DOB filing M01322743-I1
Alteration filing at 717 Fifth Avenue
Building record · BIN 1035776
717 Fifth Avenue, Manhattan, NY 10022
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 17 independently sourced records, including 13 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1035776
717 Fifth Avenue
Midtown-Times Square, Manhattan
A consolidated public-record view · updated Oct 23, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 26-story condominium built in 1958, on a 29,475 sq ft lot.
Owner of record
711 FIFTH AVE PRINCIPAL OWNER LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 27, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 5 open notices on record for this building, out of 152 notices on file; the most recent was issued Jun 23, 2024.
Issued Jun 23, 2024 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023)
Issued Apr 22, 2023 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2022)
Issued Aug 21, 2022 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2021
2 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 27, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1035776. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 17 alteration filing. Its latest status categories are 4 recorded as completed, 13 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 717 Fifth Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 17 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
SPRINKLER MODIFICATIONS TAKING PLACE ON THE 20th FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. Filing M01004638-I1.
Filing M01004638-I1 reached an approved status.
Relocation and removal of sprinkler heads as per plans filed herewith. No change to use, egress or occupancy. Filing M01201119-S3.
Filing M01201119-S3 reached an approved status.
Sprinkler modifications taking place on the 13th and 14th floor ( 12a and 13th floor marketing) as per drawings filed herewith. no change in use, egress or occupancy. Filing M01322743-I1.
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON 13th and 14th FLOORS (12A and 14 MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. Filing M01322732-I1.
Plumbing modifications taking place on the 13th (12a marketing) and 14th floor as per drawings filed herewith. no change in use, egress or occupancy. Filing M01322740-I1.
Mechanical modifications taking place on 13th (12a marketing) and 14th floors as per drawings filed herewith. no change in use, egress or occupancy. Filing M01322736-I1.
Filing M01322743-I1 reached an approved status.
Filing M01322736-I1 reached an approved status.
Filing M01322732-I1 reached an approved status.
DOB lists a first permit date for M01322732-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01322736-I1. That is not by itself confirmation of activity on site.
Filing M01322740-I1 reached an approved status.
DOB lists a first permit date for M01322740-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01322743-I1. That is not by itself confirmation of activity on site.
Plumbing modifications takingplace on the 24 and 25th floor as per drawings filed herewith. no change in use, egress or occupancy. Filing M01417066-S2.
Mechanical modifications taking place on the 24th and 25th floor as per drawings filed herewith. no change in use, egress or occupancy. Filing M01417066-S1.
Filing M01417066-S2 reached an approved status.
Filing M01417066-S1 reached an approved status.
DOB lists a first permit date for M01417066-S2. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01417066-S1. That is not by itself confirmation of activity on site.
Sprinkler modifications taking place on the 22nd floor as per drawings filed herewith. no change in use, egress or occupancy. Filing M01441669-I1.
DOB lists a first permit date for M01004638-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01004638-I1 is “Permit Entire.”
Filing M01441669-I1 reached an approved status.
DOB lists a first permit date for M01201119-S3. That is not by itself confirmation of activity on site.
The latest status recorded for M01201119-S3 is “Permit Entire.”
DOB lists a first permit date for M01441669-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01441669-I1 is “Permit Entire.”
Protection and mechanical methods associated with interior demolition as per plans. Filing M01458557-I1.
Filing M01458557-I1 reached an approved status.
DOB lists a first permit date for M01458557-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01458557-I1 is “Permit Entire.”
Plumbing modifications takingplace on the 24 and 25th floor as per drawings filed herewith. no change in use, egress or occupancy. Filing M01417066-P1.
Filing M01417066-P1 reached an approved status.
The latest status recorded for M01417066-P1 is “Approved.”
The latest status recorded for M01417066-S2 is “Permit Entire.”
Mechanical modifications taking place on the 24th and 25th floor as per drawings filed herewith. no change in use, egress or occupancy. Filing M01417066-P2.
Filing M01417066-P2 reached an approved status.
The latest status recorded for M01417066-P2 is “Approved.”
The latest status recorded for M01417066-S1 is “Permit Entire.”
Filing herewith sprinkler work at existing 8th floor space. No change in use egress or occupancy. Filing M01460826-I1.
Filing M01460826-I1 reached an approved status.
The latest status recorded for M01460826-I1 is “Approved.”
Filing herewith interior renovation of existing 8th floor space, US Fertility. No change in use, egress or occupancy. Filing M01460770-I1.
DOB recorded a sign-off for M01322740-I1.
The latest status recorded for M01322740-I1 is “LOC Issued.”
DOB recorded a sign-off for M01322736-I1.
The latest status recorded for M01322736-I1 is “LOC Issued.”
Filing herewith mechanical work on existing 8th floor space, US Fertility. No change in use, egress or occupancy. Filing M01460770-S1.
Filing M01460770-I1 reached an approved status.
The latest status recorded for M01460770-I1 is “Approved.”
DOB recorded a sign-off for M01322732-I1.
The latest status recorded for M01322732-I1 is “LOC Issued.”
Filing herewith structural work on existing 8th floor space, US Fertility. No change in use, egress or occupancy. Filing M01460839-I1.
Filing M01460839-I1 reached an approved status.
The latest status recorded for M01460839-I1 is “Approved.”
Filing herewith plumbing work at existing 8th floor space, US Fertility. No change in use, egress or occupancy. Filing M01460770-S2.
Filing M01460770-S2 reached an approved status.
The latest status recorded for M01460770-S2 is “Approved.”
Filing M01460770-S1 reached an approved status.
The latest status recorded for M01460770-S1 is “Approved.”
DOB recorded a sign-off for M01322743-I1.
The latest status recorded for M01322743-I1 is “LOC Issued.”