DOB filing M01294527-P1
Alteration filing at 595 Madison Avenue
Building record · BIN 1036061
595 Madison Avenue, Manhattan, NY 10022
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 30 independently sourced records, including 24 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1036061
595 Madison Avenue
Midtown-Times Square, Manhattan
A consolidated public-record view · updated Oct 1, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 42-story office building built in 1929, on a 12,900 sq ft lot.
What it sold for
3 apartments on this tax block changed hands in the year the city last published, at a median of $2,000,000, from 1,200,000 to 2,500,000.
Recorded sale prices from the Department of Finance’s rolling file, covering the year to Aug 31, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.
Owner of record
FULLER MADISON LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 3, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 1 open notice on record for this building, out of 166 notices on file; the most recent was issued Jan 13, 1997.
Issued Jan 13, 1997
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 3, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1036061. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 30 alteration filing. Its latest status categories are 24 approved, 6 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 595 Madison Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 30 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Select facade repairs on all elevations and roof as indicated on drawings. Filing M01174001-I1.
Filing M01174001-I1 reached an approved status.
DOB lists a first permit date for M01174001-I1. That is not by itself confirmation of activity on site.
Plumbing work on the 34th floor (Grossman) as indicated on drawings. Filing M01214892-I1.
Filing M01214892-I1 reached an approved status.
DOB lists a first permit date for M01214892-I1. That is not by itself confirmation of activity on site.
Mechanical work on the 7th floor (Briony Raymond) as indicated on drawings. Filing M01248286-I1.
Construction work on the 7th floor (Briony Raymond) as indicated on drawings. Filing M01249354-I1.
Construction work on part of the 7th floor (MER relocation) as indicated on drawings. Filing M01249817-I1.
Filing M01249817-I1 reached an approved status.
Filing M01248286-I1 reached an approved status.
DOB lists a first permit date for M01248286-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01249817-I1. That is not by itself confirmation of activity on site.
Filing M01249354-I1 reached an approved status.
DOB lists a first permit date for M01249354-I1. That is not by itself confirmation of activity on site.
Interior demolition of non load bearing partitions on the 10th floor as indicated on drawings. Filing M01265231-I1.
Filing M01265231-I1 reached an approved status.
Plumbing work on the 5th floor (MB&F) as indicated on drawings. Filing M01245459-I1.
Mechanical work on the 5th floor (MB&F) as indicated on drawings. Filing M01245456-I1.
Construction work on the 5th floor (MB&F) as indicated on drawings. Filing M01245491-I1.
DOB lists a first permit date for M01265231-I1. That is not by itself confirmation of activity on site.
Filing M01245459-I1 reached an approved status.
Filing M01245491-I1 reached an approved status.
DOB lists a first permit date for M01245491-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01245459-I1. That is not by itself confirmation of activity on site.
Filing M01245456-I1 reached an approved status.
DOB lists a first permit date for M01245456-I1. That is not by itself confirmation of activity on site.
Sprinkler work on part of the 23rd floor (Markets Group) as indicated on drawings. Filing M01294527-I1.
Plumbing work on part of the 23rd floor (Markets Group) as indicated on drawings. Filing M01294521-I1.
Filing M01294527-I1 reached an approved status.
Filing M01294521-I1 reached an approved status.
DOB lists a first permit date for M01294527-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01294521-I1. That is not by itself confirmation of activity on site.
Installation of temporary custom color sidewalk shed as per plan. no change in use, egress,or occupancy. the sidewalk shed at madison avenue and east 57th street elevations. Filing M01344380-I1.
Filing M01344380-I1 reached an approved status.
DOB lists a first permit date for M01344380-I1. That is not by itself confirmation of activity on site.
Mechanical work on the 10th floor (Dublin & Co.) as indicated on drawings. Filing M01351964-I1.
Construction work on the 10th floor (Dubin & Co.) as indicated on drawings. Filing M01351950-I1.
Filing M01351950-I1 reached an approved status.
DOB lists a first permit date for M01351950-I1. That is not by itself confirmation of activity on site.
Filing M01351964-I1 reached an approved status.
DOB lists a first permit date for M01351964-I1. That is not by itself confirmation of activity on site.
Plumbing work on the 21st floor (Marina B) as indicated on drawings. Filing M01375221-I1.
Filing M01375221-I1 reached an approved status.
DOB lists a first permit date for M01375221-I1. That is not by itself confirmation of activity on site.
Construction work on the 25th floor as indicated on drawings. Filing M01408195-I1.
Filing M01408195-I1 reached an approved status.
