Building record · BIN 1035071

9 West 57 Street

9 West 57 Street, Manhattan, NY 10019

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 48 independently sourced records, including 37 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 1035071

9 West 57 Street

Midtown-Times Square, Manhattan

A consolidated public-record view · updated Nov 11, 2026

DOB filings
48
Active-status
37
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings48
Open or active-status records37
First included filingSep 18, 2024
Latest recorded changeNov 11, 2026

The lot

What is already here?

The lot holds a 49-story office building built in 1971, on a 62,058 sq ft lot.

  1. Floors 20–49Above the southern skylineAbove the tallest building within sixty metres to the south, which stands 57.6 m. Nothing on that side reaches this floor.
  2. Floors 2–19Nothing on record
  3. Floor 1Street levelStreet level. The lot is recorded as commercial and office, so this floor is where the commercial space is.
  • Street levelCommercial and office
  • Above the southern skylineFrom about floor 20 — the tallest thing within 60 m to the south is 57.6 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 204.8 m over 49 floors, as the city counts them. 2 runs of floors have something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1971
Floors
49
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C5-2.5
Lot area
62,058 sq ft
Building area
1,698,259 sq ft

The apartments

336 condominium apartments are assessed on this block, and the typical one is 925 sq ft (86 m²). They run from 43 to 180 m².

The city values the typical one at $312,270. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.

What it sold for

9 apartments on this tax block changed hands in the year the city last published, at a median of $1,060,000, from 275,000 to 1,850,000.

Recorded sale prices from the Department of Finance’s rolling file, covering the year to Sep 30, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.

Owner of record

BOB 57 DEVELOPMENT LLC

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 13, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

No open violations are recorded for this building. 261 notices are on file, all with a recorded resolution.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 13, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1035071. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 48 alteration filing. Its latest status categories are 33 approved, 4 under review, 11 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Sep 18, 2024
Latest recorded change
Nov 11, 2026
Highest proposed story count
50 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 9 West 57 Street.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 48 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Removal and installation of interior non bearing partitions and related finishes as per drawings. No change to use, egress or occupancy. Filing M01086430-I1.

    01
  2. Alteration approved

    Filing M01086430-I1 reached an approved status.

    02
  3. Permit recorded for alteration

    DOB lists a first permit date for M01086430-I1. That is not by itself confirmation of activity on site.

    03
  4. Alteration filed

    Application filed for non-structural demolition and general construction as shown on plans. Filing M01087107-I1.

    04
  5. Alteration filed

    Modification of sprinkler system. Filing M01087107-S2.

    05
  6. Alteration filed

    Mechanical work as shown on plans. Filing M01087107-S1.

    06
  7. Alteration approved

    Filing M01087107-I1 reached an approved status.

    07
  8. Permit recorded for alteration

    DOB lists a first permit date for M01087107-I1. That is not by itself confirmation of activity on site.

    08
  9. Alteration approved

    Filing M01087107-S1 reached an approved status.

    09
  10. Permit recorded for alteration

    DOB lists a first permit date for M01087107-S1. That is not by itself confirmation of activity on site.

    010
  11. Alteration approved

    Filing M01087107-S2 reached an approved status.

    011
  12. Permit recorded for alteration

    DOB lists a first permit date for M01087107-S2. That is not by itself confirmation of activity on site.

    012
  13. Alteration filed

    General construction taking place on 25th floor construction (26th floor marketing) as per plans filed hrewith. no change in use, egress, or occupancy. Filing M01215056-I1.

    013
  14. Alteration filed

    Mechanical modifications taking place on 25th fl construction (26th fl marketing) as per plans filed herewith. no change in use, egress, or occupancy. Filing M01247313-I1.

    014
  15. Alteration filed

    Plumbing modifications taking place on 25th fl construction (26th mkt) as per plans filed herewith. no change in use, egress, or occupancy. Filing M01247314-I1.

    015
  16. Alteration approved

    Filing M01247314-I1 reached an approved status.

    016
  17. Alteration approved

    Filing M01215056-I1 reached an approved status.

    017
  18. Alteration approved

    Filing M01247313-I1 reached an approved status.

