DOB filing M01223551-I1
Alteration filing at 718 5 Avenue
Building record · BIN 1034830
718 5 Avenue, Manhattan, NY 10019
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 10 independently sourced records, including 10 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1034830
718 5 Avenue
Midtown-Times Square, Manhattan
A consolidated public-record view · updated Sep 18, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 5-story office building built in 1937, on a 2,700 sq ft lot.
The apartments
206 condominium apartments are assessed on this block, and the typical one is 699 sq ft (65 m²). They run from 37 to 112 m².
The city values the typical one at $233,565. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.
What it sold for
12 apartments on this tax block changed hands in the year the city last published, at a median of $800,000, from 555,000 to 2,000,000.
Recorded sale prices from the Department of Finance’s rolling file, covering the year to Aug 31, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.
Owner of record
54 62 WEST 56 REALTY
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 22, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
No open violations are recorded for this building. 23 notices are on file, all with a recorded resolution.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 20, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1034830. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 10 alteration filing. Its latest status categories are 10 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 718 5 Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 10 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Modifications to the existing plumbing system on the 3rd floor (Harry Winston - Office Fit-out) as per plans. No change to use, egress or occupancy. Filing M01134236-I1.
Filing M01134236-I1 reached an approved status.
DOB lists a first permit date for M01134236-I1. That is not by itself confirmation of activity on site.
Construction fence as per drawings. construction fence shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. dot permits by others for fence on sidewalk / roadway. Filing M01223551-I1.
DOB lists a first permit date for M01223551-I1. That is not by itself confirmation of activity on site.
Temporary system scaffold as per drawings. system scaffold shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M01259685-I1.
Temporary monorail system as per drawings. monorail system shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M01259711-I1.
DOB lists a first permit date for M01259685-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01259711-I1. That is not by itself confirmation of activity on site.
Equipment use: single 5300 # capacity personnel hoist during bldg alteration, filed sep. hoist shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. elevator application submitted separately. Filing M01223540-S1.
Temporary hoist run-back structure during bldg alteration, filed separately. run-back structure shall comply with ch #33 of the NYC bldg code. no change in use, occupancy or egress under this application. hoist & elevator appl submitted sep. Filing M01223540-S2.
DOB lists a first permit date for M01223540-S1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01223540-S2. That is not by itself confirmation of activity on site.
Temporary debris chute as per drawings. debris chute shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M01223540-S3.
DOB lists a first permit date for M01223540-S3. That is not by itself confirmation of activity on site.
Modifications to the existing plumbing system on the 3rd floor (Harry Winston - Office Fit-out) as per plans. No change to use, egress or occupancy. Filing M01134236-P4.
The latest status recorded for M01134236-I1 is “Permit Entire.”
Filing M01134236-P4 reached an approved status.
The latest status recorded for M01134236-P4 is “Approved.”
Storage of material / equipment on top of heavy duty sidewalk shed. storage shall not exceed 100 psf. shed filed under separate application. storage shall comply with ch#33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M01223540-S4.
Equipment use: single 5300 # capacity personnel hoist during bldg alteration, filed sep. hoist shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. elevator application submitted separately. Filing M01223540-P7.
DOB lists a first permit date for M01223540-S4. That is not by itself confirmation of activity on site.
The latest status recorded for M01223540-S4 is “Permit Entire.”
Filing M01223540-P7 reached an approved status.
The latest status recorded for M01223540-P7 is “Approved.”
The latest status recorded for M01223540-S1 is “Permit Entire.”
The latest status recorded for M01223540-S3 is “Permit Entire.”
The latest status recorded for M01259685-I1 is “Permit Entire.”
The latest status recorded for M01259711-I1 is “Permit Entire.”
The latest status recorded for M01223540-S2 is “Permit Entire.”
The latest status recorded for M01223551-I1 is “Permit Entire.”