DOB filing M01187782-S1
Alteration filing at 239 Central Park West
Building record · BIN 1031233
239 Central Park West, Manhattan, NY 10024
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 7 independently sourced records, including 6 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1031233
239 Central Park West
Upper West Side (Central), Manhattan
A consolidated public-record view · updated Sep 30, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 16-story elevator apartment building built in 1926, with 84 homes, on a 16,150 sq ft lot.
Housing violations
1 violation is open against this address under the Housing Maintenance Code. 1 of them is the class the city calls immediately hazardous.
Open means the Department of Housing Preservation and Development has not recorded it as corrected, which is not the same as nobody having fixed it. The city publishes the apartment each was written against; that is not carried here, because a count says a building has a problem and an apartment number says whose.
The apartments
74 condominium apartments are assessed on this block, and the typical one is 1,005 sq ft (93 m²). They run from 38 to 145 m².
The city values the typical one at $330,425. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.
What it sold for
18 apartments on this tax block changed hands in the year the city last published, at a median of $1,225,000, from 240,000 to 4,450,000.
Recorded sale prices from the Department of Finance’s rolling file, covering the year to Aug 31, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.
Owner of record
PEBBLE LANE GROUP LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 3, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
One home at this address is currently listed for sale by Coldwell Banker. Prices move; the brokerage’s own page is the one that is current, and every row here links to it.
| Unit | Rooms | Size | Price | Per sq ft | Listed by |
|---|---|---|---|---|---|
| Unit 11DFor sale | Price not read | Coldwell Banker |
Read from the brokerages’ own published listings on October 3, 2026. A home drops off this table the next time they publish a list without it — usually because it sold or let, though a listing can also expire or be withdrawn. What we know is that it is no longer offered, which is why this shows what they have today rather than what we were told once. Everything on the market across the city.
Violation record
The Department of Buildings has 3 open notices on record for this building, out of 66 notices on file; the most recent was issued Jul 31, 2018.
Issued Jul 31, 2018 — FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018
Issued Jun 29, 1990 — 2
Issued Oct 12, 1989 — 4
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 2, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1031233. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 7 alteration filing. Its latest status categories are 1 recorded as completed, 6 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 239 Central Park West.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 7 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Renovation of kitchen & relocation of (2) bathrooms. relocation of washer/dryer. Filing M01187782-S1.
Filing M01187782-S1 reached an approved status.
DOB lists a first permit date for M01187782-S1. That is not by itself confirmation of activity on site.
Interior renovation on apartment 12B as per plans filed herewith. Related Mechanical and Plumbing work filed as subsequent applications. No changes to use, egress or occupancy. Filing M01247403-I1.
Mechanical work related to interior renovation on apartment 12B as per plans filed herewith. Filing M01247403-S1.
Filing M01247403-I1 reached an approved status.
Filing M01247403-S1 reached an approved status.
Replacement of brick masonry, replacement of window sills and steel lintels, and leak repair. No scope of work at the interior, no change in use, egress or occupancy. Filing M01350123-I1.
Filing M01350123-I1 reached an approved status.
DOB lists a first permit date for M01247403-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01247403-S1. That is not by itself confirmation of activity on site.
Filing for interior demo and general construction of a Class A apartment, unit 4D. No change of use, egress or occupancy. Filing M01399664-I1.
Fiing for plumbing work as per plans filed. No change in use, egress or occupancy. Filing M01399664-S2.
Installation of HVAC equipment as per plans filed. No change of use, egress or occupancy. Filing M01399664-S1.
Filing M01399664-I1 reached an approved status.
Filing M01399664-S1 reached an approved status.
DOB lists a first permit date for M01350123-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01350123-I1 is “Permit Entire.”
Filing M01399664-S2 reached an approved status.
DOB lists a first permit date for M01399664-S1. That is not by itself confirmation of activity on site.
The latest status recorded for M01399664-S1 is “Permit Entire.”
DOB lists a first permit date for M01399664-S2. That is not by itself confirmation of activity on site.
The latest status recorded for M01399664-S2 is “Permit Entire.”
The latest status recorded for M01247403-S1 is “Permit Entire.”
The latest status recorded for M01247403-I1 is “Permit Entire.”
DOB lists a first permit date for M01399664-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01399664-I1 is “Permit Entire.”
DOB recorded a sign-off for M01187782-S1.
The latest status recorded for M01187782-S1 is “LOC Issued.”