Building record · BIN 1035335

60 East 42 Street

60 East 42 Street, Manhattan, NY 10017

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 24 independently sourced records, including 14 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 1035335

60 East 42 Street

Midtown-Times Square, Manhattan

A consolidated public-record view · updated Sep 22, 2026

DOB filings
24
Active-status
14
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings24
Open or active-status records14
First included filingDec 12, 2023
Latest recorded changeSep 22, 2026

The lot

What is already here?

The lot holds a 55-story office building built in 1929, on a 42,050 sq ft lot.

  1. Floor 55Above the southern skylineAbove the tallest building within sixty metres to the south, which stands 164.1 m. Nothing on that side reaches this floor.
  2. Floors 2–54Nothing on record
  3. Floor 1Street levelStreet level. The lot is recorded as commercial and office, so this floor is where the commercial space is.
  • Street levelCommercial and office
  • Above the southern skylineFrom about floor 55 — the tallest thing within 60 m to the south is 164.1 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 204 m over 55 floors, as the city counts them. 2 runs of floors have something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1929
Last altered
2016
Floors
55
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C5-3
Lot area
42,050 sq ft
Building area
1,150,564 sq ft

Owner of record

NYC TRANSIT

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 25, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 5 open notices on record for this building, out of 311 notices on file; the most recent was issued Jan 31, 2013.

  • No report and / or late filing (facade)

    Issued Jan 31, 2013 — FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012

  • Elevator

    Issued Sep 16, 2010

  • Plumbing

    Issued Apr 9, 1999

  • 2 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 24, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1035335. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 24 alteration filing. Its latest status categories are 10 recorded as completed, 14 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Dec 12, 2023
Latest recorded change
Sep 22, 2026
Highest proposed story count
55 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 60 East 42 Street.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 24 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Structural modification taking place on floors 23-26 as per plans filed herewith. No change in Use, Egress or Occupancy. Filing M00948455-I1.

    01
  2. Alteration approved

    Filing M00948455-I1 reached an approved status.

    02
  3. Alteration filed

    General construction modifications taking place on the 17th floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M01023710-I1.

    03
  4. Alteration approved

    Filing M01023710-I1 reached an approved status.

    04
  5. Permit recorded for alteration

    DOB lists a first permit date for M01023710-I1. That is not by itself confirmation of activity on site.

    05
  6. Alteration filed

    Sprinkler modifications taking place on the 17th floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M01066922-I1.

    06
  7. Alteration approved

    Filing M01066922-I1 reached an approved status.

    07
  8. Permit recorded for alteration

    DOB lists a first permit date for M01066922-I1. That is not by itself confirmation of activity on site.

    08
  9. Alteration filed

    Sprinkler modifications taking place on the 13th floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M01082976-I1.

    09
  10. Alteration approved

    Filing M01082976-I1 reached an approved status.

    010
  11. Permit recorded for alteration

    DOB lists a first permit date for M01082976-I1. That is not by itself confirmation of activity on site.

    011
  12. Alteration filed

    General construction modifications taking place on the 17th floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M00987211-I1.

    012
  13. Alteration approved

    Filing M00987211-I1 reached an approved status.

    013
  14. Permit recorded for alteration

    DOB lists a first permit date for M00987211-I1. That is not by itself confirmation of activity on site.

    014
  15. Alteration filed

    Structural modifications taking place on the 19th and 20th floors as per plans filed herewith. no change in use, egress or occupancy. Filing M01081381-I1.

    015
  16. Alteration approved

    Filing M01081381-I1 reached an approved status.

    016
  17. Alteration filed

    Mechanical modifications taking place on the 13th floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M00946774-I1.

    017
  18. Alteration approved

    Filing M00946774-I1 reached an approved status.

    018
  19. Permit recorded for alteration

    DOB lists a first permit date for M01081381-I1. That is not by itself confirmation of activity on site.

    019
  20. Permit recorded for alteration

    DOB lists a first permit date for M00946774-I1. That is not by itself confirmation of activity on site.

    020
  21. Alteration filed

    General construction taking place on the 52nd floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M01269463-I1.

    021
  22. Alteration approved

    Filing M01269463-I1 reached an approved status.

    022
  23. Permit recorded for alteration

    DOB lists a first permit date for M01269463-I1. That is not by itself confirmation of activity on site.

