Building record · BIN 1035758

545 Madison Avenue

545 Madison Avenue, Manhattan, NY 10022

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 9 independently sourced records, including 9 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 1035758

545 Madison Avenue

Midtown-Times Square, Manhattan

A consolidated public-record view · updated Sep 10, 2026

DOB filings
9
Active-status
9
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings9
Open or active-status records9
First included filingAug 1, 2024
Latest recorded changeSep 10, 2026

The lot

What is already here?

The lot holds a 17-story office building built in 1956, on a 7,025 sq ft lot.

  1. Floors 2–17Nothing on record
  2. Floor 1Street levelStreet level. The lot is recorded as commercial and office, so this floor is where the commercial space is.
  • Street levelCommercial and office
  • Above the southern skylineFrom about floor 47 — the tallest thing within 60 m to the south is 139.8 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 57.6 m over 17 floors, as the city counts them. 1 run of floors has something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1956
Last altered
1981
Floors
17
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C5-3
Lot area
7,025 sq ft
Building area
138,240 sq ft

The apartments

148 condominium apartments are assessed on this block, and the typical one is 1,074 sq ft (100 m²). They run from 41 to 274 m².

The city values the typical one at $431,166. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.

What it sold for

5 apartments on this tax block changed hands in the year the city last published, at a median of $140,000, from 45,000 to 999,900.

Recorded sale prices from the Department of Finance’s rolling file, covering the year to Aug 31, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.

Owner of record

E PLUS E LLC

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 15, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 5 open notices on record for this building, out of 63 notices on file; the most recent was issued Dec 1, 2024.

  • Failure to post energy

    Issued Dec 1, 2024 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

  • Failure to post energy

    Issued Dec 1, 2023 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

  • Hazardous condition (facade)

    Issued Nov 29, 2023 — CYCLE 9B UNSAFE REPORT FILED

  • 2 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1035758. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 9 alteration filing. Its latest status categories are 9 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Aug 1, 2024
Latest recorded change
Sep 10, 2026
Highest proposed story count
17 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 545 Madison Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 9 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    General Construction modifications to take place on the Facade as per drawings filed herewith. No change in use, egress, or occupancy. Filing M01082595-I1.

    01
  2. Alteration approved

    Filing M01082595-I1 reached an approved status.

    02
  3. Permit recorded for alteration

    DOB lists a first permit date for M01082595-I1. That is not by itself confirmation of activity on site.

    03
  4. Alteration filed

    Interior architectural office renovation on 4th and 5th floors as per plans filed herewith. no change to use, egress, or occupancy. Filing M01336167-I1.

    04
  5. Alteration filed

    Sprinkler modifications taking place on the 9th floor as per plans filed herewith. No change in use, egress, or occupancy. Filing M01353830-I1.

    05
  6. Alteration filed

    Plumbing modifications taking place on the 9th Construction floor as per plans filed herewith. No change in use, egress nor occupancy. Filing M01353819-I1.

    06
  7. Alteration approved

    Filing M01353830-I1 reached an approved status.

    07
  8. Alteration approved

    Filing M01353819-I1 reached an approved status.

    08
  9. Alteration approved

    Filing M01336167-I1 reached an approved status.

    09
  10. Alteration filed

    Mechanical equipment installation and modification as per pans filed herewith. no change to use, egress, or occupancy. Filing M01336167-S1.

    010
  11. Alteration approved

    Filing M01336167-S1 reached an approved status.

    011
  12. Alteration filed

    Sprinkler modifications to take place on the 9th floor as per drawings filed. No change in use, egress, or occupancy. Filing M01435340-S2.

    012
  13. Alteration filed

    Plumbing modifications to take place on the 9th floor per drawings filed herewith. No change in use, egress, or occupancy. Filing M01435340-S3.

    013
  14. Alteration filed

    Mechanical modifications to take place on the 9th floor as per plans filed herewith. No Change in use, egress, or occupancy. Filing M01435340-S1.

    014
  15. Alteration approved

    Filing M01435340-S1 reached an approved status.

    015
  16. Alteration filed

    Industrial rope access for facade inspections. Filing M01446620-I1.

    016
  17. Alteration approved

    Filing M01435340-S2 reached an approved status.

    017
  18. Alteration approved

    Filing M01435340-S3 reached an approved status.

    018
  19. Permit recorded for alteration

    DOB lists a first permit date for M01435340-S1. That is not by itself confirmation of activity on site.

    019
  20. Alteration now approved

    The latest status recorded for M01435340-S1 is “Permit Entire.”

    020
  21. Alteration now approved

    The latest status recorded for M01082595-I1 is “Permit Entire.”

    021
  22. Permit recorded for alteration

    DOB lists a first permit date for M01435340-S3. That is not by itself confirmation of activity on site.

    022
  23. Alteration now approved

    The latest status recorded for M01435340-S3 is “Permit Entire.”

    023
  24. Permit recorded for alteration

    DOB lists a first permit date for M01353819-I1. That is not by itself confirmation of activity on site.

    024
  25. Alteration now approved

    The latest status recorded for M01353819-I1 is “Permit Entire.”

    025
  26. Permit recorded for alteration

    DOB lists a first permit date for M01435340-S2. That is not by itself confirmation of activity on site.

    026
  27. Alteration now approved

    The latest status recorded for M01435340-S2 is “Permit Entire.”

    027
  28. Permit recorded for alteration

    DOB lists a first permit date for M01353830-I1. That is not by itself confirmation of activity on site.

    028
  29. Alteration now approved

    The latest status recorded for M01353830-I1 is “Permit Entire.”

    029
  30. Alteration approved

    Filing M01446620-I1 reached an approved status.

    030
  31. Permit recorded for alteration

    DOB lists a first permit date for M01446620-I1. That is not by itself confirmation of activity on site.

    031
  32. Alteration now approved

    The latest status recorded for M01446620-I1 is “Permit Entire.”

    032
  33. Permit recorded for alteration

    DOB lists a first permit date for M01336167-S1. That is not by itself confirmation of activity on site.

    033
  34. Alteration now approved

    The latest status recorded for M01336167-S1 is “Permit Entire.”

    034
  35. Permit recorded for alteration

    DOB lists a first permit date for M01336167-I1. That is not by itself confirmation of activity on site.

    035
  36. Alteration now approved

    The latest status recorded for M01336167-I1 is “Permit Entire.”

    036