Building record · BIN 1035335

60 East 42 Street

60 East 42 Street, Manhattan, NY 10017

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 23 independently sourced records, including 14 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 1035335

60 East 42 Street

Midtown-Times Square, Manhattan

A consolidated public-record view · updated Sep 11, 2026

DOB filings
23
Active-status
14
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings23
Open or active-status records14
First included filingApr 2, 2024
Latest recorded changeSep 11, 2026

The lot

What is already here?

The lot holds a 55-story office building built in 1929, on a 42,050 sq ft lot.

Built
1929
Last altered
2016
Floors
55
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C5-3
Lot area
42,050 sq ft
Building area
1,150,564 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 13, 2026. They describe the tax lot, not any single filing.

Violation record

Are there open violations here?

The Department of Buildings has 5 open notices on record for this building, out of 311 notices on file; the most recent was issued Jan 31, 2013.

  • No report and / or late filing (facade)

    Issued Jan 31, 2013 — FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012

  • Elevator

    Issued Sep 16, 2010

  • Plumbing

    Issued Apr 9, 1999

  • 2 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 13, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1035335. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 23 alteration filing. Its latest status categories are 14 approved, 9 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Apr 2, 2024
Latest recorded change
Sep 11, 2026
Highest proposed story count
55 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 60 East 42 Street.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 23 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    General construction modifications taking place on the 17th floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M01023710-I1.

    01
  2. Alteration approved

    Filing M01023710-I1 reached an approved status.

    02
  3. Permit recorded for alteration

    DOB lists a first permit date for M01023710-I1. That is not by itself confirmation of activity on site.

    03
  4. Alteration filed

    Sprinkler modifications taking place on the 17th floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M01066922-I1.

    04
  5. Alteration approved

    Filing M01066922-I1 reached an approved status.

    05
  6. Permit recorded for alteration

    DOB lists a first permit date for M01066922-I1. That is not by itself confirmation of activity on site.

    06
  7. Alteration filed

    Sprinkler modifications taking place on the 13th floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M01082976-I1.

    07
  8. Alteration approved

    Filing M01082976-I1 reached an approved status.

    08
  9. Permit recorded for alteration

    DOB lists a first permit date for M01082976-I1. That is not by itself confirmation of activity on site.

    09
  10. Alteration filed

    General construction modifications taking place on the 17th floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M00987211-I1.

    010
  11. Alteration approved

    Filing M00987211-I1 reached an approved status.

    011
  12. Permit recorded for alteration

    DOB lists a first permit date for M00987211-I1. That is not by itself confirmation of activity on site.

    012
  13. Alteration filed

    Structural modifications taking place on the 19th and 20th floors as per plans filed herewith. no change in use, egress or occupancy. Filing M01081381-I1.

    013
  14. Alteration approved

    Filing M01081381-I1 reached an approved status.

    014
  15. Alteration filed

    Mechanical modifications taking place on the 13th floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M00946774-I1.

    015
  16. Alteration approved

    Filing M00946774-I1 reached an approved status.

    016
  17. Permit recorded for alteration

    DOB lists a first permit date for M01081381-I1. That is not by itself confirmation of activity on site.

    017
  18. Permit recorded for alteration

    DOB lists a first permit date for M00946774-I1. That is not by itself confirmation of activity on site.

    018
  19. Alteration filed

    General construction taking place on the 52nd floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M01269463-I1.

    019
  20. Alteration approved

    Filing M01269463-I1 reached an approved status.

    020
  21. Permit recorded for alteration

    DOB lists a first permit date for M01269463-I1. That is not by itself confirmation of activity on site.

    021
  22. Alteration filed

    Structural modifications taking place on the 5th floor as per plans filed herewith. no change in use, egress or occupancy. Filing M01296672-I1.

    022
  23. Alteration approved

    Filing M01296672-I1 reached an approved status.