    023
  24. Alteration filed

    Structural modifications taking place on the 5th floor as per plans filed herewith. no change in use, egress or occupancy. Filing M01296672-I1.

    024
  25. Alteration approved

    Filing M01296672-I1 reached an approved status.

    025
  26. Alteration filed

    General construction taking place on the 4th and 5th floor as per plans filed herewith. no change in use, egress or occupancy. Filing M01310595-I1.

    026
  27. Alteration approved

    Filing M01310595-I1 reached an approved status.

    027
  28. Permit recorded for alteration

    DOB lists a first permit date for M01310595-I1. That is not by itself confirmation of activity on site.

    028
  29. Alteration filed

    Mechanical modifications taking place on the 9th Floor as per plans filed herewith. No change in Use, Egress or Occupancy. Filing M01329496-I1.

    029
  30. Alteration filed

    Structural modifications taking place on the 9th Floor as per plans filed herewith. No change in Use, Egress or Occupancy. Filing M01329516-I1.

    030
  31. Alteration approved

    Filing M01329516-I1 reached an approved status.

    031
  32. Alteration approved

    Filing M01329496-I1 reached an approved status.

    032
  33. Alteration filed

    Plumbing work taking place on the 6th floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M01303956-I1.

    033
  34. Alteration approved

    Filing M01303956-I1 reached an approved status.

    034
  35. Permit recorded for alteration

    DOB lists a first permit date for M01329516-I1. That is not by itself confirmation of activity on site.

    035
  36. Permit recorded for alteration

    DOB lists a first permit date for M01329496-I1. That is not by itself confirmation of activity on site.

    036
  37. Permit recorded for alteration

    DOB lists a first permit date for M01296672-I1. That is not by itself confirmation of activity on site.

    037
  38. Permit recorded for alteration

    DOB lists a first permit date for M00948455-I1. That is not by itself confirmation of activity on site.

    038
  39. Alteration signed off

    DOB recorded a sign-off for M00946774-I1.

    039
  40. Alteration now completed

    The latest status recorded for M00946774-I1 is “LOC Issued.”

    040
  41. Alteration signed off

    DOB recorded a sign-off for M01082976-I1.

    041
  42. Alteration now completed

    The latest status recorded for M01082976-I1 is “LOC Issued.”

    042
  43. Alteration signed off

    DOB recorded a sign-off for M01066922-I1.

    043
  44. Alteration now completed

    The latest status recorded for M01066922-I1 is “LOC Issued.”

    044
  45. Alteration signed off

    DOB recorded a sign-off for M01329496-I1.

    045
  46. Alteration now completed

    The latest status recorded for M01329496-I1 is “LOC Issued.”

    046
  47. Alteration signed off

    DOB recorded a sign-off for M01081381-I1.

    047
  48. Alteration now completed

    The latest status recorded for M01081381-I1 is “LOC Issued.”

    048
  49. Alteration signed off

    DOB recorded a sign-off for M01269463-I1.

    049
  50. Alteration now completed

    The latest status recorded for M01269463-I1 is “LOC Issued.”

    050
  51. Alteration filed

    General construction taking place on the 26th and 27th floors as per plans filed herewith. no change in use, egress, or occupancy. Filing M01442040-I1.

    051
  52. Alteration filed

    Installation of a heavy duty sidewalk shed and medium duty pipe scaffold as per drawings during general construction work. no change in use, egress and occupancy. sidewalk shed and pipe scaffold to comply with chapter 33 of the NYC building code of 2022. Filing M01451596-I1.

    052
  53. Alteration filed

    General construction taking place on the 52nd floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M01435754-I1.

    053
  54. Alteration filed

    Sprinkler work taking place on the 26th and 27th floors as per plans filed herewith. no change in use, egress, or occupancy. Filing M01442412-I1.

    054
  55. Alteration approved

    Filing M01442412-I1 reached an approved status.

    055
  56. Alteration now approved

    The latest status recorded for M01442412-I1 is “Approved.”

    056
  57. Alteration filed

    Plumbing work taking place on the 26th and 27th floors as per plans filed herewith. no change in use, egress, or occupancy. Filing M01442177-I1.

    057
  58. Alteration approved

    Filing M01442177-I1 reached an approved status.

    058
  59. Alteration now approved

    The latest status recorded for M01442177-I1 is “Approved.”