    018
  19. Permit recorded for alteration

    DOB lists a first permit date for M01247313-I1. That is not by itself confirmation of activity on site.

    019
  20. Permit recorded for alteration

    DOB lists a first permit date for M01215056-I1. That is not by itself confirmation of activity on site.

    020
  21. Permit recorded for alteration

    DOB lists a first permit date for M01247314-I1. That is not by itself confirmation of activity on site.

    021
  22. Alteration filed

    Removal and construction of interior partitions, doors and ceilings as shown on drawings. No change in use, egress or occupancy. Filing M01269619-I1.

    022
  23. Alteration approved

    Filing M01269619-I1 reached an approved status.

    023
  24. Permit recorded for alteration

    DOB lists a first permit date for M01269619-I1. That is not by itself confirmation of activity on site.

    024
  25. Alteration filed

    Modification/addition to existing HVAC and associated ductwork/piping as shown on plans filed herewith. No change to use, occupancy or egress. Filing M01269619-S1.

    025
  26. Alteration filed

    Standpipe modifications taking place on 25th floor construction (26th mkt) as per plans filed herewith. no change in use, egress, or occupancy. Filing M01282295-I1.

    026
  27. Alteration approved

    Filing M01282295-I1 reached an approved status.

    027
  28. Alteration approved

    Filing M01269619-S1 reached an approved status.

    028
  29. Permit recorded for alteration

    DOB lists a first permit date for M01269619-S1. That is not by itself confirmation of activity on site.

    029
  30. Permit recorded for alteration

    DOB lists a first permit date for M01282295-I1. That is not by itself confirmation of activity on site.

    030
  31. Alteration filed

    Sprinkler modifications taking place on 48th floor construction (49th floor marketing) as per plans filed herewith. no change in use, egress, or occupancy. Filing M01304817-I1.

    031
  32. Alteration filed

    General construction taking place on 48th floor construction (49th floor marketing) as per plans filed hrewith. no change in use, egress, or occupancy. Filing M01304787-I1.

    032
  33. Alteration approved

    Filing M01304787-I1 reached an approved status.

    033
  34. Alteration approved

    Filing M01304817-I1 reached an approved status.

    034
  35. Permit recorded for alteration

    DOB lists a first permit date for M01304787-I1. That is not by itself confirmation of activity on site.

    035
  36. Alteration filed

    Modification/addition to sprinkler system and related piping as shown on drawings, No change in use, egress or occupancy. Filing M01269619-S3.

    036
  37. Alteration approved

    Filing M01269619-S3 reached an approved status.

    037
  38. Permit recorded for alteration

    DOB lists a first permit date for M01269619-S3. That is not by itself confirmation of activity on site.

    038
  39. Alteration filed

    Interior renovation of partitions, ceilings and doors for existing office space including infill of existing stair opening to separate the 46th and 47th floors. No change in use, egress or occupancy. Filing M01364057-I1.

    039
  40. Alteration approved

    Filing M01364057-I1 reached an approved status.

    040
  41. Permit recorded for alteration

    DOB lists a first permit date for M01364057-I1. That is not by itself confirmation of activity on site.

    041
  42. Alteration filed

    Structural modifications including concrete on metal deck infill at existing stair opening. No change in use, egress or occupancy. Filing M01364057-S3.

    042
  43. Alteration filed

    Modifications to existing HVAC system and ductwork including installation of new AC units. No change in use, egress or occupancy. Filing M01364057-S1.

    043
  44. Alteration approved

    Filing M01364057-S1 reached an approved status.

    044
  45. Alteration filed

    Modifications to SP system and related piping for existing office space. No change in use, egress or occupancy. Filing M01364057-S2.

    045
  46. Alteration approved

    Filing M01364057-S2 reached an approved status.

    046
  47. Permit recorded for alteration

    DOB lists a first permit date for M01364057-S1. That is not by itself confirmation of activity on site.

    047
  48. Alteration approved

    Filing M01364057-S3 reached an approved status.

    048
  49. Permit recorded for alteration

    DOB lists a first permit date for M01364057-S3. That is not by itself confirmation of activity on site.

