DOB filing M01468413-I1
Alteration filing at 100 Park Avenue
Building record · BIN 1035319
100 Park Avenue, Manhattan, NY 10017
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 12 independently sourced records, including 8 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1035319
100 Park Avenue
Midtown-Times Square, Manhattan
A consolidated public-record view · updated Oct 13, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 36-story office building built in 1950, on a 37,196 sq ft lot.
Housing violations
1 violation is open against this address under the Housing Maintenance Code.
Open means the Department of Housing Preservation and Development has not recorded it as corrected, which is not the same as nobody having fixed it. The city publishes the apartment each was written against; that is not carried here, because a count says a building has a problem and an apartment number says whose.
Owner of record
461 FIFTH OWNER LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 15, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 2 open notices on record for this building, out of 208 notices on file; the most recent was issued Jun 17, 2011.
Issued Jun 17, 2011
Issued Jan 30, 1989
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 15, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1035319. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 12 alteration filing. Its latest status categories are 1 under review, 4 recorded as completed, 7 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 100 Park Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 12 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Mechanical changes as indicated on plans, including the installation of 2 Water Cooled Heat Pump Units. Filing M01198894-I1.
Plumbing Fixture changes as indicated on plans. Filing M01198894-S1.
Filing M01198894-I1 reached an approved status.
Filing M01198894-S1 reached an approved status.
Interior demo & reno of non-load bearing partitions, walls, ceiling & finishes as indicated on plans. Filing M01197668-I1.
Filing M01197668-I1 reached an approved status.
DOB lists a first permit date for M01197668-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01198894-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01198894-S1. That is not by itself confirmation of activity on site.
Modification to Sprinkler Systems as per plans filed herewith. No change in use, occupancy or egress. Filed in conjunction M01230120, M01235074. Filing M01235075-I1.
Filing M01235075-I1 reached an approved status.
DOB lists a first permit date for M01235075-I1. That is not by itself confirmation of activity on site.
Plumbing Fixture changes as indicated on plans. Filing M01342040-S1.
Sprinkler head & Temp Loop changes as indicated on plans. Filing M01342040-S2.
Filing M01342040-S2 reached an approved status.
Filing M01342040-S1 reached an approved status.
DOB lists a first permit date for M01342040-S1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01342040-S2. That is not by itself confirmation of activity on site.
The latest status recorded for M01342040-S2 is “Permit Entire.”
The latest status recorded for M01342040-S1 is “Permit Entire.”
DOB recorded a sign-off for M01235075-I1.
The latest status recorded for M01235075-I1 is “LOC Issued.”
Sprinkler head changes as indicated on plans. Filing M01448301-S2.
Mechanical changes as indicated on plans.. Filing M01448301-I1.
Plumbing Fixture changes as indicated on plans. Filing M01448301-S1.
Filing M01448301-S2 reached an approved status.
Filing M01448301-I1 reached an approved status.
Interior alterations as per plans. No change in use, egress or occupancy. Filing M01448174-I1.
Filing M01448301-S1 reached an approved status.
Filing M01448174-I1 reached an approved status.
DOB lists a first permit date for M01448301-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01448301-I1 is “Permit Entire.”
Mechanical changes as indicated on plans, including the installation of 2 Water Cooled Heat Pump Units. Filing M01198894-P2.
Filing M01198894-P2 reached an approved status.
The latest status recorded for M01198894-P2 is “Approved.”
DOB lists a first permit date for M01448301-S1. That is not by itself confirmation of activity on site.
The latest status recorded for M01448301-S1 is “Permit Entire.”
DOB lists a first permit date for M01448301-S2. That is not by itself confirmation of activity on site.
The latest status recorded for M01448301-S2 is “Permit Entire.”
DOB lists a first permit date for M01448174-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01448174-I1 is “Permit Entire.”
DOB recorded a sign-off for M01197668-I1.
The latest status recorded for M01197668-I1 is “LOC Issued.”
DOB recorded a sign-off for M01198894-S1.
The latest status recorded for M01198894-S1 is “LOC Issued.”
Installation of suspended scaffold for facade work or inspection. Filing M01468413-I1.
DOB recorded a sign-off for M01198894-I1.
The latest status recorded for M01198894-I1 is “LOC Issued.”
The latest status recorded for M01468413-I1 is “Plan Examiner Review.”