Building record · BIN 1035441

280 Park Avenue

280 Park Avenue, Manhattan, NY 10017

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 19 independently sourced records, including 11 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 1035441

280 Park Avenue

Midtown-Times Square, Manhattan

A consolidated public-record view · updated Oct 20, 2026

DOB filings
19
Active-status
11
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings19
Open or active-status records11
First included filingJan 14, 2025
Latest recorded changeOct 20, 2026

The lot

What is already here?

The lot holds a 28-story office building built in 1962, on a 24,775 sq ft lot.

  1. Floors 2–28Nothing on record
  2. Floor 1Street levelStreet level. The lot is recorded as commercial and office, so this floor is where the commercial space is.
  • Street levelCommercial and office
  • Above the southern skylineFrom about floor 72 — the tallest thing within 60 m to the south is 213.4 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 120.3 m over 28 floors, as the city counts them. 1 run of floors has something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1962
Last altered
2013
Floors
28
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C5-3
Lot area
24,775 sq ft
Building area
386,166 sq ft

Owner of record

415 MADISON AVE LLC

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 22, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 5 open notices on record for this building, out of 184 notices on file; the most recent was issued Sep 5, 2012.

  • Elevator

    Issued Sep 5, 2012

  • Elevator

    Issued Feb 25, 2008

  • Elevator

    Issued Jul 17, 2000 — 1P33987

  • 2 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 22, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1035441. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 19 alteration filing. Its latest status categories are 11 approved, 8 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Jan 14, 2025
Latest recorded change
Oct 20, 2026
Highest proposed story count
43 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 280 Park Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 19 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Installation of new sprinkler heads and piping, installation of pre-action sprinkler system and removal of TCSP. and Installation of new fixtures and associated piping on the 6th floor. Filing M01163645-I1.

    01
  2. Alteration approved

    Filing M01163645-I1 reached an approved status.

    02
  3. Permit recorded for alteration

    DOB lists a first permit date for M01163645-I1. That is not by itself confirmation of activity on site.

    03
  4. Alteration filed

    Partial buildout 6fl- East. Filing M01157742-I1.

    04
  5. Alteration approved

    Filing M01157742-I1 reached an approved status.

    05
  6. Permit recorded for alteration

    DOB lists a first permit date for M01157742-I1. That is not by itself confirmation of activity on site.

    06
  7. Alteration filed

    Heavy duty sidewalk shed during nb const at 270 park ave, filed sep. sidewalk shed shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M01236052-I1.

    07
  8. Permit recorded for alteration

    DOB lists a first permit date for M01236052-I1. That is not by itself confirmation of activity on site.

    08
  9. Alteration filed

    Alteration of existing ductwork, installation of new CRAC units and Heatpumps. Filing M01225671-I1.

    09
  10. Alteration filed

    Reinforcement of steel beams for beam penetration and concrete housekeeping pad.4 ft. Filing M01238205-I1.

    010
  11. Alteration approved

    Filing M01225671-I1 reached an approved status.

    011
  12. Alteration approved

    Filing M01238205-I1 reached an approved status.

    012
  13. Permit recorded for alteration

    DOB lists a first permit date for M01225671-I1. That is not by itself confirmation of activity on site.

    013
  14. Permit recorded for alteration

    DOB lists a first permit date for M01238205-I1. That is not by itself confirmation of activity on site.

    014
  15. Alteration filed

    Interior modifications of existing offices. Filing M01335080-I1.

    015
  16. Alteration approved

    Filing M01335080-I1 reached an approved status.

    016
  17. Permit recorded for alteration

    DOB lists a first permit date for M01335080-I1. That is not by itself confirmation of activity on site.

    017
  18. Alteration filed

    Demolishion of and interior build out including a convenience stair removal and slab infil. Filing M01376787-I1.

    018
  19. Alteration approved

    Filing M01376787-I1 reached an approved status.

    019
  20. Permit recorded for alteration

    DOB lists a first permit date for M01376787-I1. That is not by itself confirmation of activity on site.

    020
  21. Alteration filed

    Additions/Modification to existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application. Filing M01403736-I1.

    021
  22. Alteration approved

    Filing M01403736-I1 reached an approved status.

    022
  23. Alteration filed

    Addition and modifications to existing HVAC system and related ducts and piping. No change in use, egress or occupancy. Filing M01403728-I1.

    023
  24. Alteration approved

    Filing M01403728-I1 reached an approved status.

    024
  25. Alteration filed

    Removal/installation of interior non-bearing partitions & related finishes. no change in use, egress or occupancy. Filing M01403718-I1.

    025
  26. Permit recorded for alteration

    DOB lists a first permit date for M01403728-I1. That is not by itself confirmation of activity on site.

    026
  27. Alteration approved

    Filing M01403718-I1 reached an approved status.

    027
  28. Permit recorded for alteration

    DOB lists a first permit date for M01403718-I1. That is not by itself confirmation of activity on site.

    028
  29. Permit recorded for alteration

    DOB lists a first permit date for M01403736-I1. That is not by itself confirmation of activity on site.

    029
  30. Alteration signed off

    DOB recorded a sign-off for M01238205-I1.

    030
  31. Alteration now completed

    The latest status recorded for M01238205-I1 is “LOC Issued.”

    031
  32. Alteration signed off

    DOB recorded a sign-off for M01403728-I1.

    032
  33. Alteration now completed

    The latest status recorded for M01403728-I1 is “LOC Issued.”

    033
  34. Alteration now approved

    The latest status recorded for M01376787-I1 is “Permit Entire.”