    049
  50. Permit recorded for alteration

    DOB lists a first permit date for M01304817-I1. That is not by itself confirmation of activity on site.

    050
  51. Permit recorded for alteration

    DOB lists a first permit date for M01364057-S2. That is not by itself confirmation of activity on site.

    051
  52. Alteration filed

    Plumbing modifications taking place on cellar as per plans filed herewith. no change in use, egress, or occupancy. Filing M01434745-I1.

    052
  53. Alteration filed

    Sprinkler modifications taking place on cellar as per plans filed herewith. no change in use, egress, or occupancy. Filing M01434748-I1.

    053
  54. Alteration approved

    Filing M01434745-I1 reached an approved status.

    054
  55. Alteration approved

    Filing M01434748-I1 reached an approved status.

    055
  56. Alteration filed

    Interior renovation of partitions, ceilings and doors for existing office space including infill of existing stair opening to separate the 46th and 47th floors. No change in use, egress or occupancy. Filing M01364057-P1.

    056
  57. Alteration filed

    Sprinkler modifications taking place on 47th floor construction (48th floor marketing) as per plans filed herewith. no change in use, egress, or occupancy. Filing M01445461-I1.

    057
  58. Alteration filed

    General construction taking place on 47th floor construction (48th floor marketing) as per plans filed hrewith. no change in use, egress, or occupancy. Filing M01445436-I1.

    058
  59. Alteration filed

    Modifications to existing HVAC system and ductwork including installation of new AC units. No change in use, egress or occupancy. Filing M01364057-P2.

    059
  60. Alteration filed

    Modifications to SP system and related piping for existing office space. No change in use, egress or occupancy. Filing M01364057-P3.

    060
  61. Alteration approved

    Filing M01364057-P2 reached an approved status.

    061
  62. Alteration now approved

    The latest status recorded for M01364057-P2 is “Approved.”

    062
  63. Alteration now approved

    The latest status recorded for M01364057-S2 is “Permit Entire.”

    063
  64. Alteration approved

    Filing M01364057-P3 reached an approved status.

    064
  65. Alteration now approved

    The latest status recorded for M01364057-P3 is “Approved.”

    065
  66. Alteration approved

    Filing M01445436-I1 reached an approved status.

    066
  67. Permit recorded for alteration

    DOB lists a first permit date for M01445436-I1. That is not by itself confirmation of activity on site.

    067
  68. Alteration now approved

    The latest status recorded for M01445436-I1 is “Permit Entire.”

    068
  69. Alteration approved

    Filing M01445461-I1 reached an approved status.

    069
  70. Permit recorded for alteration

    DOB lists a first permit date for M01445461-I1. That is not by itself confirmation of activity on site.

    070
  71. Alteration now approved

    The latest status recorded for M01445461-I1 is “Permit Entire.”

    071
  72. Alteration approved

    Filing M01364057-P1 reached an approved status.

    072
  73. Alteration now approved

    The latest status recorded for M01364057-P1 is “Approved.”

    073
  74. Alteration signed off

    DOB recorded a sign-off for M01086430-I1.

    074
  75. Alteration now completed

    The latest status recorded for M01086430-I1 is “LOC Issued.”

    075
  76. Alteration filed

    Sprinkler modifications taking place on 44th floor construction (45th floor marketing) as per plans filed herewith. no change in use, egress, or occupancy. Filing M01452803-I1.

    076
  77. Alteration filed

    Mechanical modifications taking place on 44th floor construction (45th floor marketing) as per plans filed herewith. no change in use, egress, or occupancy. Filing M01452799-I1.

    077
  78. Alteration approved

    Filing M01452799-I1 reached an approved status.

    078
  79. Alteration filed

    General construction taking place on 44th floor construction (45th floor marketing) as per plans filed hrewith. no change in use, egress, or occupancy. Filing M01452794-I1.

    079
  80. Alteration approved

    Filing M01452794-I1 reached an approved status.

    080
  81. Alteration approved

    Filing M01452803-I1 reached an approved status.

    081
  82. Permit recorded for alteration

    DOB lists a first permit date for M01452799-I1. That is not by itself confirmation of activity on site.

