DOB filing M01381685-P1
Alteration filing at 437 Madison Avenue
Building record · BIN 1035455
437 Madison Avenue, Manhattan, NY 10022
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 16 independently sourced records, including 14 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1035455
437 Madison Avenue
Midtown-Times Square, Manhattan
A consolidated public-record view · updated Oct 16, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 39-story office building built in 1967, on a 38,360 sq ft lot.
Owner of record
38 COMPANY,
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 20, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
No open violations are recorded for this building. 143 notices are on file, all with a recorded resolution.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 20, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1035455. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 16 alteration filing. Its latest status categories are 14 approved, 2 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 437 Madison Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 16 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Mechanical modifications taking place on the 25th Floor (Construction)/26th Floor (Marketing) as per plans filed herewith. No change in Use, Egress or Occupancy. Filing M01217977-I1.
Sprinkler modifications taking place on the 25th Floor (Construction)/26th Floor (Marketing) as per plans filed herewith. No change in Use, Egress or Occupancy. Filing M01217996-I1.
General Construction taking place on the 25th Floor (Construction)/26th Floor (Marketing) as per plans filed herewith. No change in Use, Egress or Occupancy. Filing M01217973-I1.
Filing M01217973-I1 reached an approved status.
Filing M01217977-I1 reached an approved status.
Plumbing modifications taking place on the 25th Floor Construction/26th Floor (Marketing) Floor as per plans filed herewith. No change in Use, Egress or Occupancy. Filing M01217993-I1.
Filing M01217993-I1 reached an approved status.
Filing M01217996-I1 reached an approved status.
DOB lists a first permit date for M01217973-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01217977-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01217993-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01217996-I1. That is not by itself confirmation of activity on site.
Install ductwork and units. Filing M01211891-S1.
Filing M01211891-S1 reached an approved status.
Install plumbing fixtures and piping. Filing M01211891-S2.
Filing M01211891-S2 reached an approved status.
DOB lists a first permit date for M01211891-S1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01211891-S2. That is not by itself confirmation of activity on site.
Interior office renovation on 4th floor as per plans. Filing M01359186-I1.
Filing M01359186-I1 reached an approved status.
DOB lists a first permit date for M01359186-I1. That is not by itself confirmation of activity on site.
Interior renovations/alterations inclusive of removal and new installation of interior non-bearing partitions and ceiling finishes. Filing M01356775-I1.
Filing M01356775-I1 reached an approved status.
DOB lists a first permit date for M01356775-I1. That is not by itself confirmation of activity on site.
Install ductwork and supplemental packaged ac unit (water cooled). Filing M01381685-S1.
Remove and construct interior partitions, ceilings & doors. Filing M01381685-I1.
Filing M01381685-S1 reached an approved status.
Filing M01381685-I1 reached an approved status.
DOB lists a first permit date for M01381685-S1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01381685-I1. That is not by itself confirmation of activity on site.
Interior renovations/alterations inclusive of removal and new installation of interior non-bearing partitions and ceiling finishes. Filing M01356775-P1.
Filing M01356775-P1 reached an approved status.
The latest status recorded for M01356775-P1 is “Approved.”
The latest status recorded for M01356775-I1 is “Permit Entire.”
DOB recorded a sign-off for M01211891-S2.
The latest status recorded for M01211891-S2 is “LOC Issued.”
Install ductwork and units. Filing M01211891-P3.
Filing M01211891-P3 reached an approved status.
The latest status recorded for M01211891-P3 is “Approved.”
The latest status recorded for M01211891-S1 is “Permit Entire.”
The latest status recorded for M01381685-I1 is “Permit Entire.”
The latest status recorded for M01359186-I1 is “Permit Entire.”
Sprinkler modifications taking place on the 25th Floor (Construction)/26th Floor (Marketing) as per plans filed herewith. No change in Use, Egress or Occupancy. Filing M01217996-P1.
Mechanical modifications taking place on the 25th Floor (Construction)/26th Floor (Marketing) as per plans filed herewith. No change in Use, Egress or Occupancy. Filing M01217977-P1.
Filing M01217996-P1 reached an approved status.
The latest status recorded for M01217996-P1 is “Approved.”
DOB recorded a sign-off for M01217993-I1.
The latest status recorded for M01217993-I1 is “LOC Issued.”
The latest status recorded for M01217996-I1 is “Permit Entire.”
Filing M01217977-P1 reached an approved status.
The latest status recorded for M01217977-P1 is “Approved.”
The latest status recorded for M01217977-I1 is “Permit Entire.”
Install ductwork and supplemental packaged ac unit (water cooled). Filing M01381685-P1.
The latest status recorded for M01217973-I1 is “Permit Entire.”
General Construction taking place on the 25th Floor (Construction)/26th Floor (Marketing) as per plans filed herewith. No change in Use, Egress or Occupancy. Filing M01217973-P1.
Filing M01217973-P1 reached an approved status.
The latest status recorded for M01217973-P1 is “Approved.”
Filing M01381685-P1 reached an approved status.
The latest status recorded for M01381685-P1 is “Approved.”
The latest status recorded for M01381685-S1 is “Permit Entire.”