed on sidewalk/roadway. Filing M01061102-I1.
Temporary hoist run-back structure during bldg alteration, filed separately. hoist run-back structure shall comply with ch #33 of the NYC bldg code. no change in use, occupancy or egress under this application. hoist & elevator appl submitted sep. Filing M01061105-I1.
Filing M01061088-I1 reached an approved status.
Filing M01061102-I1 reached an approved status.
DOB lists a first permit date for M01061088-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01061102-I1. That is not by itself confirmation of activity on site.
Use of mechanical equipment for use during interior demolition, filed separately under m01065019-i1. this application is filed in conjunction with alteration m00930717-i1. Filing M01065019-S1.
Temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M01083854-I1.
Equipment use: dual 7000 # capacity personnel/material hoists during bldg alteration, filed sep. hoists shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. elevator application submitted separately. Filing M01061107-I1.
Filing M01061107-I1 reached an approved status.
Filing M01061105-I1 reached an approved status.
DOB lists a first permit date for M01061107-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01061105-I1. That is not by itself confirmation of activity on site.
Filing M01083854-I1 reached an approved status.
Temporary roof protection during bldg alteration, filed sep. roof protection shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M01109665-I1.
DOB lists a first permit date for M01083854-I1. That is not by itself confirmation of activity on site.
Filing M01065019-S1 reached an approved status.
DOB lists a first permit date for M01065019-S1. That is not by itself confirmation of activity on site.
Filing M01109665-I1 reached an approved status.
DOB lists a first permit date for M01109665-I1. That is not by itself confirmation of activity on site.
Material only hoists as per drawings, during bldg alteration, filed separately. pipe scaffold filed separately. hoists shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M01223764-I1.
DOB lists a first permit date for M01223764-I1. That is not by itself confirmation of activity on site.
Temporary monorail system as per drawings during building alteration, filed sep. monorail system shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M01223758-I1.
DOB lists a first permit date for M01223758-I1. That is not by itself confirmation of activity on site.
Temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M01262910-I1.
DOB lists a first permit date for M01262910-I1. That is not by itself confirmation of activity on site.
Hereby filing plumbing work at 23rd floor unit 23h as per plans. Filing M01314280-S1.
Filing M01314280-S1 reached an approved status.
DOB lists a first permit date for M01314280-S1. That is not by itself confirmation of activity on site.
Hereby filing plumbing work at 36th floor unit 36c as per plans. Filing M01345287-S1.
Filing M01345287-S1 reached an approved status.
DOB lists a first permit date for M01345287-S1. That is not by itself confirmation of activity on site.
Hereby filing general construction work at 10th floor unit 10j as per plans. related plumbing work filed subsequently. Filing M01412477-I1.
Hereby filing plumbing work at 10th floor unit 10j as per plans. Filing M01412477-S1.
Filing M01412477-I1 reached an approved status.
Filing M01412477-S1 reached an approved status.
Hereby filing plumbing work at 36th floor unit 36a as per plans. Filing M01410013-S1.
Filing M01410013-S1 reached an approved status.
Hereby filing general construction work at 36th floor unit 36a as per plans. Filing M01410013-I1.
DOB lists a first permit date for M01412477-I1. That is not by itself confirmation of activity on site.
Filing M01410013-I1 reached an approved status.
DOB lists a first permit date for M01412477-S1. That is not by itself confirmation of activity on site.
Hereby filing plumbing work at 23rd floor unit 23c as per plans. Filing M01438152-S1.
Filing M01438152-S1 reached an approved status.
Hereby filing general construction work at 23rd floor unit 23c as per plans. Filing M01438152-I1.
Filing M01438152-I1 reached an approved status.
Hereby filing plumbing work at 19th floor unit 19a as per plans. Filing M01441486-S1.
Hereby filing general construction work at 19th floor unit 19a as per plans. Filing M01441486-I1.
Filing M01441486-S1 reached an approved status.
Filing M01441486-I1 reached an approved status.
The latest status recorded for M01065019-S1 is “Permit Entire.”
DOB lists a first permit date for M01410013-I1. That is not by itself confirmation of activity on site.
Hereby filing plumbing work at 23rd floor unit 23h as per plans. Filing M01314280-P1.
Hereby filing plumbing work at 36th floor unit 36c as per plans. Filing M01345287-P1.
Hereby filing general construction work at 10th floor unit 10j as per plans. related plumbing work filed subsequently. Filing M01412477-P2.