DOB lists a first permit date for M01408195-I1. That is not by itself confirmation of activity on site.
Structural work on the 19th floor (18th floor ceiling) as indicated on drawings. Filing M01395923-I1.
Filing M01395923-I1 reached an approved status.
DOB lists a first permit date for M01395923-I1. That is not by itself confirmation of activity on site.
Construction work on the 25th floor as indicated on drawings. Filing M01408195-P1.
The latest status recorded for M01408195-I1 is “Permit Entire.”
Filing M01408195-P1 reached an approved status.
The latest status recorded for M01408195-P1 is “Approved.”
DOB recorded a sign-off for M01174001-I1.
The latest status recorded for M01174001-I1 is “LOC Issued.”
DOB recorded a sign-off for M01249354-I1.
The latest status recorded for M01249354-I1 is “LOC Issued.”
The latest status recorded for M01375221-I1 is “Permit Entire.”
Construction work on the 5th floor (MB&F) as indicated on drawings. Filing M01245491-P2.
DOB recorded a sign-off for M01214892-I1.
The latest status recorded for M01214892-I1 is “LOC Issued.”
Filing M01245491-P2 reached an approved status.
The latest status recorded for M01245491-P2 is “Approved.”
The latest status recorded for M01245456-I1 is “Permit Entire.”
Mechanical work on the 5th floor (MB&F) as indicated on drawings. Filing M01245456-P1.
Filing M01245456-P1 reached an approved status.
The latest status recorded for M01245456-P1 is “Approved.”
The latest status recorded for M01245491-I1 is “Permit Entire.”
DOB recorded a sign-off for M01344380-I1.
The latest status recorded for M01344380-I1 is “LOC Issued.”
Construction work on the 10th floor (Dubin & Co.) as indicated on drawings. Filing M01351950-P1.
Filing M01351950-P1 reached an approved status.
The latest status recorded for M01351950-P1 is “Approved.”
Construction work on the 13th floor (Edie Parker) as indicated on drawings. Filing M01414115-I1.
Sprinkler work on the 13th floor (Edie Parker) as indicated on drawings. Filing M01414181-I1.
Plumbing work on the 13th floor (Edie Parker) as indicated on drawings. Filing M01414158-I1.
Mechanical work on the 13th floor (Edie Parker) as indicated on drawings. Filing M01414121-I1.
Plumbing work on the 5th floor (MB&F) as indicated on drawings. Filing M01245459-P1.
Filing M01414115-I1 reached an approved status.
Filing M01414181-I1 reached an approved status.
The latest status recorded for M01414181-I1 is “Approved.”
Filing M01414158-I1 reached an approved status.
The latest status recorded for M01414158-I1 is “Approved.”
Filing M01414121-I1 reached an approved status.
DOB lists a first permit date for M01414121-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01414121-I1 is “Permit Entire.”
Filing M01245459-P1 reached an approved status.
The latest status recorded for M01245459-P1 is “Approved.”
The latest status recorded for M01245459-I1 is “Permit Entire.”
DOB lists a first permit date for M01414115-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01414115-I1 is “Permit Entire.”
DOB recorded a sign-off for M01294521-I1.
The latest status recorded for M01294521-I1 is “LOC Issued.”
Mechanical work on the 7th floor (Briony Raymond) as indicated on drawings. Filing M01248286-P1.
The latest status recorded for M01249817-I1 is “Permit Entire.”
Structural work for the cooling tower railing extension on the 18th floor as indicated on drawings. Filing M01435000-I1.
Filing M01248286-P1 reached an approved status.
The latest status recorded for M01248286-P1 is “Approved.”
The latest status recorded for M01248286-I1 is “Permit Entire.”
Filing M01435000-I1 reached an approved status.
The latest status recorded for M01435000-I1 is “Approved.”
The latest status recorded for M01351950-I1 is “Permit Entire.”
DOB recorded a sign-off for M01265231-I1.
The latest status recorded for M01265231-I1 is “LOC Issued.”
The latest status recorded for M01351964-I1 is “Permit Entire.”
Sprinkler work on part of the 23rd floor (Markets Group) as indicated on drawings. Filing M01294527-P1.
Structural work on the 19th floor (18th floor ceiling) as indicated on drawings. Filing M01395923-P1.
Filing M01395923-P1 reached an approved status.
The latest status recorded for M01395923-P1 is “Approved.”
The latest status recorded for M01395923-I1 is “Permit Entire.”
Filing M01294527-P1 reached an approved status.
The latest status recorded for M01294527-P1 is “Approved.”
The latest status recorded for M01294527-I1 is “Permit Entire.”