Building record · BIN 1030727

2130 Broadway

2130 Broadway, Manhattan, NY 10023

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 27 independently sourced records, including 26 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 1030727

2130 Broadway

Upper West Side (Central), Manhattan

A consolidated public-record view · updated Nov 10, 2026

DOB filings
27
Active-status
26
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings27
Open or active-status records26
First included filingJul 9, 2024
Latest recorded changeNov 10, 2026

The lot

What is already here?

The lot holds a 27-story hotel built in 1927, with 62 homes, on a 9,116 sq ft lot.

  1. Floors 18–27Above the southern skylineAbove the tallest building within sixty metres to the south, which stands 52.4 m. Nothing on that side reaches this floor.
  2. Floors 2–17Homes62 homes are recorded on this lot — about 2 homes to a floor, and the apartments assessed on this block run to a typical 611 sq ft (57 m²). The city does not publish which floor any of them is on.
  3. Floor 1Street levelStreet level. The lot is recorded as commercial and office, so this floor is where the commercial space is.
  • Street levelCommercial and office
  • Homes62 recorded · typically 57 m² · valued $156,084
  • Above the southern skylineFrom about floor 18 — the tallest thing within 60 m to the south is 52.4 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 85.3 m over 27 floors, as the city counts them. 3 runs of floors have something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1927
Last altered
2005
Floors
27
Residential units
62
Building type
Hotel
Land use
Commercial and office
Zoning district
C4-6A
Lot area
9,116 sq ft
Building area
249,505 sq ft

Housing violations

20 violations are open against this address under the Housing Maintenance Code. 1 of them is the class the city calls immediately hazardous.

  • 1Immediately hazardous
  • 11Hazardous
  • 8Non-hazardous
  • 0Information order

Open means the Department of Housing Preservation and Development has not recorded it as corrected, which is not the same as nobody having fixed it. The city publishes the apartment each was written against; that is not carried here, because a count says a building has a problem and an apartment number says whose.

The apartments

184 condominium apartments are assessed on this block, and the typical one is 611 sq ft (57 m²). They run from 40 to 90 m².

The city values the typical one at $156,084. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.

What it sold for

12 apartments on this tax block changed hands in the year the city last published, at a median of $1,300,000, from 655,000 to 5,400,000.

Recorded sale prices from the Department of Finance’s rolling file, covering the year to Sep 30, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.

Owner of record

300 WEST END AVE ASSOCS. CORP.

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 12, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 113 notices on file; the most recent was issued Nov 14, 2025.

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Hazardous condition (facade)

    Issued Feb 18, 2022 — CYCLE 9A UNSAFE REPORT FILED

  • 1 further open notice is on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 11, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1030727. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 27 alteration filing. Its latest status categories are 10 under review, 16 approved, 1 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Jul 9, 2024
Latest recorded change
Nov 10, 2026
Highest proposed story count
24 stories
Highest proposed unit count
319 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 2130 Broadway.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 27 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    INTERIOR REMOVALS AND CONSTRUCTION OF HOTEL ROOMS ON 25, 24, 22, 21 and 20 FLOORS LISTED FOR THE BEACON HOTEL. NO CHANGE IN USE,EGRESS OR OCCUPANCY. Filing M00950714-I1.

    01
  2. Alteration filed

    SPRINKLER WORK RELATED TO INTERIOR REMOVALS AND CONSTRUCTION OF HOTEL ROOMS ON 25, 24, 22, 21 and 20 FLOORS LISTED FOR THE BEACON HOTEL. NO CHANGE IN USE,EGRESS OR OCCUPANCY. Filing M00950729-I1.

    02
  3. Alteration approved

    Filing M00950729-I1 reached an approved status.

    03
  4. Alteration approved

    Filing M00950714-I1 reached an approved status.

    04
  5. Permit recorded for alteration

    DOB lists a first permit date for M00950729-I1. That is not by itself confirmation of activity on site.

    05
  6. Permit recorded for alteration

    DOB lists a first permit date for M00950714-I1. That is not by itself confirmation of activity on site.

    06
  7. Alteration filed

    Selective Removals and Interior renovations of existing Hotel rooms on Floor 15 thru 19 as shown on plans . No change in use, egress or occupancy with this filing. Filing M00966251-I1.

    07
  8. Alteration filed

    Modification to existing T-MOBILE site on the roof. Removal of 5 antennas, 6 RRU's, 1 GPS antenna and 3 cabinets. Filing M01379532-I1.

    08
  9. Alteration approved

    Filing M00966251-I1 reached an approved status.

