DOB filing M01444877-I1
Alteration filing at 767 5 Avenue
Building record · BIN 1036082
767 5 Avenue, Manhattan, NY 10153
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 18 independently sourced records, including 15 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1036082
767 5 Avenue
Midtown-Times Square, Manhattan
A consolidated public-record view · updated Sep 8, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 50-story office building built in 1968, on a 84,350 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 12, 2026. They describe the tax lot, not any single filing.
Violation record
The Department of Buildings has 10 open notices on record for this building, out of 480 notices on file; the most recent was issued Dec 1, 2022.
Issued Dec 1, 2022 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
Issued Nov 12, 2015
Issued Nov 12, 2015
7 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 10, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1036082. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 18 alteration filing. Its latest status categories are 14 approved, 3 recorded as completed, 1 under review. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 767 5 Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 18 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Remedial Facade work associated with FISP cycle 9A as per plans filed herewith. No change in use, egress or occupancy under this application. Filing M01083766-I1.
Filing M01083766-I1 reached an approved status.
DOB lists a first permit date for M01083766-I1. That is not by itself confirmation of activity on site.
Modification to existing HVAC system as per plans filed herewith. NO change in use, egress or occupancy. Filing M01222682-I1.
Filing M01222682-I1 reached an approved status.
DOB lists a first permit date for M01222682-I1. That is not by itself confirmation of activity on site.
Modification to existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application. Filing M01292976-I1.
Filing M01292976-I1 reached an approved status.
Modification to plumbing fixtures and related piping as shown on drawings. No change in use, egress or occupancy. Filing M01306825-S2.
Filing M01306825-S2 reached an approved status.
DOB lists a first permit date for M01306825-S2. That is not by itself confirmation of activity on site.
Removal and construction of interior partitions, doors and ceilings as shown on drawings. No change in use, egress or occupancy. Filing M01347660-I1.
Filing M01347660-I1 reached an approved status.
DOB lists a first permit date for M01347660-I1. That is not by itself confirmation of activity on site.
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy. Filing M01367182-S1.
Filing M01367182-S1 reached an approved status.
DOB lists a first permit date for M01367182-S1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01292976-I1. That is not by itself confirmation of activity on site.
Remove and construct interior partitions, doors and ceiling as shown on drawings. No change in use, egress or occupancy. Filing M01444786-I1.
INTERIOR demo & buildout of partitions, ceilings and doors. NO CHANGE IN USE, OCCUPANCY, AND EGRESS. Filing M01434038-I1.
Modification to existing Sprinkler & plumbing system as per plans filed herewith. No change in use, egress or occupancy under this application. Filing M01434067-I1.
The latest status recorded for M01434067-I1 is “Prof Cert QA Review.”
The latest status recorded for M01083766-I1 is “Permit Entire.”
Fit out of tenant suite on partial for 6th floor as PER PLAN CHANGES. No change in use, egress or occupancy. Filing M01434044-I1.
INTERIOR demo & buildout of partitions, ceilings and doors. NO CHANGE IN USE, OCCUPANCY, AND EGRESS. Filing M01434371-I1.
Filing M01434038-I1 reached an approved status.
Filing M01444786-I1 reached an approved status.
Filing M01434044-I1 reached an approved status.
DOB lists a first permit date for M01444786-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01444786-I1 is “Permit Entire.”
Filing M01434371-I1 reached an approved status.
Fit out of tenant suite on partial for 6th floor as PER PLAN CHANGES. No change in use, egress or occupancy. Filing M01434380-I1.
Modification to existing Sprinkler & plumbing system as per plans filed herewith. No change in use, egress or occupancy under this application. Filing M01434635-I1.
DOB lists a first permit date for M01434044-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01434044-I1 is “Permit Entire.”
DOB lists a first permit date for M01434038-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01434038-I1 is “Permit Entire.”
The latest status recorded for M01347660-I1 is “Permit Entire.”
Removal and construction of interior partitions, doors and ceilings as shown on drawings. No change in use, egress or occupancy. Filing M01347660-P1.
Filing M01347660-P1 reached an approved status.
The latest status recorded for M01347660-P1 is “Approved.”
Filing M01434635-I1 reached an approved status.
The latest status recorded for M01434635-I1 is “Approved.”
Filing M01434380-I1 reached an approved status.
DOB lists a first permit date for M01434380-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01434380-I1 is “Permit Entire.”
DOB lists a first permit date for M01434371-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01434371-I1 is “Permit Entire.”
DOB recorded a sign-off for M01222682-I1.
The latest status recorded for M01222682-I1 is “LOC Issued.”
Removal of interior partitions, doors and ceiling as shown on drawings. No change in use, egress or occupancy. Filing M01444877-I1.
Modification to existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application. Filing M01292976-P2.
DOB recorded a sign-off for M01306825-S2.
The latest status recorded for M01306825-S2 is “LOC Issued.”
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy. Filing M01444786-S1.
Modification/addition to sprinkler system and related piping as shown on drawings. No change in use, egress or occupancy. Filing M01444786-S2.
Filing M01444786-S2 reached an approved status.
The latest status recorded for M01444786-S2 is “Approved.”
Filing M01444877-I1 reached an approved status.
Filing M01292976-P2 reached an approved status.
The latest status recorded for M01292976-P2 is “Approved.”
Filing M01444786-S1 reached an approved status.
The latest status recorded for M01444786-S1 is “Approved.”
DOB recorded a sign-off for M01367182-S1.
The latest status recorded for M01367182-S1 is “LOC Issued.”
The latest status recorded for M01292976-I1 is “Permit Entire.”
DOB lists a first permit date for M01444877-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01444877-I1 is “Permit Entire.”