    023
  24. Alteration filed

    General construction taking place on the 4th and 5th floor as per plans filed herewith. no change in use, egress or occupancy. Filing M01310595-I1.

    024
  25. Alteration approved

    Filing M01310595-I1 reached an approved status.

    025
  26. Permit recorded for alteration

    DOB lists a first permit date for M01310595-I1. That is not by itself confirmation of activity on site.

    026
  27. Alteration filed

    Mechanical modifications taking place on the 9th Floor as per plans filed herewith. No change in Use, Egress or Occupancy. Filing M01329496-I1.

    027
  28. Alteration filed

    Structural modifications taking place on the 9th Floor as per plans filed herewith. No change in Use, Egress or Occupancy. Filing M01329516-I1.

    028
  29. Alteration approved

    Filing M01329516-I1 reached an approved status.

    029
  30. Alteration approved

    Filing M01329496-I1 reached an approved status.

    030
  31. Alteration filed

    Plumbing work taking place on the 6th floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M01303956-I1.

    031
  32. Alteration approved

    Filing M01303956-I1 reached an approved status.

    032
  33. Permit recorded for alteration

    DOB lists a first permit date for M01329516-I1. That is not by itself confirmation of activity on site.

    033
  34. Permit recorded for alteration

    DOB lists a first permit date for M01329496-I1. That is not by itself confirmation of activity on site.

    034
  35. Permit recorded for alteration

    DOB lists a first permit date for M01296672-I1. That is not by itself confirmation of activity on site.

    035
  36. Alteration signed off

    DOB recorded a sign-off for M00946774-I1.

    036
  37. Alteration now completed

    The latest status recorded for M00946774-I1 is “LOC Issued.”

    037
  38. Alteration signed off

    DOB recorded a sign-off for M01082976-I1.

    038
  39. Alteration now completed

    The latest status recorded for M01082976-I1 is “LOC Issued.”

    039
  40. Alteration signed off

    DOB recorded a sign-off for M01066922-I1.

    040
  41. Alteration now completed

    The latest status recorded for M01066922-I1 is “LOC Issued.”

    041
  42. Alteration signed off

    DOB recorded a sign-off for M01329496-I1.

    042
  43. Alteration now completed

    The latest status recorded for M01329496-I1 is “LOC Issued.”

    043
  44. Alteration signed off

    DOB recorded a sign-off for M01081381-I1.

    044
  45. Alteration now completed

    The latest status recorded for M01081381-I1 is “LOC Issued.”

    045
  46. Alteration signed off

    DOB recorded a sign-off for M01269463-I1.

    046
  47. Alteration now completed

    The latest status recorded for M01269463-I1 is “LOC Issued.”

    047
  48. Alteration filed

    General construction taking place on the 26th and 27th floors as per plans filed herewith. no change in use, egress, or occupancy. Filing M01442040-I1.

    048
  49. Alteration filed

    Installation of a heavy duty sidewalk shed and medium duty pipe scaffold as per drawings during general construction work. no change in use, egress and occupancy. sidewalk shed and pipe scaffold to comply with chapter 33 of the NYC building code of 2022. Filing M01451596-I1.

    049
  50. Alteration filed

    General construction taking place on the 52nd floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M01435754-I1.

    050
  51. Alteration filed

    Sprinkler work taking place on the 26th and 27th floors as per plans filed herewith. no change in use, egress, or occupancy. Filing M01442412-I1.

    051
  52. Alteration approved

    Filing M01442412-I1 reached an approved status.

    052
  53. Alteration now approved

    The latest status recorded for M01442412-I1 is “Approved.”

    053
  54. Alteration filed

    Plumbing work taking place on the 26th and 27th floors as per plans filed herewith. no change in use, egress, or occupancy. Filing M01442177-I1.

    054
  55. Alteration approved

    Filing M01442177-I1 reached an approved status.

    055
  56. Alteration now approved

    The latest status recorded for M01442177-I1 is “Approved.”