Hereby filing plumbing work at 10th floor unit 10j as per plans. Filing M01412477-P1.
Filing M01314280-P1 reached an approved status.
The latest status recorded for M01314280-P1 is “Approved.”
Filing M01345287-P1 reached an approved status.
The latest status recorded for M01345287-P1 is “Approved.”
Filing M01412477-P2 reached an approved status.
The latest status recorded for M01412477-P2 is “Approved.”
Filing M01412477-P1 reached an approved status.
The latest status recorded for M01412477-P1 is “Approved.”
The latest status recorded for M01345287-S1 is “Permit Entire.”
The latest status recorded for M01314280-S1 is “Permit Entire.”
The latest status recorded for M01412477-S1 is “Permit Entire.”
DOB lists a first permit date for M01410013-S1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for M01412477-I1.
The latest status recorded for M01412477-I1 is “LOC Issued.”
Hereby filing plumbing work at 19th floor unit 19a as per plans. Filing M01441486-P2.
Hereby filing general construction work at 19th floor unit 19a as per plans. Filing M01441486-P1.
Hereby filing plumbing work at 36th floor unit 36a as per plans. Filing M01410013-P2.
Hereby filing general construction work at 36th floor unit 36a as per plans. Filing M01410013-P1.
DOB lists a first permit date for M01438152-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01438152-I1 is “Permit Entire.”
Filing M01441486-P2 reached an approved status.
The latest status recorded for M01441486-P2 is “Approved.”
Filing M01441486-P1 reached an approved status.
The latest status recorded for M01441486-P1 is “Approved.”
Filing M01410013-P2 reached an approved status.
The latest status recorded for M01410013-P2 is “Approved.”
Filing M01410013-P1 reached an approved status.
The latest status recorded for M01410013-P1 is “Approved.”
The latest status recorded for M01410013-S1 is “Permit Entire.”
The latest status recorded for M01410013-I1 is “Permit Entire.”
DOB lists a first permit date for M01441486-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01441486-I1 is “Permit Entire.”
The latest status recorded for M01223764-I1 is “Permit Entire.”
The latest status recorded for M01262910-I1 is “Permit Entire.”
The latest status recorded for M01083854-I1 is “Permit Entire.”
The latest status recorded for M01061102-I1 is “Permit Entire.”
The latest status recorded for M01223758-I1 is “Permit Entire.”
The latest status recorded for M01109665-I1 is “Permit Entire.”
The latest status recorded for M01061107-I1 is “Permit Entire.”
The latest status recorded for M01061105-I1 is “Permit Entire.”
Hereby filing plumbing work at 29th floor unit 29b as per plans. Filing M01454519-S1.
Filing M01454519-S1 reached an approved status.
Hereby filing general construction work at 29th floor unit 29b as per plans. Filing M01454519-I1.
Filing M01454519-I1 reached an approved status.
DOB lists a first permit date for M01454519-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01454519-I1 is “Permit Entire.”
DOB lists a first permit date for M01441486-S1. That is not by itself confirmation of activity on site.
The latest status recorded for M01441486-S1 is “Permit Entire.”
Hereby filing general construction work at 30th floor unit 30j as per plans. Filing M01462816-I1.
Hereby filing general construction work at 29th floor unit 29j as per plans. Filing M01462801-I1.
Hereby filing plumbing work at 29th floor unit 29j as per plans. Filing M01462801-S1.
Hereby filing plumbing work at 30th floor unit 30j as per plans. Filing M01462816-S1.
DOB lists a first permit date for M01438152-S1. That is not by itself confirmation of activity on site.
The latest status recorded for M01438152-S1 is “Permit Entire.”
Filing M01462801-I1 reached an approved status.
Filing M01462816-I1 reached an approved status.
Filing M01462801-S1 reached an approved status.
The latest status recorded for M01462801-S1 is “Approved.”
Filing M01462816-S1 reached an approved status.
The latest status recorded for M01462816-S1 is “Approved.”
DOB lists a first permit date for M01462816-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01462816-I1 is “Permit Entire.”
DOB lists a first permit date for M01462801-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01462801-I1 is “Permit Entire.”
DOB lists a first permit date for M01454519-S1. That is not by itself confirmation of activity on site.
The latest status recorded for M01454519-S1 is “Permit Entire.”
The latest status recorded for M01061088-I1 is “Permit Entire.”