    082
  83. Alteration now approved

    The latest status recorded for M01452799-I1 is “Permit Entire.”

    083
  84. Permit recorded for alteration

    DOB lists a first permit date for M01452794-I1. That is not by itself confirmation of activity on site.

    084
  85. Alteration now approved

    The latest status recorded for M01452794-I1 is “Permit Entire.”

    085
  86. Alteration now approved

    The latest status recorded for M01269619-I1 is “Permit Entire.”

    086
  87. Alteration now approved

    The latest status recorded for M01269619-S1 is “Permit Entire.”

    087
  88. Permit recorded for alteration

    DOB lists a first permit date for M01434748-I1. That is not by itself confirmation of activity on site.

    088
  89. Alteration now approved

    The latest status recorded for M01434748-I1 is “Permit Entire.”

    089
  90. Alteration signed off

    DOB recorded a sign-off for M01247314-I1.

    090
  91. Alteration now completed

    The latest status recorded for M01247314-I1 is “LOC Issued.”

    091
  92. Alteration filed

    Structural modifications taking place 44th & 45th fl construction (45th & 46th fl marketing) as per plans filed herewith. no change in use, egress, or occupancy. Filing M01464307-I1.

    092
  93. Alteration filed

    General construction taking place on 29th floor construction (30th floor marketing) as per plans filed hrewith. no change in use, egress, or occupancy. Filing M01468121-I1.

    093
  94. Alteration filed

    Mechanical modifications taking place on 29th floor construction (30th floor marketing) as per plans filed herewith. no change in use, egress, or occupancy. Filing M01468450-I1.

    094
  95. Alteration filed

    Plumbing modifications taking place on 29th floor constructon (30th floor marketing) as per plans filed herewith. no change in use, egress, or occupancy. Filing M01468454-I1.

    095
  96. Alteration filed

    Sprinkler modifications taking place on 44th & 45th floor construction (45th & 46th floor marketing) as per plans filed herewith. no change in use, egress, or occupancy. Filing M01464297-I1.

    096
  97. Alteration filed

    Sprinkler modifications taking place on 29th floor construction (30th floor marketing) as per plans filed herewith. no change in use, egress, or occupancy. Filing M01468456-I1.

    097
  98. Alteration filed

    General construction taking place on 44th & 45th floor construction (45th & 46th floor marketing) as per plans filed hrewith. no change in use, egress, or occupancy. Filing M01464284-I1.

    098
  99. Alteration approved

    Filing M01468454-I1 reached an approved status.

    099
  100. Permit recorded for alteration

    DOB lists a first permit date for M01452803-I1. That is not by itself confirmation of activity on site.

    0100
  101. Alteration now approved

    The latest status recorded for M01452803-I1 is “Permit Entire.”

    0101
  102. Alteration signed off

    DOB recorded a sign-off for M01304817-I1.

    0102
  103. Alteration now completed

    The latest status recorded for M01304817-I1 is “LOC Issued.”

    0103
  104. Alteration signed off

    DOB recorded a sign-off for M01304787-I1.

    0104
  105. Alteration now completed

    The latest status recorded for M01304787-I1 is “LOC Issued.”

    0105
  106. Alteration approved

    Filing M01464307-I1 reached an approved status.

    0106
  107. Alteration approved

    Filing M01464284-I1 reached an approved status.

    0107
  108. Alteration approved

    Filing M01468121-I1 reached an approved status.

    0108
  109. Alteration approved

    Filing M01468450-I1 reached an approved status.

    0109
  110. Alteration approved

    Filing M01464297-I1 reached an approved status.

    0110
  111. Alteration now approved

    The latest status recorded for M01464297-I1 is “Approved.”

    0111
  112. Alteration signed off

    DOB recorded a sign-off for M01247313-I1.

    0112
  113. Alteration now completed

    The latest status recorded for M01247313-I1 is “LOC Issued.”

    0113
  114. Alteration approved

    Filing M01468456-I1 reached an approved status.

    0114
  115. Alteration now approved

    The latest status recorded for M01468456-I1 is “Approved.”

    0115
  116. Alteration signed off

    DOB recorded a sign-off for M01087107-I1.