    059
  60. Alteration approved

    Filing M01442040-I1 reached an approved status.

    060
  61. Alteration now approved

    The latest status recorded for M01442040-I1 is “Approved.”

    061
  62. Alteration signed off

    DOB recorded a sign-off for M00987211-I1.

    062
  63. Alteration now completed

    The latest status recorded for M00987211-I1 is “LOC Issued.”

    063
  64. Alteration signed off

    DOB recorded a sign-off for M01023710-I1.

    064
  65. Alteration now completed

    The latest status recorded for M01023710-I1 is “LOC Issued.”

    065
  66. Alteration filed

    Plumbing work taking place on the 52nd floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M01435958-I1.

    066
  67. Alteration approved

    Filing M01435958-I1 reached an approved status.

    067
  68. Alteration approved

    Filing M01435754-I1 reached an approved status.

    068
  69. Alteration filed

    Mechanical work taking place on the 52nd floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M01435760-I1.

    069
  70. Alteration approved

    Filing M01435760-I1 reached an approved status.

    070
  71. Alteration filed

    Sprinkler work taking place on the 52nd floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M01435960-I1.

    071
  72. Alteration approved

    Filing M01435960-I1 reached an approved status.

    072
  73. Alteration now approved

    The latest status recorded for M01435960-I1 is “Approved.”

    073
  74. Alteration filed

    Mechanical work taking place on the 26th and 27th floors as per plans filed herewith. no change in use, egress, or occupancy. Filing M01442155-I1.

    074
  75. Permit recorded for alteration

    DOB lists a first permit date for M01435760-I1. That is not by itself confirmation of activity on site.

    075
  76. Alteration now approved

    The latest status recorded for M01435760-I1 is “Permit Entire.”

    076
  77. Alteration approved

    Filing M01451596-I1 reached an approved status.

    077
  78. Permit recorded for alteration

    DOB lists a first permit date for M01435754-I1. That is not by itself confirmation of activity on site.

    078
  79. Alteration now approved

    The latest status recorded for M01435754-I1 is “Permit Entire.”

    079
  80. Alteration approved

    Filing M01442155-I1 reached an approved status.

    080
  81. Alteration now approved

    The latest status recorded for M01442155-I1 is “Approved.”

    081
  82. Alteration signed off

    DOB recorded a sign-off for M01329516-I1.

    082
  83. Alteration now completed

    The latest status recorded for M01329516-I1 is “LOC Issued.”

    083
  84. Permit recorded for alteration

    DOB lists a first permit date for M01451596-I1. That is not by itself confirmation of activity on site.

    084
  85. Alteration now approved

    The latest status recorded for M01451596-I1 is “Permit Entire.”

    085
  86. Permit recorded for alteration

    DOB lists a first permit date for M01303956-I1. That is not by itself confirmation of activity on site.

    086
  87. Alteration now approved

    The latest status recorded for M01303956-I1 is “Permit Entire.”

    087
  88. Alteration filed

    General construction taking place on the 4th and 5th floor as per plans filed herewith. no change in use, egress or occupancy. Filing M01310595-P1.

    088
  89. Alteration filed

    Structural modifications taking place on the 5th floor as per plans filed herewith. no change in use, egress or occupancy. Filing M01296672-P1.

    089
  90. Alteration approved

    Filing M01310595-P1 reached an approved status.

    090
  91. Alteration now approved

    The latest status recorded for M01310595-P1 is “Approved.”

    091
  92. Alteration approved

    Filing M01296672-P1 reached an approved status.

    092
  93. Alteration now approved

    The latest status recorded for M01296672-P1 is “Approved.”

    093
  94. Alteration now approved

    The latest status recorded for M01310595-I1 is “Permit Entire.”

    094
  95. Alteration now approved

    The latest status recorded for M01296672-I1 is “Permit Entire.”

    095
  96. Permit recorded for alteration

    DOB lists a first permit date for M01435958-I1. That is not by itself confirmation of activity on site.

    096
  97. Alteration now approved

    The latest status recorded for M01435958-I1 is “Permit Entire.”

    097
  98. Alteration signed off

    DOB recorded a sign-off for M00948455-I1.

    098
  99. Alteration now completed

    The latest status recorded for M00948455-I1 is “LOC Issued.”

    099