    09
  10. Alteration filed

    Modification to plumbing system as per plans filed herewith. Filing M00966251-S1.

    010
  11. Alteration approved

    Filing M01379532-I1 reached an approved status.

    011
  12. Alteration approved

    Filing M00966251-S1 reached an approved status.

    012
  13. Alteration filed

    Installation of temporary plywood enclosure per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. Filing M01422002-I1.

    013
  14. Permit recorded for alteration

    DOB lists a first permit date for M01422002-I1. That is not by itself confirmation of activity on site.

    014
  15. Permit recorded for alteration

    DOB lists a first permit date for M01379532-I1. That is not by itself confirmation of activity on site.

    015
  16. Permit recorded for alteration

    DOB lists a first permit date for M00966251-I1. That is not by itself confirmation of activity on site.

    016
  17. Permit recorded for alteration

    DOB lists a first permit date for M00966251-S1. That is not by itself confirmation of activity on site.

    017
  18. Alteration filed

    INTERIOR REMOVALS AND CONSTRUCTION OF HOTEL ROOMS ON 25, 24, 22, 21 and 20 FLOORS LISTED FOR THE BEACON HOTEL. NO CHANGE IN USE,EGRESS OR OCCUPANCY. Filing M00950714-P3.

    018
  19. Alteration filed

    Modification to existing T-MOBILE site on the roof. Removal of 5 antennas, 6 RRU's, 1 GPS antenna and 3 cabinets. Filing M01379532-P1.

    019
  20. Alteration now under review

    The latest status recorded for M01379532-P1 is “Chief Plan Examiner/ Assistant Chief Plan Examiner Review.”

    020
  21. Alteration filed

    Removal and installation of interior non load bearing partitions as per plans filed herewith for the 19th floor (20th Marketing). Filing M01434696-I1.

    021
  22. Alteration filed

    Beacon Hotel Exterior facade repairs per the plans: Repair of spalled and cracked terra cotta units and stone units. Removal and replacement of cracked masonry units. Masonry re-pointing. Plaster repair. Scraping and painting of existing steel lintel. Filing M01450984-I1.

    022
  23. Alteration approved

    Filing M01450984-I1 reached an approved status.

    023
  24. Alteration now approved

    The latest status recorded for M01450984-I1 is “Approved.”

    024
  25. Alteration approved

    Filing M00950714-P3 reached an approved status.

    025
  26. Alteration now approved

    The latest status recorded for M00950714-P3 is “Approved.”

    026
  27. Alteration now approved

    The latest status recorded for M00950714-I1 is “Permit Entire.”

    027
  28. Alteration filed

    Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. Filing M01450984-S1.

    028
  29. Permit recorded for alteration

    DOB lists a first permit date for M01450984-S1. That is not by itself confirmation of activity on site.

    029
  30. Alteration now approved

    The latest status recorded for M01450984-S1 is “Permit Entire.”

    030
  31. Alteration filed

    Selective Removals and Interior renovations of existing Hotel rooms on Floor 15 thru 19 as shown on plans . No change in use, egress or occupancy with this filing. Filing M00966251-P1.

    031
  32. Alteration filed

    Modification to sprinkler system as per plans filed herewith (floors 15th - 19th). Filing M00966251-P3.

    032
  33. Alteration filed

    Modification to plumbing system as per plans filed herewith. Filing M00966251-P2.

    033
  34. Alteration filed

    Installation of temporary plywood enclosure per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. Filing M01422002-P1.

    034
  35. Alteration approved

    Filing M01422002-P1 reached an approved status.

    035
  36. Alteration now approved

    The latest status recorded for M01422002-P1 is “Approved.”

    036
  37. Alteration now approved

    The latest status recorded for M01422002-I1 is “Permit Entire.”

    037
  38. Alteration filed

    Structural modifications as per plans. 19th floor construction, 20th marketing (repairs to shaft walls, repairs to structural slabs. Filing M00950714-S2.

    038
  39. Alteration filed

    Modification to plumbing fixtures as per plans on the 19th floor (20th marketing). Filing M01434696-S1.

    039
  40. Alteration approved

    Filing M00966251-P2 reached an approved status.

    040
  41. Alteration now approved

    The latest status recorded for M00966251-P2 is “Approved.”

    041
  42. Alteration now approved

    The latest status recorded for M00966251-S1 is “Permit Entire.”

    042
  43. Alteration filed

    Modification to sprinkler system as per plans filed. Filing M01434696-S2.

    043
  44. Alteration approved

    Filing M01434696-S2 reached an approved status.