    0116
  117. Alteration now completed

    The latest status recorded for M01087107-I1 is “LOC Issued.”

    0117
  118. Alteration signed off

    DOB recorded a sign-off for M01087107-S2.

    0118
  119. Alteration now completed

    The latest status recorded for M01087107-S2 is “LOC Issued.”

    0119
  120. Alteration now approved

    The latest status recorded for M01087107-S1 is “Permit Entire.”

    0120
  121. Permit recorded for alteration

    DOB lists a first permit date for M01468121-I1. That is not by itself confirmation of activity on site.

    0121
  122. Alteration now approved

    The latest status recorded for M01468121-I1 is “Permit Entire.”

    0122
  123. Permit recorded for alteration

    DOB lists a first permit date for M01468450-I1. That is not by itself confirmation of activity on site.

    0123
  124. Alteration now approved

    The latest status recorded for M01468450-I1 is “Permit Entire.”

    0124
  125. Permit recorded for alteration

    DOB lists a first permit date for M01468454-I1. That is not by itself confirmation of activity on site.

    0125
  126. Alteration now approved

    The latest status recorded for M01468454-I1 is “Permit Entire.”

    0126
  127. Permit recorded for alteration

    DOB lists a first permit date for M01434745-I1. That is not by itself confirmation of activity on site.

    0127
  128. Alteration now approved

    The latest status recorded for M01434745-I1 is “Permit Entire.”

    0128
  129. Permit recorded for alteration

    DOB lists a first permit date for M01464307-I1. That is not by itself confirmation of activity on site.

    0129
  130. Alteration now approved

    The latest status recorded for M01464307-I1 is “Permit Entire.”

    0130
  131. Permit recorded for alteration

    DOB lists a first permit date for M01464284-I1. That is not by itself confirmation of activity on site.

    0131
  132. Alteration now approved

    The latest status recorded for M01464284-I1 is “Permit Entire.”

    0132
  133. Alteration filed

    Interior demo for the cellar and exterior demo for the osp as per plans filed herewith. no change in use, egress, or occupancy. Filing M01479230-I1.

    0133
  134. Alteration signed off

    DOB recorded a sign-off for M01215056-I1.

    0134
  135. Alteration now completed

    The latest status recorded for M01215056-I1 is “LOC Issued.”

    0135
  136. Alteration now approved

    The latest status recorded for M01269619-S3 is “Permit Entire.”

    0136
  137. Alteration approved

    Filing M01479230-I1 reached an approved status.

    0137
  138. Alteration now approved

    The latest status recorded for M01364057-I1 is “Permit Entire.”

    0138
  139. Alteration signed off

    DOB recorded a sign-off for M01364057-S1.

    0139
  140. Alteration now completed

    The latest status recorded for M01364057-S1 is “LOC Issued.”

    0140
  141. Alteration signed off

    DOB recorded a sign-off for M01364057-S3.

    0141
  142. Alteration now completed

    The latest status recorded for M01364057-S3 is “LOC Issued.”

    0142
  143. Alteration filed

    Plumbing modifications taking place on 49th floor constructon (50th floor marketing) as per plans filed herewith. no change in use, egress, or occupancy. Filing M01467367-I1.

    0143
  144. Alteration filed

    Mechanical modifications taking place on 49th floor construction (50th floor marketing) as per plans filed herewith. no change in use, egress, or occupancy. Filing M01467363-I1.

    0144
  145. Alteration filed

    General construction taking place on 49th floor construction (50th floor marketing) as per plans filed hrewith. no change in use, egress, or occupancy. Filing M01467353-I1.

    0145
  146. Alteration approved

    Filing M01467353-I1 reached an approved status.

    0146
  147. Alteration now approved

    The latest status recorded for M01479230-I1 is “Approved.”

    0147
  148. Alteration filed

    Sprinkler modifications taking place on 49th floor construction (50th floor marketing) as per plans filed herewith. no change in use, egress, or occupancy. Filing M01467370-I1.

    0148
  149. Alteration approved

    Filing M01467370-I1 reached an approved status.

    0149
  150. Alteration now approved

    The latest status recorded for M01467370-I1 is “Approved.”

