Building record · BIN 1035318

285 Madison Avenue

285 Madison Avenue, Manhattan, NY 10017

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 7 independently sourced records, including 6 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 1035318

285 Madison Avenue

Midtown-Times Square, Manhattan

A consolidated public-record view · updated Sep 22, 2026

DOB filings
7
Active-status
6
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings7
Open or active-status records6
First included filingJan 16, 2026
Latest recorded changeSep 22, 2026

The lot

What is already here?

The lot holds a 25-story office building built in 1926, on a 21,887 sq ft lot.

  1. Floors 2–25Nothing on record
  2. Floor 1Street levelStreet level. The lot is recorded as commercial and office, so this floor is where the commercial space is.
  • Street levelCommercial and office
  • Above the southern skylineFrom about floor 53 — the tallest thing within 60 m to the south is 156.1 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 102.6 m over 25 floors, as the city counts them. 1 run of floors has something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1926
Last altered
2013
Floors
25
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C5-3
Lot area
21,887 sq ft
Building area
407,127 sq ft

Owner of record

461 FIFTH OWNER LLC

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 25, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 1 open notice on record for this building, out of 122 notices on file; the most recent was issued Nov 17, 2021.

  • Elevator

    Issued Nov 17, 2021

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 24, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1035318. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 7 alteration filing. Its latest status categories are 5 approved, 1 under review, 1 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Jan 16, 2026
Latest recorded change
Sep 22, 2026
Highest proposed story count
25 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 285 Madison Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 7 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Sprinkler modifications taking place on the 12th floor as per drawings filed herewith. no change in use, egress or occupancy. Filing M01306347-I1.

    01
  2. Alteration approved

    Filing M01306347-I1 reached an approved status.

    02
  3. Alteration filed

    Interior renovation existing commercial space with partition work on 1st floor and mezzaine. no change in use, egress or occupancy. Filing M01346664-I1.

    03
  4. Alteration approved

    Filing M01346664-I1 reached an approved status.

    04
  5. Permit recorded for alteration

    DOB lists a first permit date for M01346664-I1. That is not by itself confirmation of activity on site.

    05
  6. Alteration filed

    Plumbing modifications taking in the cellar, 1st floor and roof (cellar, lobby and roof 27th marketing) as per drawings filed herewith. no change in use, egress or occupancy. Filing M01363486-S2.

    06
  7. Alteration approved

    Filing M01363486-S2 reached an approved status.

    07
  8. Permit recorded for alteration

    DOB lists a first permit date for M01363486-S2. That is not by itself confirmation of activity on site.

    08
  9. Permit recorded for alteration

    DOB lists a first permit date for M01306347-I1. That is not by itself confirmation of activity on site.

    09
  10. Alteration filed

    Pl work on the 1st floor filed in conjunction with DOB now gc. no change to use, occupancy or egress. Filing M01351755-S1.

    010
  11. Alteration approved

    Filing M01351755-S1 reached an approved status.

    011
  12. Permit recorded for alteration

    DOB lists a first permit date for M01351755-S1. That is not by itself confirmation of activity on site.

    012
  13. Alteration signed off

    DOB recorded a sign-off for M01346664-I1.

    013
  14. Alteration now completed

    The latest status recorded for M01346664-I1 is “LOC Issued.”

    014
  15. Alteration now approved

    The latest status recorded for M01363486-S2 is “Permit Entire.”

    015
  16. Alteration filed

    Pl work on the 1st floor filed in conjunction with DOB now gc. no change to use, occupancy or egress. Filing M01351755-P4.

    016
  17. Alteration filed

    Mechanical work filed in conjunction with DOB now gc, sp and pl. no change to use, occupancy or egress. Filing M01351755-P3.

    017
  18. Alteration now under review

    The latest status recorded for M01351755-P3 is “Plan Examiner Review.”

    018
  19. Alteration approved

    Filing M01351755-P4 reached an approved status.

    019
  20. Alteration now approved

    The latest status recorded for M01351755-P4 is “Approved.”

    020
  21. Alteration now approved

    The latest status recorded for M01351755-S1 is “Permit Entire.”

    021
  22. Alteration now approved

    The latest status recorded for M01306347-I1 is “Permit Entire.”

    022
  23. Alteration filed

    Sprinkler modifications taking place on the 12th floor as per drawings filed herewith. no change in use, egress or occupancy. Filing M01306347-P1.

    023
  24. Alteration approved

    Filing M01306347-P1 reached an approved status.

    024
  25. Alteration now approved

    The latest status recorded for M01306347-P1 is “Approved.”

    025