Building record · BIN 1034830

718 Fifth Avenue

718 Fifth Avenue, Manhattan, NY 10019

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 14 independently sourced records, including 14 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 1034830

718 Fifth Avenue

Midtown-Times Square, Manhattan

A consolidated public-record view · updated Oct 23, 2026

DOB filings
14
Active-status
14
Recorded addresses
2
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings14
Open or active-status records14
First included filingJan 21, 2025
Latest recorded changeOct 23, 2026

The lot

What is already here?

The lot holds a 5-story office building built in 1937, on a 2,700 sq ft lot.

  1. Floors 2–5Nothing on record
  2. Floor 1Street levelStreet level. The lot is recorded as commercial and office, so this floor is where the commercial space is.
  • Street levelCommercial and office
  • Above the southern skylineFrom about floor 68 — the tallest thing within 60 m to the south is 202.7 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 193.9 m over 5 floors, as the city counts them. 1 run of floors has something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1937
Floors
5
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C5-3
Lot area
2,700 sq ft
Building area
16,200 sq ft

The apartments

206 condominium apartments are assessed on this block, and the typical one is 699 sq ft (65 m²). They run from 37 to 112 m².

The city values the typical one at $233,565. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.

What it sold for

12 apartments on this tax block changed hands in the year the city last published, at a median of $760,000, from 515,000 to 2,000,000.

Recorded sale prices from the Department of Finance’s rolling file, covering the year to Sep 30, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.

Owner of record

54 62 WEST 56 REALTY

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 27, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

No open violations are recorded for this building. 23 notices are on file, all with a recorded resolution.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 27, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1034830. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 14 alteration filing. Its latest status categories are 14 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Jan 21, 2025
Latest recorded change
Oct 23, 2026
Highest proposed story count
6 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 718 Fifth Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 14 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Modifications to the existing plumbing system on the 3rd floor (Harry Winston - Office Fit-out) as per plans. No change to use, egress or occupancy. Filing M01134236-I1.

    01
  2. Alteration approved

    Filing M01134236-I1 reached an approved status.

    02
  3. Permit recorded for alteration

    DOB lists a first permit date for M01134236-I1. That is not by itself confirmation of activity on site.

    03
  4. Alteration filed

    Heavy duty sidewalk shed during bldg alteration under application# m01134202 & m01092093, filed sep. sidewalk shed shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M01223540-I1.

    04
  5. Permit recorded for alteration

    DOB lists a first permit date for M01223540-I1. That is not by itself confirmation of activity on site.

    05
  6. Alteration filed

    Construction fence as per drawings. construction fence shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. dot permits by others for fence on sidewalk / roadway. Filing M01223551-I1.

    06
  7. Permit recorded for alteration

    DOB lists a first permit date for M01223551-I1. That is not by itself confirmation of activity on site.

    07
  8. Alteration filed

    Temporary system scaffold as per drawings. system scaffold shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M01259685-I1.

    08
  9. Alteration filed

    Temporary monorail system as per drawings. monorail system shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M01259711-I1.

    09
  10. Permit recorded for alteration

    DOB lists a first permit date for M01259685-I1. That is not by itself confirmation of activity on site.

    010
  11. Permit recorded for alteration

    DOB lists a first permit date for M01259711-I1. That is not by itself confirmation of activity on site.

    011
  12. Alteration filed

    Equipment use: single 5300 # capacity personnel hoist during bldg alteration, filed sep. hoist shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. elevator application submitted separately. Filing M01223540-S1.

    012
  13. Alteration filed

    Temporary hoist run-back structure during bldg alteration, filed separately. run-back structure shall comply with ch #33 of the NYC bldg code. no change in use, occupancy or egress under this application. hoist & elevator appl submitted sep. Filing M01223540-S2.

    013
  14. Permit recorded for alteration

    DOB lists a first permit date for M01223540-S1. That is not by itself confirmation of activity on site.

    014
  15. Permit recorded for alteration

    DOB lists a first permit date for M01223540-S2. That is not by itself confirmation of activity on site.

    015
  16. Alteration filed

    Removal of travertine veneer. removal and replacement of masonry backup wall at 2nd through 5th floors. no change to use, egress or occupancy. Filing M01265692-I1.

    016
  17. Alteration approved

    Filing M01265692-I1 reached an approved status.

    017
  18. Permit recorded for alteration

    DOB lists a first permit date for M01265692-I1. That is not by itself confirmation of activity on site.

    018
  19. Alteration filed

    Temporary debris chute as per drawings. debris chute shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M01223540-S3.

    019
  20. Permit recorded for alteration

    DOB lists a first permit date for M01223540-S3. That is not by itself confirmation of activity on site.

    020
  21. Alteration filed

    Modifications to the existing plumbing system on the 3rd floor (Harry Winston - Office Fit-out) as per plans. No change to use, egress or occupancy. Filing M01134236-P4.

    021
  22. Alteration now approved

    The latest status recorded for M01134236-I1 is “Permit Entire.”

    022
  23. Alteration approved

    Filing M01134236-P4 reached an approved status.

    023
  24. Alteration now approved

    The latest status recorded for M01134236-P4 is “Approved.”

    024
  25. Alteration filed

    Storage of material / equipment on top of heavy duty sidewalk shed. storage shall not exceed 100 psf. shed filed under separate application. storage shall comply with ch#33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M01223540-S4.

    025
  26. Alteration filed

    Equipment use: single 5300 # capacity personnel hoist during bldg alteration, filed sep. hoist shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. elevator application submitted separately. Filing M01223540-P7.

    026
  27. Permit recorded for alteration

    DOB lists a first permit date for M01223540-S4. That is not by itself confirmation of activity on site.

    027
  28. Alteration now approved

    The latest status recorded for M01223540-S4 is “Permit Entire.”

    028
  29. Alteration approved

    Filing M01223540-P7 reached an approved status.

    029
  30. Alteration now approved

    The latest status recorded for M01223540-P7 is “Approved.”

    030
  31. Alteration now approved

    The latest status recorded for M01223540-S1 is “Permit Entire.”

    031
  32. Alteration now approved

    The latest status recorded for M01259711-I1 is “Permit Entire.”

    032
  33. Alteration now approved

    The latest status recorded for M01223540-S2 is “Permit Entire.”

    033
  34. Alteration now approved

    The latest status recorded for M01223551-I1 is “Permit Entire.”

    034
  35. Alteration filed

    Temporary debris chute as per drawings. debris chute shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M01223540-P8.

    035
  36. Alteration filed

    Temporary system scaffold as per drawings. system scaffold shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M01259685-P4.

    036
  37. Alteration now approved

    The latest status recorded for M01223540-I1 is “Permit Entire.”

    037
  38. Alteration approved

    Filing M01223540-P8 reached an approved status.

    038
  39. Alteration now approved

    The latest status recorded for M01223540-P8 is “Approved.”

    039
  40. Alteration approved

    Filing M01259685-P4 reached an approved status.

    040
  41. Alteration now approved

    The latest status recorded for M01259685-P4 is “Approved.”

    041
  42. Alteration now approved

    The latest status recorded for M01223540-S3 is “Permit Entire.”

    042
  43. Alteration now approved

    The latest status recorded for M01259685-I1 is “Permit Entire.”

    043
  44. Alteration now approved

    The latest status recorded for M01265692-I1 is “Permit Entire.”

    044