DOB filing M01442695-S3
Alteration filing at 530 5 Avenue
Building record · BIN 1034227
530 5 Avenue, Manhattan, NY 10036
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 10 independently sourced records, including 9 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1034227
530 5 Avenue
Midtown-Times Square, Manhattan
A consolidated public-record view · updated Nov 5, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 26-story condominium built in 1957, on a 27,614 sq ft lot.
The apartments
61 condominium apartments are assessed on this block, and the typical one is 793 sq ft (74 m²). They run from 50 to 292 m².
The city values the typical one at $362,687. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.
What it sold for
2 apartments on this tax block changed hands in the year the city last published, at a median of $1,170,988.
Recorded sale prices from the Department of Finance’s rolling file, covering the year to Sep 30, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.
Owner of record
ARC NYC1140SIXTH, LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 7, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 7 open notices on record for this building, out of 192 notices on file; the most recent was issued Oct 27, 2021.
Issued Oct 27, 2021
Issued Oct 27, 2021
Issued Oct 27, 2021
4 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 5, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1034227. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 10 alteration filing. Its latest status categories are 9 approved, 1 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 530 5 Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 10 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
6th floor MER--Removal and Installation of mechanical unit air handler unit with related ductwork and piping. No change to use, egress or occupancy. Filing M01252304-I1.
Filing M01252304-I1 reached an approved status.
DOB lists a first permit date for M01252304-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for M01252304-I1.
The latest status recorded for M01252304-I1 is “LOC Issued.”
Mjff -- modifications to existing sprinkler system in conjuction with office buildout. Filing M01434633-S3.
Filing M01434633-S3 reached an approved status.
Mjff -- plumbing modifications and installations for office buildout as per plans filed. Filing M01434633-S2.
Filing M01434633-S2 reached an approved status.
Mjff -- mechanical modifications and installations in conjunction with office buildout. Filing M01434633-S1.
Filing M01434633-S1 reached an approved status.
Mjff -- structural work for new slab opening, new access stair, and operable partition support as per plans filed. no change to use, egress, or occupancy. Filing M01434633-S4.
Filing M01434633-S4 reached an approved status.
Mjff--general construction inclusive of interior partitions installation as per plans filed. no change to use, egress, or occupancy. Filing M01434633-I1.
Filing M01434633-I1 reached an approved status.
DOB lists a first permit date for M01434633-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01434633-I1 is “Permit Entire.”
DOB lists a first permit date for M01434633-S1. That is not by itself confirmation of activity on site.
The latest status recorded for M01434633-S1 is “Permit Entire.”
DOB lists a first permit date for M01434633-S4. That is not by itself confirmation of activity on site.
The latest status recorded for M01434633-S4 is “Permit Entire.”
DOB lists a first permit date for M01434633-S2. That is not by itself confirmation of activity on site.
The latest status recorded for M01434633-S2 is “Permit Entire.”
DOB lists a first permit date for M01434633-S3. That is not by itself confirmation of activity on site.
The latest status recorded for M01434633-S3 is “Permit Entire.”
18th floor tenant pre-build -- modification to existing sprinkler system for office buildout. Filing M01442695-S3.
18th floor tenant pre-build-- plumbing modifications and installations for office buildout. Filing M01442695-S2.
18th floor tenant pre-build-- General construction including installation of interior partitions as per plans filed herewith. No change to use, egress, or occupancy. Filing M01442695-I1.
18th floor tenant pre-build -- mechanical modifications and installations for office buildout. Filing M01442695-S1.
Filing M01442695-I1 reached an approved status.
DOB lists a first permit date for M01442695-S1. That is not by itself confirmation of activity on site.
The latest status recorded for M01442695-S1 is “Permit Entire.”
Filing M01442695-S3 reached an approved status.
Filing M01442695-S2 reached an approved status.
The latest status recorded for M01442695-I1 is “Approved.”
DOB lists a first permit date for M01442695-S3. That is not by itself confirmation of activity on site.
The latest status recorded for M01442695-S3 is “Permit Entire.”
DOB lists a first permit date for M01442695-S2. That is not by itself confirmation of activity on site.
The latest status recorded for M01442695-S2 is “Permit Entire.”