DOB filing M01329396-P1
Alteration filing at 12 East 49 Street
Building record · BIN 1035434
12 East 49 Street, Manhattan, NY 10017
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 19 independently sourced records, including 16 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1035434
12 East 49 Street
Midtown-Times Square, Manhattan
A consolidated public-record view · updated Sep 17, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 45-story office building built in 1984, on a 25,005 sq ft lot.
Owner of record
415 MADISON AVE LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 20, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 1 open notice on record for this building, out of 128 notices on file; the most recent was issued Jan 6, 2006.
Issued Jan 6, 2006
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 19, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1035434. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 19 alteration filing. Its latest status categories are 16 approved, 3 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 12 East 49 Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 19 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Sprinkler work on the 6th and 7th floors as indicated on drawings. Filing M01270207-I1.
Filing M01270207-I1 reached an approved status.
DOB lists a first permit date for M01270207-I1. That is not by itself confirmation of activity on site.
Sprinkler work on the 30th floor construction (31st floor marketing) as indicated on drawings. Filing M01277183-I1.
Filing M01277183-I1 reached an approved status.
DOB lists a first permit date for M01277183-I1. That is not by itself confirmation of activity on site.
Sprinkler demolition on the 3rd floor, 23rd floor construction (24th floor marketing) 24th floor construction (25th floor marketing) as indicated on drawings. Filing M01329396-I1.
Filing M01329396-I1 reached an approved status.
Structural changes for slab infill on the 24th floor construction (25th floor marketing) as indicated on drawings. Filing M01329408-I1.
DOB lists a first permit date for M01329396-I1. That is not by itself confirmation of activity on site.
Filing M01329408-I1 reached an approved status.
DOB lists a first permit date for M01329408-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for M01329408-I1.
The latest status recorded for M01329408-I1 is “LOC Issued.”
Construction work on the 28th floor construction (29th floor marketing) as indicated on drawings. Filing M01423130-I1.
Mechanical work on the 28th floor construction (29th floor marketing) as indicated on drawings. Filing M01423158-I1.
Filing M01423158-I1 reached an approved status.
Sprinkler work on the 28th floor construction (29th floor marketing) as indicated on drawings. Filing M01423181-I1.
Plumbing work on the 28th floor construction (29th floor marketing) as indicated on drawings. Filing M01423171-I1.
Filing M01423171-I1 reached an approved status.
The latest status recorded for M01423171-I1 is “Approved.”
DOB recorded a sign-off for M01277183-I1.
The latest status recorded for M01277183-I1 is “LOC Issued.”
Filing M01423181-I1 reached an approved status.
The latest status recorded for M01423181-I1 is “Approved.”
Filing M01423130-I1 reached an approved status.
DOB lists a first permit date for M01423158-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01423158-I1 is “Permit Entire.”
DOB lists a first permit date for M01423130-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01423130-I1 is “Permit Entire.”
General construction modifications taking place on the 23-24 Construction/ 24-25 Marketing floors as per plans filed herewith. No change in use, egress or occupancy. Filing M01438122-I1.
General construction taking place on the 3rd floor as per plans filed herewith. No change in use, egress or occupancy. Filing M01438024-I1.
DOB recorded a sign-off for M01270207-I1.
The latest status recorded for M01270207-I1 is “LOC Issued.”
Filing M01438122-I1 reached an approved status.
Filing M01438024-I1 reached an approved status.
Structural modifications taking place on the 2nd & 3rd floor as per plans filed herewith. No change in use, egress or occupancy. Filing M01438024-S1.
Filing M01438024-S1 reached an approved status.
Plumbing modifications taking place on the 3rd floor as per plans filed herewith. No change in use, egress or occupancy. Filing M01438024-S3.
Mechanical, taking place on the Mezz, 2nd, 3rd floor as per plans filed herewith. No change in use, egress or occupancy. Filing M01438024-S2.
Mechanical modifications taking place on the 22-24 construction /23-25 marketing floors as per plans filed herewith. No change in use, egress or occupancy. Filing M01438122-S2.
Filing M01438122-S2 reached an approved status.
DOB lists a first permit date for M01438122-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01438122-I1 is “Permit Entire.”
DOB lists a first permit date for M01438024-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01438024-I1 is “Permit Entire.”
DOB lists a first permit date for M01438024-S1. That is not by itself confirmation of activity on site.
The latest status recorded for M01438024-S1 is “Permit Entire.”
Plumbing modifications taking place on the 22-23 Construction/ 23-24 Marketing floors as per plans filed herewith. No change in use, egress or occupancy. Filing M01438122-S3.
Filing M01438122-S3 reached an approved status.
The latest status recorded for M01438122-S3 is “Approved.”
Sprinkler modifications taking place on the 23-24 construction/ 24-25 marketing floors as per plans filed herewith. No change in use, egress or occupancy. Filing M01438122-S4.
Filing M01438122-S4 reached an approved status.
The latest status recorded for M01438122-S4 is “Approved.”
Sprinkler modifications on the 3rd fl as per plans filed herewith. no change in use, egress or occupancy. Filing M01438024-S4.
Filing M01438024-S4 reached an approved status.
The latest status recorded for M01438024-S4 is “Approved.”
Structural modifications taking place on the 23-25 Construction/ 24-26 Marketing floors as per plans filed herewith. No change in use, egress or occupancy. Filing M01438122-S1.
Filing M01438122-S1 reached an approved status.
The latest status recorded for M01438122-S2 is “Approved.”
DOB lists a first permit date for M01438122-S1. That is not by itself confirmation of activity on site.
The latest status recorded for M01438122-S1 is “Permit Entire.”
Filing M01438024-S3 reached an approved status.
The latest status recorded for M01438024-S3 is “Approved.”
Filing M01438024-S2 reached an approved status.
The latest status recorded for M01438024-S2 is “Approved.”
Sprinkler demolition on the 3rd floor, 23rd floor construction (24th floor marketing) 24th floor construction (25th floor marketing) as indicated on drawings. Filing M01329396-P1.
Filing M01329396-P1 reached an approved status.
The latest status recorded for M01329396-P1 is “Approved.”
The latest status recorded for M01329396-I1 is “Permit Entire.”