Building record · BIN 1034199

500 5 Avenue

500 5 Avenue, Manhattan, NY 10110

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 7 independently sourced records, including 7 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 1034199

500 5 Avenue

Midtown-Times Square, Manhattan

A consolidated public-record view · updated Sep 30, 2026

DOB filings
7
Active-status
7
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings7
Open or active-status records7
First included filingJun 2, 2023
Latest recorded changeSep 30, 2026

The lot

What is already here?

The lot holds a 58-story office building built in 1931, on a 20,920 sq ft lot.

  1. Floors 42–58Above the southern skylineAbove the tallest building within sixty metres to the south, which stands 124.1 m. Nothing on that side reaches this floor.
  2. Floors 2–41Nothing on record
  3. Floor 1Street levelStreet level. The lot is recorded as commercial and office, so this floor is where the commercial space is.
  • Street levelCommercial and office
  • Above the southern skylineFrom about floor 42 — the tallest thing within 60 m to the south is 124.1 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 214.8 m over 58 floors, as the city counts them. 2 runs of floors have something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1931
Last altered
2018
Floors
58
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C5-3
Lot area
20,920 sq ft
Building area
659,122 sq ft

Owner of record

1114 6TH AVENUE OWNER LLC

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 2, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 45 open notices on record for this building, out of 291 notices on file; the most recent was issued Dec 1, 2024.

  • Failure to post energy

    Issued Dec 1, 2024 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

  • Failure to post energy

    Issued Dec 1, 2023 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

  • Failure to post energy

    Issued Dec 1, 2022 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

  • 42 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 2, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1034199. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 7 alteration filing. Its latest status categories are 5 approved, 2 under review. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Jun 2, 2023
Latest recorded change
Sep 30, 2026
Highest proposed story count
58 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 500 5 Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 7 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    9th Cycle Facade Repair Program. No change to use, egress or occupancy. Filing M08025345-I1.

    01
  2. Alteration approved

    Filing M08025345-I1 reached an approved status.

    02
  3. Alteration filed

    Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. live load 300psf. Filing M01032218-I1.

    03
  4. Permit recorded for alteration

    DOB lists a first permit date for M01032218-I1. That is not by itself confirmation of activity on site.

    04
  5. Permit recorded for alteration

    DOB lists a first permit date for M08025345-I1. That is not by itself confirmation of activity on site.

    05
  6. Alteration filed

    Plumbing and Sprinkler scope associated with the renovation of the one-tenant office space on 55M/54C floor. No change of use, egress, or occupancy. Filing M01381189-S1.

    06
  7. Alteration approved

    Filing M01381189-S1 reached an approved status.

    07
  8. Alteration filed

    Interior removals work at 14m/13c partial floor including partition, ceiling and door removals as per plans (suites 1420/1440). no change in use, egress or occupancy. Filing M01415816-I1.

    08
  9. Alteration approved

    Filing M01415816-I1 reached an approved status.

    09
  10. Permit recorded for alteration

    DOB lists a first permit date for M01381189-S1. That is not by itself confirmation of activity on site.

    010
  11. Permit recorded for alteration

    DOB lists a first permit date for M01415816-I1. That is not by itself confirmation of activity on site.

    011
  12. Alteration now approved

    The latest status recorded for M01415816-I1 is “Permit Entire.”

    012
  13. Alteration filed

    Renovation of existing business occupancy, office use, in multi-tenant building on the 22nd floor. Work to include new secure entry vestibule, new workstations, new finishes. No change to use, egress or occupancy. Filing M01430546-I1.

    013
  14. Alteration filed

    New water source heat pump for 22nd floor office and associated air distribution systems. Filing M01430546-S1.

    014
  15. Alteration now under review

    The latest status recorded for M01430546-S1 is “Objections.”

    015
  16. Alteration filed

    Temp. loop sprinkler system associated with the interior removals work on the 16m/15c floor to include partition, ceiling and door removals as per plans. no change in use, egress, or occupancy. Filing M08036055-S1.

    016
  17. Alteration now under review

    The latest status recorded for M01430546-I1 is “Plan Examiner Review.”

    017
  18. Alteration approved

    Filing M08036055-S1 reached an approved status.

    018
  19. Alteration now approved

    The latest status recorded for M08036055-S1 is “Approved.”

    019
  20. Alteration now approved

    The latest status recorded for M08025345-I1 is “Permit Entire.”

    020
  21. Alteration now approved

    The latest status recorded for M01381189-S1 is “Permit Entire.”

    021
  22. Alteration now approved

    The latest status recorded for M01032218-I1 is “Permit Entire.”

    022