    056
  57. Alteration approved

    Filing M01442040-I1 reached an approved status.

    057
  58. Alteration now approved

    The latest status recorded for M01442040-I1 is “Approved.”

    058
  59. Alteration signed off

    DOB recorded a sign-off for M00987211-I1.

    059
  60. Alteration now completed

    The latest status recorded for M00987211-I1 is “LOC Issued.”

    060
  61. Alteration signed off

    DOB recorded a sign-off for M01023710-I1.

    061
  62. Alteration now completed

    The latest status recorded for M01023710-I1 is “LOC Issued.”

    062
  63. Alteration approved

    Filing M01435754-I1 reached an approved status.

    063
  64. Alteration filed

    Mechanical work taking place on the 52nd floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M01435760-I1.

    064
  65. Alteration approved

    Filing M01435760-I1 reached an approved status.

    065
  66. Alteration filed

    Plumbing work taking place on the 52nd floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M01435958-I1.

    066
  67. Alteration approved

    Filing M01435958-I1 reached an approved status.

    067
  68. Alteration now approved

    The latest status recorded for M01435958-I1 is “Approved.”

    068
  69. Alteration filed

    Sprinkler work taking place on the 52nd floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M01435960-I1.

    069
  70. Alteration approved

    Filing M01435960-I1 reached an approved status.

    070
  71. Alteration now approved

    The latest status recorded for M01435960-I1 is “Approved.”

    071
  72. Alteration filed

    Mechanical work taking place on the 26th and 27th floors as per plans filed herewith. no change in use, egress, or occupancy. Filing M01442155-I1.

    072
  73. Permit recorded for alteration

    DOB lists a first permit date for M01435760-I1. That is not by itself confirmation of activity on site.

    073
  74. Alteration now approved

    The latest status recorded for M01435760-I1 is “Permit Entire.”

    074
  75. Alteration approved

    Filing M01451596-I1 reached an approved status.

    075
  76. Permit recorded for alteration

    DOB lists a first permit date for M01435754-I1. That is not by itself confirmation of activity on site.

    076
  77. Alteration now approved

    The latest status recorded for M01435754-I1 is “Permit Entire.”

    077
  78. Alteration approved

    Filing M01442155-I1 reached an approved status.

    078
  79. Alteration now approved

    The latest status recorded for M01442155-I1 is “Approved.”

    079
  80. Alteration signed off

    DOB recorded a sign-off for M01329516-I1.

    080
  81. Alteration now completed

    The latest status recorded for M01329516-I1 is “LOC Issued.”

    081
  82. Permit recorded for alteration

    DOB lists a first permit date for M01451596-I1. That is not by itself confirmation of activity on site.

    082
  83. Alteration now approved

    The latest status recorded for M01451596-I1 is “Permit Entire.”

    083
  84. Permit recorded for alteration

    DOB lists a first permit date for M01303956-I1. That is not by itself confirmation of activity on site.

    084
  85. Alteration now approved

    The latest status recorded for M01303956-I1 is “Permit Entire.”

    085
  86. Alteration filed

    General construction taking place on the 4th and 5th floor as per plans filed herewith. no change in use, egress or occupancy. Filing M01310595-P1.

    086
  87. Alteration filed

    Structural modifications taking place on the 5th floor as per plans filed herewith. no change in use, egress or occupancy. Filing M01296672-P1.

    087
  88. Alteration approved

    Filing M01310595-P1 reached an approved status.

    088
  89. Alteration now approved

    The latest status recorded for M01310595-P1 is “Approved.”

    089
  90. Alteration approved

    Filing M01296672-P1 reached an approved status.

    090
  91. Alteration now approved

    The latest status recorded for M01296672-P1 is “Approved.”

    091
  92. Alteration now approved

    The latest status recorded for M01310595-I1 is “Permit Entire.”

    092
  93. Alteration now approved

    The latest status recorded for M01296672-I1 is “Permit Entire.”

    093