DOB filing M08031822-I1
Alteration filing at 86 Riverside Drive
Building record · BIN 1033750
86 Riverside Drive, Manhattan, NY 10024
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 3 independently sourced records, including 3 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1033750
86 Riverside Drive
Upper West Side (Central), Manhattan
A consolidated public-record view · updated Oct 27, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 5-story educational building built in 1898, on a 1,925 sq ft lot.
The apartments
48 condominium apartments are assessed on this block, and the typical one is 804 sq ft (75 m²). They run from 45 to 129 m².
The city values the typical one at $259,670. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.
What it sold for
13 apartments on this tax block changed hands in the year the city last published, at a median of $1,899,000, from 402,800 to 10,995,000.
Recorded sale prices from the Department of Finance’s rolling file, covering the year to Sep 30, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.
Owner of record
HORIZON 80 RSD LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 29, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1033750. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 3 alteration filing. Its latest status categories are 3 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 86 Riverside Drive.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 3 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Work consists of exterior work to include removal/install of windows, doors, railing and iron gates. No change in egress, use or occupancy. Filing M08031822-I1.
Filing M08031822-I1 reached an approved status.
DOB lists a first permit date for M08031822-I1. That is not by itself confirmation of activity on site.
Build out of single family residence to include removal/installalation of non load bearing partitions, flooring, ceiling, fixtures and finishes. roof and elevator pit work as per plans filed herewith. no change in egress, use or occupancy. Filing M00839763-I1.
Filing M00839763-I1 reached an approved status.
DOB lists a first permit date for M00839763-I1. That is not by itself confirmation of activity on site.
Mechanical work associated with renovation to existing resident to accommodate new layout. Filing M00831517-I1.
Filing M00831517-I1 reached an approved status.
DOB lists a first permit date for M00831517-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M08031822-I1 is “Permit Entire.”
The latest status recorded for M00831517-I1 is “Permit Entire.”
The latest status recorded for M00839763-I1 is “Permit Entire.”