    034
  35. Alteration filed

    PL/SP filing as per plans. No change in use, egress, or occupancy. Filing M01450993-I1.

    035
  36. Alteration filed

    Demise one space to make it two as per plans. no change in use, egress or occupancy. Filing M01450943-I1.

    036
  37. Alteration filed

    Mechanical filing as per plans. No change in use, egress, or occupancy. Filing M01450978-I1.

    037
  38. Alteration approved

    Filing M01450993-I1 reached an approved status.

    038
  39. Alteration approved

    Filing M01450978-I1 reached an approved status.

    039
  40. Alteration approved

    Filing M01450943-I1 reached an approved status.

    040
  41. Permit recorded for alteration

    DOB lists a first permit date for M01450943-I1. That is not by itself confirmation of activity on site.

    041
  42. Alteration now approved

    The latest status recorded for M01450943-I1 is “Permit Entire.”

    042
  43. Permit recorded for alteration

    DOB lists a first permit date for M01450978-I1. That is not by itself confirmation of activity on site.

    043
  44. Alteration now approved

    The latest status recorded for M01450978-I1 is “Permit Entire.”

    044
  45. Alteration signed off

    DOB recorded a sign-off for M01403718-I1.

    045
  46. Alteration now completed

    The latest status recorded for M01403718-I1 is “LOC Issued.”

    046
  47. Permit recorded for alteration

    DOB lists a first permit date for M01450993-I1. That is not by itself confirmation of activity on site.

    047
  48. Alteration now approved

    The latest status recorded for M01450993-I1 is “Permit Entire.”

    048
  49. Alteration signed off

    DOB recorded a sign-off for M01225671-I1.

    049
  50. Alteration now completed

    The latest status recorded for M01225671-I1 is “LOC Issued.”

    050
  51. Alteration signed off

    DOB recorded a sign-off for M01163645-I1.

    051
  52. Alteration now completed

    The latest status recorded for M01163645-I1 is “LOC Issued.”

    052
  53. Alteration filed

    Herewith filing interior demolition to office space (14th and 15th floors) as outlined in plans submitted. No change in use, egress or occupancy is proposed under this application. Filing M01457168-I1.

    053
  54. Alteration signed off

    DOB recorded a sign-off for M01335080-I1.

    054
  55. Alteration now completed

    The latest status recorded for M01335080-I1 is “LOC Issued.”

    055
  56. Alteration filed

    Herewith filing sprinkler demolition to office space (14th and 15th floors) as outlined in plans submitted. No change in use, egress or occupancy is proposed under this application. Filing M01457168-S3.

    056
  57. Alteration approved

    Filing M01457168-S3 reached an approved status.

    057
  58. Alteration filed

    Herewith filing plumbing demolition to office space (14th and 15th floors) as outlined in plans submitted. No change in use, egress or occupancy is proposed under this application. Filing M01457168-S2.

    058
  59. Alteration approved

    Filing M01457168-S2 reached an approved status.

    059
  60. Alteration filed

    Herewith filing mechanical demolition to office space (14th and 15th floors) as outlined in plans submitted. No change in use, egress or occupancy is proposed under this application. Filing M01457168-S1.

    060
  61. Alteration approved

    Filing M01457168-S1 reached an approved status.

    061
  62. Alteration signed off

    DOB recorded a sign-off for M01157742-I1.

    062
  63. Alteration now completed

    The latest status recorded for M01157742-I1 is “LOC Issued.”

    063
  64. Alteration now approved

    The latest status recorded for M01236052-I1 is “Permit Entire.”

    064
  65. Permit recorded for alteration

    DOB lists a first permit date for M01457168-S3. That is not by itself confirmation of activity on site.

    065
  66. Alteration now approved

    The latest status recorded for M01457168-S3 is “Permit Entire.”

    066
  67. Permit recorded for alteration

    DOB lists a first permit date for M01457168-S2. That is not by itself confirmation of activity on site.

    067
  68. Alteration now approved

    The latest status recorded for M01457168-S2 is “Permit Entire.”

    068
  69. Permit recorded for alteration

    DOB lists a first permit date for M01457168-S1. That is not by itself confirmation of activity on site.

    069
  70. Alteration now approved

    The latest status recorded for M01457168-S1 is “Permit Entire.”

    070
  71. Alteration approved

    Filing M01457168-I1 reached an approved status.

    071
  72. Permit recorded for alteration

    DOB lists a first permit date for M01457168-I1. That is not by itself confirmation of activity on site.

    072
  73. Alteration now approved

    The latest status recorded for M01457168-I1 is “Permit Entire.”

    073
  74. Alteration signed off

    DOB recorded a sign-off for M01403736-I1.

    074
  75. Alteration now completed

    The latest status recorded for M01403736-I1 is “LOC Issued.”

    075
  76. Alteration filed

    Heavy duty sidewalk shed during building alteration filed under application # m01401811. sidewalk shed shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M01470500-S1.

    076
  77. Alteration filed

    Temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M01470500-I1.

    077
  78. Permit recorded for alteration

    DOB lists a first permit date for M01470500-S1. That is not by itself confirmation of activity on site.

    078
  79. Alteration now approved

    The latest status recorded for M01470500-S1 is “Permit Entire.”

    079
  80. Permit recorded for alteration

    DOB lists a first permit date for M01470500-I1. That is not by itself confirmation of activity on site.

    080
  81. Alteration now approved

    The latest status recorded for M01470500-I1 is “Permit Entire.”

    081