    0150
  151. Alteration filed

    Plumbing demoliton on cel and osp as per plans filed herewith. no change in use, egress, or occupancy. Filing M01479986-I1.

    0151
  152. Alteration approved

    Filing M01467363-I1 reached an approved status.

    0152
  153. Alteration filed

    Mechanical modifications taking place on 49th floor construction (50th floor marketing) as per plans filed herewith. no change in use, egress, or occupancy. Filing M01467374-I1.

    0153
  154. Alteration filed

    General construction taking place on 49th floor construction (50th floor marketing) as per plans filed hrewith. no change in use, egress, or occupancy. Filing M01467373-I1.

    0154
  155. Alteration filed

    Sprinkler modifications taking place on 49th floor construction (50th floor marketing) as per plans filed herewith. no change in use, egress, or occupancy. Filing M01467382-I1.

    0155
  156. Alteration filed

    Plumbing modifications taking place on 49th floor constructon (50th floor marketing) as per plans filed herewith. no change in use, egress, or occupancy. Filing M01467380-I1.

    0156
  157. Permit recorded for alteration

    DOB lists a first permit date for M01467353-I1. That is not by itself confirmation of activity on site.

    0157
  158. Alteration now approved

    The latest status recorded for M01467353-I1 is “Permit Entire.”

    0158
  159. Alteration filed

    Mechanical modifications taking place on 49th floor construction (50th floor marketing) as per plans filed herewith. no change in use, egress, or occupancy. Filing M01475054-I1.

    0159
  160. Alteration filed

    General construction taking place on 49th floor construction (50th floor marketing) as per plans filed hrewith. no change in use, egress, or occupancy. Filing M01475046-I1.

    0160
  161. Alteration filed

    Plumbing modifications taking place on 49th floor constructon (50th floor marketing) as per plans filed herewith. no change in use, egress, or occupancy. Filing M01475061-I1.

    0161
  162. Alteration filed

    Sprinkler modifications taking place on 49th floor construction (50th floor marketing) as per plans filed herewith. no change in use, egress, or occupancy. Filing M01475066-I1.

    0162
  163. Alteration now under review

    The latest status recorded for M01467382-I1 is “Prof Cert QA Review.”

    0163
  164. Alteration now under review

    The latest status recorded for M01467380-I1 is “Prof Cert QA Review.”

    0164
  165. Alteration signed off

    DOB recorded a sign-off for M01282295-I1.

    0165
  166. Alteration now completed

    The latest status recorded for M01282295-I1 is “LOC Issued.”

    0166
  167. Alteration approved

    Filing M01467367-I1 reached an approved status.

    0167
  168. Permit recorded for alteration

    DOB lists a first permit date for M01467363-I1. That is not by itself confirmation of activity on site.

    0168
  169. Alteration now approved

    The latest status recorded for M01467363-I1 is “Permit Entire.”

    0169
  170. Alteration approved

    Filing M01467373-I1 reached an approved status.

    0170
  171. Alteration approved

    Filing M01475066-I1 reached an approved status.

    0171
  172. Alteration now approved

    The latest status recorded for M01475066-I1 is “Approved.”

    0172
  173. Alteration approved

    Filing M01475054-I1 reached an approved status.

    0173
  174. Alteration approved

    Filing M01475046-I1 reached an approved status.

    0174
  175. Alteration now under review

    The latest status recorded for M01475061-I1 is “Prof Cert QA Review.”

    0175
  176. Alteration approved

    Filing M01479986-I1 reached an approved status.

    0176
  177. Alteration now approved

    The latest status recorded for M01479986-I1 is “Approved.”

    0177
  178. Alteration now under review

    The latest status recorded for M01467374-I1 is “Prof Cert QA Review.”

    0178
  179. Alteration now approved

    The latest status recorded for M01467373-I1 is “Approved.”

    0179
  180. Alteration now approved

    The latest status recorded for M01475054-I1 is “Approved.”

    0180
  181. Alteration now approved

    The latest status recorded for M01475046-I1 is “Approved.”

    0181
  182. Alteration now approved

    The latest status recorded for M01467367-I1 is “Approved.”

    0182