DOB filing M00932438-P3
Alteration filing at 1 West 89 Street
Building record · BIN 1031567
1 West 89 Street, Manhattan, NY 10024
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 3 independently sourced records, including 3 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1031567
1 West 89 Street
Upper West Side (Central), Manhattan
A consolidated public-record view · updated Oct 20, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 7-story condominium built in 1900, with 11 homes, on a 5,070 sq ft lot.
Housing violations
11 violations are open against this address under the Housing Maintenance Code. 3 of them are the class the city calls immediately hazardous.
Open means the Department of Housing Preservation and Development has not recorded it as corrected, which is not the same as nobody having fixed it. The city publishes the apartment each was written against; that is not carried here, because a count says a building has a problem and an apartment number says whose.
The apartments
114 condominium apartments are assessed on this block, and the typical one is 650 sq ft (60 m²). They run from 48 to 171 m².
The city values the typical one at $150,641. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.
What it sold for
25 apartments on this tax block changed hands in the year the city last published, at a median of $525,000, from 125,000 to 2,175,000.
Recorded sale prices from the Department of Finance’s rolling file, covering the year to Sep 30, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.
Owner of record
ABABA-W89, LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 22, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 2 open notices on record for this building, out of 19 notices on file; the most recent was issued Nov 1, 2023.
Issued Nov 1, 2023 — FAILURE TO CORRECT SWARMP CONDITIONS
Issued Jul 31, 2023 — CYCLE 9C UNSAFE REPORT FILED
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 22, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1031567. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 3 alteration filing. Its latest status categories are 2 approved, 1 under review. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 1 West 89 Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 3 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Facade repairs based on swarmp and unsafe conditions cited in the 9th cycle fisp report filed with DOB. no change in egress, use or occupancy. Filing M01048591-I1.
Filing M01048591-I1 reached an approved status.
DOB lists a first permit date for M01048591-I1. That is not by itself confirmation of activity on site.
Install new gas burner. provide new 3" gas line from meter to boiler room. provide gas meter. connect new burner to boiler / heating system. to register 1 existing boiler and 3 existing hot water heaters. Filing M00932438-S1.
Filing M00932438-S1 reached an approved status.
DOB lists a first permit date for M00932438-S1. That is not by itself confirmation of activity on site.
The latest status recorded for M01048591-I1 is “On Hold - Pending Supersede of Applicant of Record.”
Install new gas burner. provide new 3" gas line from meter to boiler room. provide gas meter. connect new burner to boiler / heating system. to register 1 existing boiler and 3 existing hot water heaters. Filing M00932438-P3.
Filing M00932438-P3 reached an approved status.
The latest status recorded for M00932438-P3 is “Approved.”
The latest status recorded for M00932438-S1 is “Permit Entire.”