    044
  45. Alteration now approved

    The latest status recorded for M01434696-S2 is “Approved.”

    045
  46. Alteration filed

    SPRINKLER WORK RELATED TO INTERIOR REMOVALS AND CONSTRUCTION OF HOTEL ROOMS ON 25, 24, 22, 21 and 20 FLOORS LISTED FOR THE BEACON HOTEL. NO CHANGE IN USE,EGRESS OR OCCUPANCY. Filing M00950729-P2.

    046
  47. Alteration approved

    Filing M00966251-P1 reached an approved status.

    047
  48. Alteration now approved

    The latest status recorded for M00966251-P1 is “Approved.”

    048
  49. Alteration now approved

    The latest status recorded for M00966251-I1 is “Permit Entire.”

    049
  50. Alteration approved

    Filing M00950714-S2 reached an approved status.

    050
  51. Alteration now approved

    The latest status recorded for M00950714-S2 is “Approved.”

    051
  52. Alteration filed

    Structural repairs as per plans (Repairs to shaft walls, repairs to structural slabs). 14th though 18th floors. Filing M00966251-S3.

    052
  53. Alteration approved

    Filing M00950729-P2 reached an approved status.

    053
  54. Alteration now approved

    The latest status recorded for M00950729-P2 is “Approved.”

    054
  55. Alteration now approved

    The latest status recorded for M00950729-I1 is “Permit Entire.”

    055
  56. Alteration signed off

    DOB recorded a sign-off for M01379532-I1.

    056
  57. Alteration now completed

    The latest status recorded for M01379532-I1 is “LOC Issued.”

    057
  58. Alteration now under review

    The latest status recorded for M00966251-P3 is “Plan Examiner Review.”

    058
  59. Alteration filed

    PLUMBING WORK RELATED TO INTERIOR REMOVALS AND CONSTRUCTION OF HOTEL ROOMS ON 25, 24, 22, 21 and 20 FLOORS LISTED FOR THE BEACON HOTEL. NO CHANGE IN USE,EGRESS OR OCCUPANCY. Filing M00950730-P3.

    059
  60. Alteration now under review

    The latest status recorded for M00950730-P3 is “Plan Examiner Review.”

    060
  61. Alteration approved

    Filing M01434696-S1 reached an approved status.

    061
  62. Alteration now approved

    The latest status recorded for M01434696-S1 is “Approved.”

    062
  63. Alteration filed

    Removal and installation of interior non-load bearing partitions as per plans filed herewith. No change in use egress or occupancy under this application. Filing M01463367-I1.

    063
  64. Alteration filed

    Modification to sprinkler system as per plans filed herewith. Filing M01463367-S3.

    064
  65. Alteration filed

    Structural modifications as per plans (repairs to shafts, repairs to structural slabs, replacement of selective structural slabs). Filing M01463367-S1.

    065
  66. Alteration approved

    Filing M00966251-S3 reached an approved status.

    066
  67. Alteration now approved

    The latest status recorded for M00966251-S3 is “Approved.”

    067
  68. Alteration now under review

    The latest status recorded for M01463367-S3 is “Chief Plan Examiner/ Assistant Chief Plan Examiner Review.”

    068
  69. Alteration now under review

    The latest status recorded for M01463367-S1 is “Chief Plan Examiner/ Assistant Chief Plan Examiner Review.”

    069
  70. Alteration now under review

    The latest status recorded for M01463367-I1 is “Chief Plan Examiner/ Assistant Chief Plan Examiner Review.”

    070
  71. Alteration now under review

    The latest status recorded for M01434696-I1 is “Prof Cert QA Review.”

    071
  72. Alteration filed

    Modification to plumbing fixtures as per plans. Filing M01275136-P3.

    072
  73. Alteration now under review

    The latest status recorded for M01275136-P3 is “Pending Plan Examiner Assignment.”

    073
  74. Alteration filed

    Mechanical work in connection with Lobby area renovations. No change in use, egress or occupancy with this filing. Filing M01275136-P4.

    074
  75. Alteration now under review

    The latest status recorded for M01275136-P4 is “Pending Plan Examiner Assignment.”

    075
  76. Alteration filed

    Herewith filing for General Construction consisting of Lobby area renovations and Storefront replacement, new base stone and maintenance repairs around the area as needed. No change in use, egress or occupancy with this filing. Filing M01275136-P1.

    076
  77. Alteration now under review

    The latest status recorded for M01275136-P1 is “Pending Plan Examiner Assignment.”

    077