DOB filing M01380763-P4
Alteration filing at 360 Lexington Avenue
Building record · BIN 1036145
360 Lexington Avenue, Manhattan, NY 10017
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 14 independently sourced records, including 13 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1036145
360 Lexington Avenue
Murray Hill-Kips Bay, Manhattan
A consolidated public-record view · updated Oct 20, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 24-story office building built in 1959, on a 12,359 sq ft lot.
Owner of record
101 PARK AVENUE ASSOCIATES II LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 22, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 2 open notices on record for this building, out of 49 notices on file; the most recent was issued Jan 9, 2008.
Issued Jan 9, 2008
Issued May 23, 1989
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 22, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1036145. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 14 alteration filing. Its latest status categories are 2 under review, 11 approved, 1 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 360 Lexington Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 14 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Modify plumbing system to add connection for coffee maker on 5th floor Board Room and replace restroom fixtures on the 6th floor. Modification of the sprinkler system due to architectural change of layout. Filing M01295741-S2.
Filing M01295741-S2 reached an approved status.
DOB lists a first permit date for M01295741-S2. That is not by itself confirmation of activity on site.
SPRINKLER BUILDOUT AT 1st & 15TH FLOORS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. Filing M01380763-S7.
Filing M01380763-S7 reached an approved status.
PLUMBING WORK FILED IN CONJUNCTION WITH OFFICE BUILDOUTS ON 1st & 17th FLOORS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. Filing M01380763-S6.
Mechanical work filed in conjunction with GC, for office buildout for the 15 floor. No change in use, occupancy or egress. Filing M01380763-S5.
Filing M01380763-S6 reached an approved status.
Filing M01380763-S5 reached an approved status.
Modify plumbing system to add connection for coffee maker on 5th floor Board Room and replace restroom fixtures on the 6th floor. Modification of the sprinkler system due to architectural change of layout. Filing M01295741-P1.
Filing M01295741-P1 reached an approved status.
The latest status recorded for M01295741-P1 is “Approved.”
DOB recorded a sign-off for M01295741-S2.
The latest status recorded for M01295741-S2 is “LOC Issued.”
DOB lists a first permit date for M01380763-S6. That is not by itself confirmation of activity on site.
DOB received filing M01363923-I1.
DOB received filing M01363908-I1.
DOB lists a first permit date for M01380763-S7. That is not by itself confirmation of activity on site.
Filing M01363923-I1 reached an approved status.
Filing M01363908-I1 reached an approved status.
The latest status recorded for M01363908-I1 is “Approved.”
PLUMBING WORK FILED IN CONJUNCTION WITH OFFICE BUILDOUTS ON 1st & 17th FLOORS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. Filing M01380763-P2.
SPRINKLER BUILDOUT AT 1st & 15TH FLOORS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. Filing M01380763-P3.
Mechanical work filed in conjunction with GC, for office buildout for the 15 floor. No change in use, occupancy or egress. Filing M01380763-P1.
DOB lists a first permit date for M01363923-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01363923-I1 is “Permit Entire.”
Interior office buildout on 15th and new accessory tenant fitness center on ground floor. No change in use, occupancy, or egress. Filing M01380763-P4.
Existing commercial space, interior renovation modify partition for proposed at first floor, finish painting throughout, plumbing and mechanical work at DOB now application; no change in use, egress or occupancy. Filing M01456370-I1.
Existing commercial space, plumbing system in conjunction with job #m01456370, obtain plumbing permit for the install plumbing fixtures works at the first floor and cellar. Filing M01456370-S1.
Filing M01456370-I1 reached an approved status.
The latest status recorded for M01456370-I1 is “Approved.”
Filing M01380763-P2 reached an approved status.
The latest status recorded for M01380763-P2 is “Approved.”
Filing M01380763-P3 reached an approved status.
The latest status recorded for M01380763-P3 is “Approved.”
Filing M01380763-P1 reached an approved status.
The latest status recorded for M01380763-P1 is “Approved.”
The latest status recorded for M01380763-S7 is “Permit Entire.”
The latest status recorded for M01380763-S6 is “Permit Entire.”
The latest status recorded for M01380763-S5 is “Approved.”
Filing M01456370-S1 reached an approved status.
The latest status recorded for M01456370-S1 is “Approved.”
The latest status recorded for M01380763-P4 is “Prof Cert QA Review.”
Existing commercial space, mechanical system in conjunction with job #m01456370, obtain mechanical permit for the install nail salon ventilation system and HVAC system works. Filing M01456370-S2.
The latest status recorded for M01456370-S2 is “Plan Examiner Review.”